• Title/Summary/Keyword: staff schedule

Search Result 33, Processing Time 0.024 seconds

AN ANALYSIS ON FACTORS AFFECTING SCHEDULE PERFORMANCE OF PUBLIC HOUSING PROJECTS: CASE OF SINGAPORE

  • Bon-Gang Hwang;Xianbo Zhao;Si Yi Ng
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.412-418
    • /
    • 2013
  • With the increasing demand for public housing, the Singapore government decided to reduce the waiting time of future public housing owners, which requires these projects to be completed on time. As a result, this study aims to identify the frequent and impactful factors affecting schedule performance of public housing projects in Singapore. The survey conducted with 36 industry experts revealed that "site management", "coordination among various parties", "design changes by owner during construction", "availability of laborers on site", "availability of material", and "availability of staff to manage projects" were the six factors that should be emphasized to assure the schedule performance of public housing projects. In addition, there was statistically significant agreement between public housing projects and other building projects on both the frequency and impact ranks of the factors. The findings from this study will help practitioners involving public housing projects to take measures to assure the achievement of project schedule objectives.

  • PDF

A Call Analysis and Design.Implementation of Simulation Model in the Call Center (콜 센터에서의 인입호 분석과 시뮬레이션 모델 설계 및 구현)

  • 김윤배;이창헌;이계신;이병철
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 2003.11a
    • /
    • pp.75-85
    • /
    • 2003
  • With recent advances in technology and the changing nature of business, call center management has become a rapidly growing industry. However theoretical analysis about the call center system is very difficult, and the forecasting of call volume also. In the situation, it is significant that we study call-flow system, design system model and perform simulation. If these are possible, it is able to control the staff schedule and the resource management efficiently. This study introduces the process of applying the call center to simulation. So, it is feasible to break from the intuitive management by a minority manager and analyze it scientifically. The enterprise can reduce unnecessary expense, make an offer high quality to user in a keen competition

  • PDF

Maintenance Staff Scheduling at Afam Power Station

  • Alfares, H.K.;Lilly, M.T.;Emovon, I.
    • Industrial Engineering and Management Systems
    • /
    • v.6 no.1
    • /
    • pp.22-27
    • /
    • 2007
  • This paper describes the optimization of maintenance workforce scheduling at Afam power station in Nigeria. The objective is to determine the optimum schedule to satisfy growing maintenance labour requirements with minimum cost and highest efficiency. Three alternative maintenance workforce schedules are compared. The first alternative is to continue with the traditional five-day workweek schedule currently being practiced by Afam power station maintenance line. The second alternative is to switch to a seven-day workweek schedule for the morning shift only. The third alternative is to use a seven-day workweek schedule for all three work shifts. The third alternative is chosen, as it is expected to save 11% of the maintenance labour cost.

Determinants of Quality in Outpatient Medical Service (외래 의료서비스 질적 수준의 결정요소)

  • Park, Sook-Hee;Kim, Seok-Beom;Kang, Pock-Soo
    • Quality Improvement in Health Care
    • /
    • v.5 no.2
    • /
    • pp.176-189
    • /
    • 1998
  • This study was conducted to evaluate the subjective ideas about the determinants of quality in ambulatory care unit among outpatients and medical staff of a university hospital, and to compare the differences of the ideas, between patients themselves and hospital staff. A self-administered questionnaire survey was conducted covering 799 outpatients and 190 hospital staff in March, 1998. The questionnaire included general characteristics and 26 determinants of ambulatory care quality. The following are summaries of the findings: 1. Both of outpatients and hospital staff perceived, "Physician's knowledge" as the most important determinant of medical care quality. 2. In respect of 7 determinants related to physician's knowledge and skill, both outpatients and hospital staff perceived "physician's knowledge and skill" as important determinants. The scores of determinants such as, "Not doing unnecessary examinations", and "Assignment of adequate number of patients and duty schedule for the physician" were significantly different between outpatients and hospital staff. 3. In respect of 4 determinants related to doctor-patient relationship, both outpatients and hospital staff perceived "attention to patient's complaints" as the most important determinant. The scores related to the determinants such as "kindness of physician" and "explanation of treatment outcome" were significantly different between outpatients and hospital staff. 4. Among the amenities related determinants, "Modern facilities and equipments" were perceived as the most important determinant in both group. 5. In respect of 8 determinants related to non-financial accommodation, outpatients perceived, "Waiting hours for treatment" as the most important determinant, and hospital staff perceived, "Kindness of hospital staff". 6. In respect of 4 determinants related to financial accommodation, outpatients perceived, "Fare account of medical cost" as the most important determinant, and hospital staff perceived, "Increasing reimbursements". Further comprehensive research should be made on the evaluation of perceptions of medical care quality, both of outpatient and inpatient care, among patients and hospital staff. So good quality in medical care will be achieved based on clients' needs.

  • PDF

A Study on the Development of Domestic-Oriented Prototype for EVMS Operation System by Using Work Task (작업관리 개념을 응용한 EVMS 운영 시스템 프로토타입 개발)

  • Park, Hong-Tae;Yang, Keum-Chul
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.10 no.6
    • /
    • pp.1281-1286
    • /
    • 2009
  • Our government operates earned value management system (EVMS)of construction schedule and cost for improving earned management system of the construction projects. but There is two unification Method construction schedule and cost to estimate construction progress currently. This weight a staff work. therefore this study present unification method which operate integrate schedule and cost by using work task. In order to inflect verification and model of schedule and cost, this study develop prototype of EVMS.

Evaluating Schedule Management Capability in Korean Construction Industry through Importance-Performance Analysis (IPA 방법을 활용한 국내 건설 산업 공정관리 역량 평가)

  • Lee, Jin Gang;Song, Bohyeon;Kim, Dain;Choi, Jaehyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.24 no.1
    • /
    • pp.145-156
    • /
    • 2024
  • In an era where construction projects are becoming increasingly large and complex, the Korean construction industry faces the challenge of implementing systematic and cohesive schedule management practices. This study initially delineates the concept of schedule management capabilities, systematically categorizing them into five distinct domains: law and regulations, requirements of project owners, capabilities of professionals and organizations, task capability, and the adoption of smart construction technologies for schedule management. Through a survey targeting industry professionals, this research assesses the perceived importance and the actual proficiency level in schedule management across these categories, employing an Importance Performance Analysis(IPA) to scrutinize these capabilities. The findings underscore the acknowledged significance of diverse aspects of schedule management, yet reveal discrepancies between the current proficiency levels and their perceived importance, pinpointing areas necessitating enhancement. Critical improvement needs identified encompass the planning of budgets for schedule management, development of regulations for assessing construction periods, deployment of specialized on-site staff for schedule management, and investment in advanced schedule management software solutions. Consequently, this study offers a nuanced analysis and strategic insights for enhancing schedule management practices, aiming to facilitate their effective implementation in the field.

A Design and Implementation of Bidding and Scheduling System for Ship Repair (선박수리를 위한 입찰 및 일정관리 시스템의 설계 및 구현)

  • Kang, Hyo-woon;Kim, Jindeog
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.19 no.7
    • /
    • pp.1585-1592
    • /
    • 2015
  • Currently, the existing schedule management of ship repair has depended on hand-written notes of engineering manager in the repair ship yard. Simple management based on the hand-written notes is inefficient because current states of equipments and staff are not graspable in real-time. To solve this problem, the ICT based scheduling method is required in ship repair industry. In this paper, we propose a system based on ICT which manages schedules for repairing ships. The proposed system solves the problem occurred by the management to use the hand-written notes. Because the system has a function to report the current state of ship repair, it is able to cope with various problems, such as delay, wrong repair and so on. Moreover, the system is able to maximize the efficiency of ship repair process due to efficient management to staff and equipment.

A Study on the Importance-Performance Analysis of Farm Party Participants (팜파티 속성에 대한 중요도-만족도 분석(IPA) 연구)

  • Kim, Seon-Hee
    • Journal of Agricultural Extension & Community Development
    • /
    • v.22 no.1
    • /
    • pp.69-78
    • /
    • 2015
  • This study conducted IPA of each item related to the farm party operation aiming at the participants to farm parties. The survey was carried out on the participants to the farm parties held in Damyang County from October 11th to November 22nd, 2014, and 103 questionnaires were used for the final analysis. The specific results of the IPA are as follows. In the first quarter of 'maintenance and management performance' are included the total of seven items. They are a harmonious view with the surrounding environment, friendliness of the farmer and the party staff, posting the event schedule and providing the program, proper disposition of the staff in the farm, an exchange among farm party participants, food that makes use of farm produce and the convenience of gaining information. In the second quarter of 'intensive improvement' are included eight items. They are cleanliness of the facilities such as restroom and basin, providing the pamphlets or promotion materials of the farms in the farm party, things to experience utilizing the farm produce grown in the host farm, various events, smooth progress of the farm party program, inclusion of the indigenous native food, variety of things to buy including farm produce and information delivery about the farm produce on sale.

Intern rotational schedule in integrated residency training program for medical staff (병원군별 전공의 총정원제에서의 인턴 순환근무 수련일정계획)

  • 강성민
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2003.05a
    • /
    • pp.81-86
    • /
    • 2003
  • 다수의 수련병원이 단일 병원군을 형성하려 전공의를 공동으로 모집선발하고, 또한 공동 책임에 수련시키는 전공의 통합수련프로그램인 "병원군별 전공의 총정원제"에서 인턴 순환근무 수련일정 계획은 순환교육과 임상경험을 위란 인턴의 일년간 수련일정을 수립하는 의사결정문제이다. 전공의의 순환배치와 관련하여 병원간의 갈등 또는 인턴의 불만 등이 발생할 수 있기에 병원군별 전공의 총정원제는 질적으로 우수하면 객관적인 인턴수련일정을 필요로 한다. 본 논문은 인턴일정계획의 수리모형을 제시하고, 면실의 데이터를 사용해 산출된 순환일정을 다각도로 분석한 결과를 제시한다. 작성된 수련일정은 9개병원이 참여한 CMC병원군에서 2003년 현재 263명 인턴의 일년수련 순환배지에 사용되고 있다.

  • PDF

A Fuzzy Logic Based Software Development Cost Estimation Model with improved Accuracy

  • Shrabani Mallick;Dharmender Singh Kushwaha
    • International Journal of Computer Science & Network Security
    • /
    • v.24 no.6
    • /
    • pp.17-22
    • /
    • 2024
  • Software cost and schedule estimation is usually based on the estimated size of the software. Advanced estimation techniques also make use of the diverse factors viz, nature of the project, staff skills available, time constraints, performance constraints, technology required and so on. Usually, estimation is based on an estimation model prepared with the help of experienced project managers. Estimation of software cost is predominantly a crucial activity as it incurs huge economic and strategic investment. However accurate estimation still remains a challenge as the algorithmic models used for Software Project planning and Estimation doesn't address the true dynamic nature of Software Development. This paper presents an efficient approach using the contemporary Constructive Cost Model (COCOMO) augmented with the desirable feature of fuzzy logic to address the uncertainty and flexibility associated with the cost drivers (Effort Multiplier Factor). The approach has been validated and interpreted by project experts and shows convincing results as compared to simple algorithmic models.