Geological achievements of the 20th century revolutionized our views about geological understanding and concept. A good example is the concept of continental drift suggested early in the 20th century and later explained in terms of seafloor spreading and plate tectonics. Our understanding of the compositions of materials forming earth has also improved during the20th century. Radio and stable isotopes together with biostratigraphy and sequence stratigraphy allow us to interpret the evolution of sedimentary basins in terms of plate movement and sedimentation processes. The Deep Sea Drilling Project initiated in 1960s and continued as the Ocean Drilling Project in 1980s is one of the most successful international research observations, and new developments in computational techniques have provided a wholly new view about the interior of the earth. Most of the geological features and phenomena observed in deep sea and around continental margins are now explained in terms of global tectonic processes such as superplumes flowing up from the interior of our planet and interacting with such as Rodinia Pannotia and Nena back in the Precambrian time. The space explorations which began in the late 1950s opened up a new path to astrogeology, astrobiology, and astropaleontology. The impact theory rooted in the discovery of iridium and associated phenomena in 1980s revived Cuvier's catastrophism as a possible explanation for the extinctions of biotas found in the geological record of this planet. Due to the geological achievements made in the 20th century, we now have a better understanding of geologic times and processes that were too long to be grasped by human records.
After the introduction of geothermal power generation technology based on engineering reservoir creation that can be applied on non-volcanic region, industrial need for studies on the efficient and economic execution of costly deep-depth drilling work becomes manifest increasingly. However, since it is very difficult to predict duration and cost of boring work with acceptable reliability because of many uncertain events during the execution, efficient and organized work management for drilling is not easily achievable. Especially, the round trip that discretely occurs because of the abrasion of bit takes more time as the depth goes deeper and it has a great impact on the work performance. Therefore, a technology that can simulate the occurrence timing and depth of round trip in advance and therefore optimize them is essentially required. This study divided the abrasion state of bit into eight steps for simulation cases and developed a forecast algorithm, i.e., TOSA which can analyze the depth and timing of round trip occurrence. A methodology that can divide a unit section for simulation has been suggested; while the Bourgoyne and Young model has been used for the forecast of drilling rates and bit abrasion extent by section. Lastly, the designed algorithm has been systemized for the convenience of the user.
In step-by-step site selection for geological disposal of high-level radioactive waste, parameters necessary for site selection will be acquired through deep drilling surveys from the basic survey stage. Unlike site investigations of rock mass structures such as tunnels and underground oil storage facilities, those related to the geological disposal of high-level radioactive waste are not only conducted in relatively deep depths, but also require a high level of quality control. In this report, based on the 750 m depth drilling experience conducted to acquire the parameters necessary for deep geological disposal, the methodology for deep drilling and the geology, geophysics, geochemistry, hydrogeology and rock mechanics obtained before, during, and after deep drilling are discussed. The procedures for multidisciplinary geoscientific investigations were briefly described. Regarding in-situ stress, one of the key evaluation parameter in the field of rock engineering, foreign and domestic cases related to the geological disposal of high-level radioactive waste were presented, and variations with depth were presented, and matters to be considered or agonized in acquiring evaluation parameters were mentioned.
In order to save labor and cost, direct seeding has been considered as an important alternative to the machine transplanting in rice cultivation. As current seeders for direct seeding of rice seeds drill irregular amount of seeds under various operating conditions, conventional drilling should be turned to precision planting which enables accurate placement of proper amount of rice seeds at equal intervals within rows. In this study, design, construction and performance evaluation of a precision seed metering device for planting of rice seeds were carried out. As prototype, the conventional roller type seed metering device was modified for planting: increasing diameter of metering roller, setting 2 or 4 seed cells on metering roller, adding seed discharging lid and its driving cam mechanism. Through performance tests for prototype and the current seed metering device, number of seeds in a hill, planting space and its error ratio, coefficient of variation of planting space (planting accuracy), and seeding length of $90\%$ of seeds in a hill divided by planting space (planting precision) at setting planting spaces of 15, and 20cm, seeding heights of 10, and 20cm, and seeding speeds of 0.1, 0.2, and 0.5m/s were investigated. Prototype showed better seed planting performance than the current seed metering devices. When setting planting space of 15 cm and seeding height of 10cm, prototype with 2 seed cells showed that variations of planting space and seeding lengths of $90\%$ of seeds in a hill at up to seeding speed of 0.5m/s were within 0.9cm, and 3.6cm, respectively.
KIGAM (Korea Institute of Geoscience and Mineral Resources) launched a new project to develop the low-temperature geothermal water in the area showing high geothermal anomaly, north of Pohang city, for large-scale space heating. Surface geologic and geophysical surveys including Landsat 1M image analysis, gravity, magnetic, Magnetotelluric (MT) and controlled-source audio-frequency MT (CSAMT), and self-potential (SP) methods have been conducted and the possible fracture zone was found that would serve as deeply connected geothermal water conduit. In 2004, two test wells of 1.1km and 1.5km depths have been drilled and various kinds of borehole survey including geophysical logging, pumping test, SP monitoring, core logging and sample analysis have followed. Temperature of geothermal water at the bottom of 1.5km borehole reached over $70^{\circ}C$ and the pumping test showed that the reservoir contained huge amount of geothermal water. Drilling for the production well of 2 km depth is on going. After test utilization and the feasibility study, geothermal water developed from the production well is going to be provided to nearby apartments.
Journal of Korean Tunnelling and Underground Space Association
/
v.4
no.3
/
pp.207-216
/
2002
Conventional Korean tunnel portals require a lot of overburden. For stability reasons, about 1.5 to 2.0 times the tunnel diameter is needed for the height in order to achieve a sufficient arching effect. Thus, considerable movement of earth and support constructions are required which lead to undesirably large changes of and damage to the environment. With a massively designed pipe roof, tunnels at low overburden can be built. To effectively construct pipe roof as an advanced safeguarding method, the following properties are indispensable: stability, insensitivity to settling and drilling accuracy. A new pipe roof method, AT-casing system, has been developed which on the one hand entirely combines the properties mentioned above, and which on the other hand permits the construction of safe, economical and environmentally friendly tunnels at low overburden heights of 3 to 5m.
Proceedings of the Korean Geotechical Society Conference
/
2009.03a
/
pp.195-198
/
2009
Rammed Aggregate Pier method is intermediate foundation of deep and shallow foundation, it has been built on world wide. But the investigation and research in domestic is not accomplished. In this paper, examined details of different spacing of piles, bearing capacities, respectively, conclude with recommendations on how RAP can be used in future needs. This documentation further provides comparisons of the laboratory test results which were obtained from differenciate the spacing of piles, namely installed rammed aggregate pier. Strain control test was conducted to determine the bearing capacities of the piers; 20mm, 30mm and 40mm diameter drilling equipment to drill holes were installed in sand at initial relative densities of 40%. By comparing different spacing of piles, in this experiment, piles are spaced structually span, form a ring shape, narrowing the distance of each other, to the center. the result shows that as diameter of pier is bigger in diameter, bearing capacity also dramatically increased due to raised stiffness. Also, the space between each piers narrowed, settlement rate of soil was decreased significantly. From the test results, as the space between each piles were getting closer, allows greater chances to have resistance to deformation, shows improved stability of structures.
Journal of the Korean Society for Aeronautical & Space Sciences
/
v.31
no.1
/
pp.18-24
/
2003
A three node triangular element with drilling rotations incorporating improved higher-order zig-zag theory(HZZT) is developed to analyze the vibration of pretwisted composite plates with embedded damping layer. Shear force matching conditions are enforced along the interfaces between the embedded damping patch and the border patch by matching the shear forces of the embedded damping patch to the shear forces of the adjacent border patch. The natural frequencies and modal loss factors are calculated for cantilevered pretwisted composite blade with damping core with the present triangular element, and compared to experiments and MSC/NASTRAN using a layered combination of plate and solid elements.
Objectives : Anterior tunnelling technique consist of anterior cervical fractional interspace decompression without fusion. This method provides sufficient space for adequate neuroforaminal decompression but avoids the need for fusion or fixation. We report early clinical results of 32 cases that underwent anterior tunnelling operation for treatment of cervical radiculopathy. Methods : This method is identical to conventional approach until the exposure of anterior cervical body and bilateral retraction of longus colli is made. A vertical window is then made at the vertebral bodies and disc space lateral to the insertion site of the longus colli. The window is deepened with drilling that follows a tunnelling fashion down to the compressive lesion. We analyzed clinical results from 32 patients who treated between December 1998 and August 2000. Results : Satisfactory results were obtained in 87% of the patients. Two patients required revision surgery. None revealed surgical spinal instability on last follow-up. Conclusion : Anterior tunnelling operation is an acceptable surgical option for the treatment of cervical radiculopathy. Its advantages are short hospitalization, minimal postoperative discomfort, and technical feasibility.
An algebraic algorithm for predicting the joint trace distribution on the cut-face of rock slope based on the orientations and the locations of joints investigated in the borehole has been developed. Joint trace prediction is manipulated by utilizing the three dimensional plane equations of both joint planes and projection face, and the extent of trace within the projection area is calculated by considering the persistence of each joint plane. Joint trace prediction method is efficiently applied for analyzing the stability and the adequacy of support design of Gimhae Naesam cut-slope, which is structurally unstable due to slumping. Structural characteristics of rock mass is investigated by performing DOM drilling and the potential rock mass sliding inside slope face is analyzed by examining the orientations of joint planes which can induce the slope failure. Also, the efficiency of anchor support design is evaluated by considering the joint trace distribution on the anchor installation area and its sliding potential.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.