접근수로의 유황 파악과 안정적인 흐름조건을 만족시키는 여수로 유도벽 설계를 위하여 수치모의를 수행하였다. 복잡한 지형 재현이 용이한 2차원 유한요소모형인 RMA-2를 사용하였으며, 수리모형실험의 결과를 이용하여 모형의 매개변수를 추정하였다. 세부구간과 확장구간으로 나누어서 수치모의를 수행하였으며, 이를 통하여 경계의 영향을 무시할 수 있는 수리모형실험의 상류경계의 위치를 설정하였다. 접근수로 내의 흐름을 안정화시키기 위하여 유도벽의 대안 설계를 하였으며, 이에 대한 수치모의를 통해서 각 대안에 대하여 흐름해석을 하였다. 대안설계에 대한 해석결과, 접근수로 내의 유황이 안정적이며 횡방향 수위편차가 여수로 월류부 전면에서 거의 해소되는 것으로 나타났다.
This study re-exams hydrologic stability on spillway outlet capacity of agricultural reservoirs using hydrologic data with current rainfall condition instead of project hydrologic data applied at design on Backgok reservoir located in Chungbuk province. It is concluded that Backgok reservoir is not hydrologically stable and therefore structural measures including the extension of spillway and non structural measures should be taken. Continuous basic plan for river maintenance including additional bank reinforcement to bottom river shall be carried out. Due to high peak flood with more than 290% compared to 200 year frequency probability flood which was design standard of the past in view of the results of calculating PMF according to revised design standard for reservoirs, there could a problem for securing rationality in case of applying PMF with design flood. Therefore, hydrological stability, construction, and maintenance cost shall be synthetically studied and reasonal application shall be made if the decision is made on applying PMF with design flood.
In this study, various hydraulic phenomena were analyzed from the dam model experiments and the analyzed results were compared with existing computation results. Sungduk dam model structures were constructed using Froude similarity law by 1:50 scale. From the measurements of hydraulic phenomena at spillway channel, an improvement method was trying to be suggested over shortcoming of existing design plan. The result of model experiment showed no big difference with that of each part's numerical interpretation. Sidewall overflows were observed, as water conveyance occurred due to the linear characteristics of spillways, which raised the necessity for improving the linear forms of spillways. Also, it was judged to be necessary improving load pressure and establishing protective structures at the riverbed grounds of downstream channels.
Flood routing is one of the most important engineering problems for the design of a spillway, and the procedures for the routing should be thoroughly understood by the engineers engaged in the planning of a spillway. There are many methods for the flood routing such as Muskingum, Steinberg, Puis, Holton, Goodrich, Rutter, Graves, Snyder, etc., which are being used in many countries. This article introduces the theory of the modified PuIs Method in detail which is exclusively being used in the Bureau of Reclamation, Department of Interior, U.S.A. Also, this article includes a routing example worked by the writter for the Ee-dong Reservoir of the Ki-ho Irrigation Association. in Kyong-gi Province.
본 연구에서는 절대적인 안전성이 요구되는 댐의 홍수방어능력을 확보하기 위해서 나팔형 여수로를 가진 기존댐에 대한 수리 수문학적 안전성을 평가하였다. 검토결과 현재의 설계홍수량인 520cms(EL. 170.30m)에 대해서는 홍수소통과 연직관의 부압발생의 문제가 없는 것으로 나타났으나, 오리피스 흐름으로 변환되는 EL. 170.70m를 초과하는 방류에는 한계가 있는 것으로 나타났으며, 웨어의 정점 부근에서 부압발생의 가능성이 있는 것으로 판단된다. 여유고를 고려한 댐최고수위는 EL. 170.5m를 넘지 않아야 하는데, 금번 저수지 홍수추적 결과 댐최고수위 EL. 172.46m로 약 2m 상회하는 것으로 나타나 이에 대한 근본적인 대책이 필요하다고 판단된다.
농업용 저수지의 경우, 인위적인 홍수조절 기능이 없어 홍수 발생 시 급격한 저수지 수위상승에 따른 월류로 인해 제체의 파괴위험이 높고, 예 경보 없이 상류에서 유입되는 홍수량을 그대로 방류하여 하류 지역에 농경지 침수 등 홍수피해가 발생할 위험성이 높다. 본 연구에서는 경상북도 상주시에 위치한 지평저수지를 대상으로 수문분석을 실시하여 설계홍수량(200년 빈도의 1.2배)을 산정하고, 저수지 추적기법을 통해 기존 여수로와 사이펀 여수로 설치에 따른 저수지 홍수조절능력을 비교 분석하여 사이펀 여수로의 홍수조절 효과를 분석하였다. 그 결과, 지평저수지의 설계홍수량은 $284.3m^3/s$, 로 산정되었으며, 사이펀 여수로의 사전방류를 통해 수위가 약 40cm 정도 하강하고 방류량은 $91m^3/s$, 정도 감소하는 것으로 분석되었다.
'This hydraulic experiment have been practised Juk an Reservoir spillway and discharge 'channel which the province Kyong Buk was constructed and designed U. hook, for seizing all state of hydraulic. As result of the experimellt planning and making the model test, it has gained the necessary data at the amendment, projection of the most rational and economical result. 1. Project (1) Experiment project....1/30 of the discharge (2) project flood....0.01945 $m^3$/sec (rapidly) 2. Design Experiment It were sighted the water level for the nine point (L. & R. sides of No. O, L. & R. of No.1, L. side of NO.2, NO.3, No. 4 and NO.5), but it appeared each other that the lowest water level was 0.63 m at spillway (No.5) and the highest water level 0.735m less than planning water level O.75 m at No. 0. It was regarded as the phenomena appearing the difference from the calculation of the rational formular and coefficient of discharge. 3. Experiment examine E. ${\circled1}$ As a table (2) it had not a difference in comparision with design and was some lower value than design experiment's. E ..${\circled2}$) !twas same table (3) in a consequence of Experiment contracted Rocky cutting. E.${\circled3}$. ${\circled4}$ It was done amend.ment Experiment by elevating G.H. in only control point, but was not sure result as a table (2)(3)(4), and so it was changed largely in ${\circled5}$ Experiment. E. ${\circled5}$ Increasing water level was understanded to be proportion to $V^2$ in consideration of centrifugal force in the curve part and showed velocity contracting in curve the effect order's being regular in consequence of 1/6 sloped extending G.H. attached from 5 No. 0 to 1. 50 m, to S No. 0+5m. (S; discharge channel number).
This study aims at suggesting an alternative to improve flood controling capacity according to the cument design criteria for the existing Soyanggang Multi-purpose Dam which was constructed 20 years ago as the largest dam in Korea. The peak inflow of the adopted probable maximum flood (PMF) at the time of construction was 13,500 $m^3$/s. However, the newly estimated peak inflow of the PMF is 18,000 $m^3$/s which is 1.34 times bigger than the original one. This is considered to be due to the accumulation of the reliable flood and storm event records after construction, and due to the increasing tendency of the local flood peaks according to the influence of world-wide weather change. The new estimation of the probable maximum precipitation (PMP) was based on the hydro-meteorological method suggested by the guideline of the World Meteorological Organization (WMO). The unit hydrograph which was applied for the estimation of PMF was derived through linear programming algorithm by minimizing the sum of absolute deviations of the calculated and recorded flood hydrographs. In order to adopt the newly estimated PMF as a design flood, following four alternatives were compared : (1) allocation of more flood control space by lowering the normal high water level, (2) construction of a new spillway in addition to the existing spillway, (3) construction of a new dam which has relevant flood control storage at the upstream of the Soyanggang dam, (4) raising the existing dam crest. The preliminary evaluation of these alternatives resulted in that the second alternative is most economic and feasible. So as to stably cope with the newly estimated PMF by meeting all the current functions of the multipurpose dam, a detailed study of an additional spillway tunnel has to be followed.
Labyrinth weir is a hydraulic structure that can maintain constant water depth and increase overflow rate by increasing overflow width of weir through complicated displacement of its cross section. The labyrinth weir can be widely applied to various hydraulic facilities such as dam spillway, irrigation facilities, and canal structures. To date, however, few labyrinth weirs were applied to hydraulic facilities in Korea. Hence, in-depth research on labyrinth weir is highly required to efficiently apply the labyrinth weir to hydraulic facilities. This study was performed to analyze the hydraulic characteristics according to triangle labyrinth weir using hydraulic model experiments. The hydraulic characteristics provided in this study, which make it feasible to increase the overflow rate, and are expected to be widely applied to design of hydraulic facilities such as dam spillway and irrigation system.
두가지 어류이동용 여수로 설계안에 대하여 레블�V 유한요소법을 이용하여 자유수면을 포함한 흐름을 모의하였다. 댐 상류부에서 여수로 입구 방향으로 직각형 유입부를 갖는 여수로와 곡선형 유입부의 여수로에 대하여 흐름의 형상을 모의, 비교하였으며, 또한, 수치해석 결과를 여수로 바닥면의 압력분포와 자유 수면형상에 대하여 수리실험 결과를 통하여 검증하였다. 직각형 여수로가 여수로 유입부에서 자유수면 형상과 압력분포에서 다소 큰 내부 변형율을 보이는 반면, 곡선형 유입부 여수로에서는 작은 변형율을 관찰 할 수 있었다. 여수로 정상부의 대기압보다 작은 부압의 존재 형태는 두가지 형상 모두 유사함을 알 수 있었지만, 전반적으로는 곡선형 유입부 여수로가 어류 이동에 유체역학적으로 더 우호적인 환경을 제공함을 알 수 있었다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.