• Title/Summary/Keyword: steel girder bridge

Search Result 597, Processing Time 0.03 seconds

Development of Permit Vehicle Classification System for Bridge Evaluation in Korea (허가차량 통행에 대한 교량의 안전성 평가를 위한 허가차량 분류 체계 개발)

  • Yu, Sang Seon;Kim, Kyunghyun;Paik, Inyeol;Kim, Ji Hyeon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.12
    • /
    • pp.845-856
    • /
    • 2020
  • This study proposes a bridge evaluation system for indivisible permit vehicles such as hydraulic cranes. The permit loads for the bridge evaluation are divided into three categories: routine permit loads, special permit 1 loads, and special permit 2 loads. Routine permit and special permit 1 vehicles are allowed to cross a bridge with normal traffic. For these two permits, the standard lane model in the Korean Highway Bridge Design Code was adopted to consider normal traffic in the same lane. Special permit 2 vehicles are assumed to cross a bridge without other traffic. Structural analyses of two prestressed-beam bridges and two steel box girder bridges were conducted for the proposed permit loads. The rating factors of the four bridges for all permit loads were calculated as sufficiently large values for the moment and shear force so that crossing the bridges can be permitted. A reliability assessment of the bridges was performed to identify the reliability levels for the permit vehicles. It was confirmed that the reliability level of the minimum required strength obtained by the load-resistance factors yields the target reliability index of the design code for the permit vehicles.

Applicability Evaluation of Precast Deck to the Maglev Guideway System : Mock-Up Construction Test (프리캐스트 바닥판의 자기부상열차 가이드웨이 시스템 적용성 평가 : 모의 시공 실험)

  • Jin, Byeong-Moo;Kim, In-Gyu;Kim, Young-Jin;Oh, Hyung-Chul;Ma, Hyang-Wook;Lee, Yung-Seok
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.04a
    • /
    • pp.57-60
    • /
    • 2008
  • Maglev is a system that a train runs levitated above a rail. Therefore it is very important to maintain a constant levitation gap for achieving serviceability and ride comfort. This study is a cooperation research subject of the 3-1 subject, performance improvement of maglev track structures, of the Center for Urban Maglev Program in Korea, started in 2006. The aim of this study is development of rapid constructions of bridge superstructure for maglev. At present, precast deck is widely used because of its superiority to cast-in-place concrete on quality and the term of works. The research group suggested basic systems of maglev guideway with PSC-U type and trapezoidal open steel box type girder, and precast deck, cooperating with Korea Railroad Research Institute, the managing institute of the 3-1 subject. In this study, a mock-up consisted of girders, decks and rail was fabricated and test was performed for constructability, serviceability and maintenance evaluation of PSC U-type girder, precast deck, and new guide rail system.

  • PDF

Evaluation of Static Strength of Mixed Stud Shear Connection in Double Composite Bridges (이중합성 교량의 복합스터드 전단연결부의 정적강도 평가)

  • Kim, Hyun Ho;Shim, Chang Su;Yun, Kwang Jung;Lee, Pil Goo
    • Journal of Korean Society of Steel Construction
    • /
    • v.17 no.5 s.78
    • /
    • pp.549-559
    • /
    • 2005
  • A railway bridge with a double composite section is proposed to enhance the structural performance of existing two-girder bridges because the governing design parameter of railway bridges is the flexural stiffness. The concrete deck in negative moment regions is neglected in the design of continuous composite bridges assuming the concrete slab has no resistance to tension. Therefore, the flexural stiffness of the composite section in the negative moment region is reduced resulting in the increase of the depth of the steel section. In order to resolve this disadvantage, several methods are suggested and the double composite section is one of the excellent solutions for extending the span length and increasing the flexural stiffness. In this study, push-out tests on lying studs and mixed stud shear connection with lying and vertical studs were performed to investigate the behavior of the shear connection in the double composite section. Static strength of the shear connection was evaluated through the test results and numerical analyses.

Load Carrying Capacity Assessment of Bridges with Elastic Supports Application (탄성지점의 적용에 따른 교량의 내하력평가)

  • Yang, Seung-Hyun
    • Journal of Korean Society of Steel Construction
    • /
    • v.24 no.5
    • /
    • pp.595-603
    • /
    • 2012
  • This study applied elastic supports in order to evaluate load carrying capacity using measurement data obtained from load tests actively and utilizing various evaluation methods. In order to confirm the adequacy of structural analysis based on elastic supports and to improve the reliability of experiment results, we conducted a deflection test with flexural beams prepared as overhanging beams and, based on the results, performed precision safety diagnosis for real bridges under public service for improving the load carrying capacity evaluation method for bridges under public service. In the results of the bending test, compared to deflection calculated by the existing method, deflection obtained by applying elastic supports was closer to the actually measured deflection. In the results of evaluating load carrying capacity for a 3 span continuous steel box girder bridge just after its completion, load carrying capacity by elastic supports was smaller by up to 39% than that by the existing method. When the load carrying capacity of bridges is evaluated by the existing method the results vary among engineers due to lack of guidelines for evaluation such as the application of stress modification factor. This study was conducted as an effort to solve this problem through active research.

Development of Reliability-Based Optimum Design of High-Speed Railway Bridges Considering Structure-Rail Longitudinal Interaction and Structure-Vehicle Interaction Using Heuristic Decision Method (Heuristic Decision Method를 이용하여 구조물-궤도 종방향 상호작용 및 구조물-차량 상호작용을 고려한 고속철도 교량의 신뢰성 최적설계 기법 개발)

  • Ihm, Yeong-Rok
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.10 no.3
    • /
    • pp.31-38
    • /
    • 2010
  • In this study, it is suggested that it has to reliability-based design methodology with respect to bridge structure-rail longitudinal interaction and bridge structure-vehicle interaction. For the structural analysis, commercial package, ABAQUS, are used for a three-dimensional finite element analysis. The optimization process utilizes a well-known optimizer, ADS(Automated Design Synthesis). Optimization technique is utilized the ALM-BFGS method for global area search and Golden Section Method for 1-D search. In general, ALM-BFGS method don't need the 1-D search, and that algorithm converge a 0.1~0.2 of Push-Off factor. But in this study, value of Push-Off factor is used 90, therefore 1-D search should be needed for effective convergency. That algorithm contains the "heuristic decision method". As a result of optimum design of 2-main steel girder birdge with 5${\times}$(1@50m), design methodology suggested in this study was demonstrated more economic and efficient than existing design and LCC optimization not considering bridge-rail longitudinal interaction and bridge-vehicle interaction.

Flexural Experiment of PSC-Steel Mixed Girders and Evaluation for Analyses on Tangentional Stiffness of Connection (프리스트레스트 콘크리트-강 혼합거더의 휨 실험 및 경계면 수평계수 분석)

  • Kim, Kwang-Soo;Jung, Kwang-Hoe;Sim, Chung-Wook;Yoo, Sung-Won
    • Journal of the Korea Concrete Institute
    • /
    • v.20 no.2
    • /
    • pp.231-237
    • /
    • 2008
  • This study was performed to evaluate joint behavior of prestressed concrete(PSC)-steel mixed girders through the flexural test of 14 beams according to embedded length, amount of reinforcing steel, stud arrangement, and prestressing force. All test beams were failed by turns of desertion of reinforcing steel, stud, and steel plate. From test results, prestressing force was more effective on performance of connection than stud arrangement and reinforcing steel. And the spacing of stud is also more effective than embedding length. This paper also presented 3D nonlinear analysis considering the slip of composite section as well as the static load tests of PSC-steel mixed girders. According to the slip modulus, the nonlinear analysis showed that the behavior of hybrid girders could be divided into three parts as full-composite, partial-composite and non-composite. However, the experimental results showed that the PSC-steel hybrid girders with shear connectors took the part of partial composite action in ultimate load stage. In addition, it was founded that stud shear connectors and welded reinforcements were contributed to improve the ultimate strength of hybrid girders for about 20%.

The Research on the Curve of Maintenance Cost from Newly Constructed Steel Box Girder Bridge (최근 가설된 강상자형 교량의 보수.보강 공사비곡선 추정에 관한 연구)

  • Kim, Young-Woo;Shin, Yung-Seok
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2009.04a
    • /
    • pp.553-556
    • /
    • 2009
  • 최근 우리나라의 건설 분야에서는 생애주기비용(Life Cycle Cost;이하 LCC)/가치공학(Value Engineering; 이하 VE)을 적용한 구조물 설계가 실시되고 있다. 이는, 건설교통부에서 공공건설사업의 효율성을 제고하기 위하여 실시하고 있으며, 대통령령에 따라 "건설기술관리법시행령"을 제정하여 공공사업분 수행 절차와 기준을 법제화 하였으며 이후 시행령 38조 13의 "설계의 경제성등 검토" 실시를 의무화하는 시행지침을 작성하여 수행하고 있다. 이러한, LCC/VE의 검토에서 보수 보강 공사비 산정은 유지보수공사 프로파일링을 통한 보수 보강 시기를 산정(건설교통부, 2003)하여 교량 구성요소별 보수 교체 주기를 산정(건설교통부, 2001)에서 제시한 기간을 적용하여 LCC/VE를 평가하고 있다. 하지만, 이러한 보수 보강 공사비의 적용은 일괄적인 적용이며, 예전 국내의 교량 건설기술이 현재와 같이 발전된 상태에서의 현황이 아니므로 본 연구에서는 현재 고속국도에 완공되어 운용중인 교량 구조물을 시설물의 안전관리에 관한 특별법 시행령(2008)에 따른 "시설물의 안전점검 및 정밀안전진단 지침"에 의한 교량의 초기점검, 정밀점검 및 정밀안전진단 자료를 조사 분석하여 보수 보강 공사비 곡선을 추정하려 한다.

  • PDF

Flexural Behavior of Continuous Composite Bridges with Precast Concrete Decks

  • Chung, Chul-Hun
    • Journal of the Korea Concrete Institute
    • /
    • v.15 no.4
    • /
    • pp.625-633
    • /
    • 2003
  • For the construction of open-topped steel box girder bridges, prefabricated concrete slab could offer several advantages over cast-in-situ deck including good quality control, fast construction, and elimination of the formwork for concrete slab casting. However, precast decks without reinforcements at transverse joints between precast slabs should be designed to prevent the initiation of cracking at the joints, because the performance of the joint is especially crucial for the integrity of a structural system. Several prestressing methods are available to introduce proper compression at the joints, such as internal tendons, external tendons and support lowering after shear connection. In this paper, experimental results from a continuous composite bridge model with precast decks are presented. Internal tendons and external tendons were used to prevent cracking at the joints. Judging from the tests, precast decks in negative moment regions have the whole contribution to the flexural stiffness of composite section under service loads if appropriate prestressing is introduced. The validity of the calculation of a cracking load fur serviceability was presented by comparing an observed cracking load and the calculated value. Flexural behavior of the continuous composite beam with external prestressing before and after cracking was discussed by using the deflection and strain data.

A Study on Performance Evaluation of Masonry Thermal Bridge Blocking Brackets for Building Energy Efficiency (건축물에너지 효율을 위한 조적조 열교 차단 브라켓의 성능 평가 연구)

  • Kim, Woong-Hoi;Kim, Hyung-Kyu;Lee, Tae-Gyu;Lee, Jae-Hyun;Kim, Gyu-Yong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.175-176
    • /
    • 2023
  • The masonry structure is constructed by cement mortar binding material of brick objects and uses reinforced hardware(connected hardware or wall tie) together when building. However, over time, the corrosion of reinforced steel and the deterioration of joint mortar as well as bricks cause the risk of collapse. In particular, when the externally decorated brick wall is installed on the concrete girder for each floor, the angle bracket is not constructed or corroded, the full-layer weight load is applied to the wall of 0.5B, which is an example of full-scale or collapse. As a result of the evaluation, it was confirmed that the performance was improved compared to the existing bracket, and we plan to carry out a real-life test and long-term performance review of the building using the bracket in the future.

  • PDF

Experimental validation of FE model updating based on multi-objective optimization using the surrogate model

  • Hwang, Yongmoon;Jin, Seung-seop;Jung, Ho-Yeon;Kim, Sehoon;Lee, Jong-Jae;Jung, Hyung-Jo
    • Structural Engineering and Mechanics
    • /
    • v.65 no.2
    • /
    • pp.173-181
    • /
    • 2018
  • In this paper, finite element (FE) model updating based on multi-objective optimization with the surrogate model for a steel plate girder bridge is investigated. Conventionally, FE model updating for bridge structures uses single-objective optimization with finite element analysis (FEA). In the case of the conventional method, computational burden occurs considerably because a lot of iteration are performed during the updating process. This issue can be addressed by replacing FEA with the surrogate model. The other problem is that the updating result from single-objective optimization depends on the condition of the weighting factors. Previous studies have used the trial-and-error strategy, genetic algorithm, or user's preference to obtain the most preferred model; but it needs considerable computation cost. In this study, the FE model updating method consisting of the surrogate model and multi-objective optimization, which can construct the Pareto-optimal front through a single run without considering the weighting factors, is proposed to overcome the limitations of the single-objective optimization. To verify the proposed method, the results of the proposed method are compared with those of the single-objective optimization. The comparison shows that the updated model from the multi-objective optimization is superior to the result of single-objective optimization in calculation time as well as the relative errors between the updated model and measurement.