• 제목/요약/키워드: steel erection work

검색결과 26건 처리시간 0.023초

SAFETY EVALUATION OF THE SELF-SUPPORTED STEEL JOINT FOR STEEL ERECTION WORK

  • Goune Kang;Changki Kim;Taehoon Kim;Hunhee Cho;Kyung-In Kang
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.229-233
    • /
    • 2011
  • Recently, the scale of buildings has been increasing because of the high-rise trend and complexity of underground spaces. A significant number of steel structures have therefore been adopted for building construction. Since workers need to work in high places to install steel beams, many industrial accidents easily occur during steel-frame work. Furthermore, considering the increasing trend of building steel structures, the safety of the workers during the steel beam erection work is of concern. To improve the safety, a new type of joint, located between the steel column and beam, which can eliminate the need for working at the elevated height during steel beam erection has been developed in Korea. Using the newly developed technology in the construction field, the safety performance needs to be evaluated. This study presented the safety evaluation approach for the newly developed technology from the literature review, and applied the method to a self-supported steel joint. The result showed that applying the self-supported steel joint improved the safety of the steel erection work in terms of working posture, working environment, and risk exposure time.

  • PDF

자립형 철골 접합부를 이용한 철골설치 방식의 경제성 평가에 관한 연구 (A Study on Economic Evaluation Method of Steel Erection Work using by Self-supported Steel Joint)

  • 김창기;김태훈;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 추계 학술논문 발표대회
    • /
    • pp.3-7
    • /
    • 2009
  • Construction projects are being the skyscraper and the large size by limited site condition and developing construction technology. Therefore, Steel structure work is steadily increasing caused by easy to work and structural safety. However, steel-frame work has the large incidence of heavy accident potentially. Recently a research group has recently developed newly designed self-supported steel joint for enhancing safety of steel erection work. Before applying the steel joint in a construction site, economic evaluation should be performed. Thus, we proposed the method for measuring economic efficiency of the new steel joint and verified economic feasibility of the steel joint method through a case study. As a result, Steel erection method using by self-supported steel joint showed economic rather than the one using by H-beams.

  • PDF

철골세우기의 현장생산성 측정 및 영향요인 분석 (Productivity Measurement and Analysis on Factors in Steel Erection)

  • 이지용;허영기;안방률
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2008년도 추계 학술논문 발표대회
    • /
    • pp.123-127
    • /
    • 2008
  • As buildings becoming higher and more enormous the portion of steel works has been increased, which makes the schedule planning and management more significant. However, in actual construction sites, management is more based on a manager's construction experience than productivity data accumulated in previous projects. Moreover, most of the existing studies also featured a theoretical approach rather than an analysis of data straightforwardly collected in sites. In this study, a steel-erection site was visited to collect productivity data. The study found that there were significant disparities between aboveground work productivity and underground work. However, the productivities of 'first node on ground' and 'second node on ground' were estimated similar. The productivity data collected and factors affecting the productivity will help managers to plan and control their similar steel-erection works. This study will also be beneficial for those performing related studies.

  • PDF

철골세우기 작업의 영향요인별 현장생산성 측정 및 분석 (Productivity Measurement and Analysis on Factors in Steel Erection)

  • 허영기;이지용;윤석헌;태용호;안방률
    • 한국건축시공학회지
    • /
    • 제9권2호
    • /
    • pp.31-38
    • /
    • 2009
  • In today's construction industry, buildings have been more complicated and higher, the demands of steel works have been increasingly concerned, which makes the schedule planning and management more significant. However, in actual construction sites, management is more based on a manager's construction experience than productivity data accumulated in previous projects. Moreover, most of the existing studies also featured a theoretical approach rather than an analysis of data straightforwardly collected in sites. In this study, a steel-erection site was visited to collect productivity data. The study found that there were significant disparities between aboveground work productivity and underground work; one tower crane operated work and two tower crane operated; and work productivity conducted in clear weather condition, cloud and rainy. However, the productivities of 'first node on ground' and 'second node on ground' were estimated similar. The productivity data collected and factors affecting the productivity will help managers to plan and control their similar steel-erection works. This study will also be beneficial for those performing related studies.

가변요인을 고려한 철골세우기 작업의 탄소배출 인과지도 개발 (Development of Carbon Emission Casual Map Considering Variable Factors in Steel Erection Work)

  • 남철우;이동윤;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 추계 학술논문 발표대회
    • /
    • pp.75-76
    • /
    • 2016
  • Because of variable factors in construction phase, measurement of carbon emission in construction industry is more difficult than in other industries. To enhance accuracy of the measurement, the impact of variable factors must be considered. In this paper, to understand the influence of variable factors in steel erection work, a carbon emission casual map was developed. The map demonstrates that the considerations of variable factors in measurement of carbon emission improves the accuracy. The results of this paper are expected to contribute to development of carbon emission casual map and carbon emission measurement model for the entire construction phase.

  • PDF

국내 건축물 조립용 철근 배근현황 및 개선방안에 관한 연구 (A Study on the Improvement of Erection Bar Detailing in Domestic Building Construction)

  • 정현옥;조훈희;박우열
    • 한국건축시공학회지
    • /
    • 제9권2호
    • /
    • pp.39-46
    • /
    • 2009
  • The erection bar is defined as the assistant bar used to fix the position of the reinforcing steel as the reinforcing steel is placed on site. As the erection bar do not bear the structural load and is not showed in the structural drawings, it is not managed importantly. But as chair bars in mat footing is used in large quantities to support the upper main bars, the detailing standards need to be suggested. and some erection bar is placed by experience of the fabricator and placer. Therefore, in this study, a survey about the erection bars was conducted to the reinforcement detailer, the fabricator and placer of domestic construction industry. 11 placing drawings is analyzed to find out the problems of detailing and the quantities of the erection bars. According to the analysis of the survey, the erection bar details in placing drawings were not standardized, and some erection bars are omitted in placing drawings. The improvement in the erection bar detailing was sought by analyzing the results of the survey.

경제적 철골제작$\cdot$설치 및 공기단축 사례분석연구 (Case Study on Economical Fabrication and Erection of Steel Structure and Reduction in Field Erection Time)

  • 안재봉;최윤기
    • 한국건설관리학회논문집
    • /
    • 제5권5호
    • /
    • pp.183-192
    • /
    • 2004
  • 현재 국내에도 건물의 특성에 알맞은 가변적이며 대공간 확보가 가능하고 사용부재의 두께가 수mm에서 100mm에 이르는 극후판 두께의 건축 철골구조의 건축물 및 Box형 강재교량으로 구축되는 사례가 증가하면서 철골부재의 제작 및 가공기술이 예전보다 더욱 향상되고 구조물로서의 품질관리에 대한 신뢰성의 요구도 증가되고 있는 실정이다, 그러나 국내의 철골조 건축부재의 구조설계는 설계사대로 각기 이루어지고 해당 부재는 공장별로 제작진행되어 그 기술수준에는 보이지 않는 상당한 격차가 있다고 보여지며 업체별로 경제성 등을 고려하여 기본적이며 일반적 철골제작기법을 간결하게 적용하는 것에 머물러 고도한 선진적인 기술의 채용은 대부분 주저할 수 밖에 없는 상황이다 또한, 중소규모의 빌딩 건축물들의 철골조 설계적용을 고려해볼 때 수많은 접합부의 표준화를 비롯하여 구조체 전체의 표준화 및 내$\cdot$외장재까지 포함된 시스템건축의 건축물설계와 부재의 제작 및 설치기술 개발경향도 엿보이고 있는 가운데 특히, 철골부재의 공장제작과 현장설치의 보다 경제적이고 짧은 공기내에 완전한 품질을 확보할 수 있는 부재간의 접합부 설계에 대한 연구검토는 철골분야에 종사하는 업계는 물론 현장 관계자에게도 의미있는 일일 것이다. 본 논문에서는 철골조 건축물의 특성을 알아보고 철골구조물 공장제작 및 현장설치공기를 최대한 단축할 수 있는 철골기둥과 기둥, 기둥과 큰보부재 접합부 변경사례 및 Box Column의 용접자동화, 로봇화에 의한 철골기둥 부재제작사례와 금후 철골구조물 제작상의 문제점과 대응방안에 대하여 서술하고자 한다.

The Productivity Improvement for Steel Framing Work Efficiency by Work Sampling and 5-minute Rating Technique

  • Chang, SooWon;Yi, June-Seong;Son, JeongWook
    • Journal of Construction Engineering and Project Management
    • /
    • 제5권1호
    • /
    • pp.40-46
    • /
    • 2015
  • This study presents the results of our analysis and recommendations for process and productivity improvements. The project studied consists of a 5-story research building, with a structure of steel frames supporting concrete slabs. The observations focused on the analysis of the overall erection and framing process. The methods used for the analysis consisted in intensive visits on site, where construction processes were observed in term of resources, activities, durations, materials' handling procedures, and technology used. Back to the office, authors used the information captured to model the different trades' activities, using work sampling and 5-minute rating technique. The work sampling provides insight into the activity, hence allowing for process improvements. The productivity of various trades is strongly dependent on the organization of the work process and work site conditions. Improving the productivity of the entire project or company is not possible until everyone is committed to improvement.

조선 탑재용접용 대입열 수직자동용접법의 개발에 관한 연구 (A Study on the Development of High Deposition Automatic Vertical Welding of Erection Stage in Shipbuilding)

  • 박주용;최우현
    • Journal of Welding and Joining
    • /
    • 제26권5호
    • /
    • pp.66-73
    • /
    • 2008
  • Welding work in pre-erection or erection stage of shipbuilding construction to be carried out in flat and vertical upward position mostly and Electrogas welding(EGW) is actively applied especially for vertical butt joint of thicker steel plate recently. In this study considered how to develope and improve mechanical properties of weld metal and HAZ in high heat input welding processes such as EGW and Electroslag welding(ESW) with its welding equipment in order to extend the application range to the longitudinal members and hatch coaming parts of container ship. Some components of welding system and parameters were modified to get the faster travel speed and reduce weld heat input, and also by adding additional filler rods or tubes increase the amount of deposited weld metal. With the test get some good date can apply to actual fabrication work and recommend items to manufacture welding materials make better. Above all things it's a fruition that to prepare the possibility of application of ESW to shipbuilding construction which fill up the gap of stoppage days of more than 20 years.

Evaluation of Three Support Shapes on Behavior of New Bolted Connection BBCC in Modularized Prefabricated Steel Structures

  • Naserabad, Alifazl Azizi;Ghasemi, Mohammad Reza;Shabakhty, Naser;Arab, Hammed Ghohani
    • 국제강구조저널
    • /
    • 제18권5호
    • /
    • pp.1639-1653
    • /
    • 2018
  • Bolted connections are suitable due to high quality prefabrication in the factory and erection in the workplace. Prefabrication and modularization cause high speed of erection and fabrication, high quality and quick return of investment. Their technical hitches transportation can be removed by prefabrication of joints and small fabrication of components. Box-columns are suitable members for bolted structures such as welded steel structures with moment frames in two directions etc., but their continual fabrication in multi-story buildings and performing the internal continuity plate in them will cause some practical dilemmas. The details of the proposal technique introduced here, is to remove such problems from the box columns. Besides, some other advantages include new prefabricated bolted beam-to-column connections referred to BBCC. This connection is a set of plates joined to columns, beams, support, and bolts. For a better understanding of its fabrication and erection techniques, two connection and one structural maquettes are made. The present work aims to study the cyclic behavior of connection numerically. To verify the accuracy of model, a similar tested connection was modelled. Its verification was then made through comparison with test results. The behavior of connection was evaluated for an exterior connection using three different support shapes. The effects of support shapes on rigidity, ductility, rotation capacity, maximum strength, four rad rotation strength were compared to those of the AISC seismic provision requirements. It was found that single beams support has all the AISC seismic provision requirements for special moment frames with and without a continuity plate, and box with continuity plate is the best support in the BBCC connection.