• Title/Summary/Keyword: small water system

Search Result 1,321, Processing Time 0.028 seconds

Institutional Setting for Integrated Small Watershed (소유역의 협의체 구성을 통한 유역통합관리방안)

  • Park, Doo Ho;Yoon, Seok Young
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2004.05b
    • /
    • pp.339-344
    • /
    • 2004
  • The most important factor in IWRM is considering different characteristics of water within a system. These sectoral and regional different should be analyzed before the implementation of IWRM. This includes hydrological, hydraulic and meteorological characteristics of water. This research suggests that the way of implementation of IWRM by integrated watershed management, also try to find the financial plan of the institution.

  • PDF

Predicting the likelihood of impaired stream segments using Geographic Information System on Abandoned Mine Land in Gangwon Province

  • Lee, Ju-Young;Yang, Jung-Suk;Choi, Jae-Young
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2007.05a
    • /
    • pp.1081-1083
    • /
    • 2007
  • The study in river basin has been performed for the identify water quality impaired stream segments, to create a priority ranking of those segments, and to calculate the heavy metal ion distribution for each impaired segment based on chemical and physical water quality standards. Two methods for modeling the potential area-specific heavy metal distribution are pursued in this study. First, a novel approach focuses on distance. Heavy metal distribution can be associated with a particular small geographic area. Based on the derived estimates an distribution map can be generated. Second, the approach is used the near watershed by means of kriging interpolation algorithm. These approaches provide an alternative distribution mapping of the area. The exposure estimates from both of these modeling methods are then compared with other environmental monitoring data. A GIS-based model will be used to mimic the hierarchical stream structure and processes found in natural watershed. Specifically, the relationship between landscape variables and reach scale habitat conditions most influential found in the Abandoned mine will be explored.

  • PDF

Automatic crack detection of dam concrete structures based on deep learning

  • Zongjie Lv;Jinzhang Tian;Yantao Zhu;Yangtao Li
    • Computers and Concrete
    • /
    • v.32 no.6
    • /
    • pp.615-623
    • /
    • 2023
  • Crack detection is an essential method to ensure the safety of dam concrete structures. Low-quality crack images of dam concrete structures limit the application of neural network methods in crack detection. This research proposes a modified attentional mechanism model to reduce the disturbance caused by uneven light, shadow, and water spots in crack images. Also, the focal loss function solves the small ratio of crack information. The dataset collects from the network, laboratory and actual inspection dataset of dam concrete structures. This research proposes a novel method for crack detection of dam concrete structures based on the U-Net neural network, namely AF-UNet. A mutual comparison of OTSU, Canny, region growing, DeepLab V3+, SegFormer, U-Net, and AF-UNet (proposed) verified the detection accuracy. A binocular camera detects cracks in the experimental scene. The smallest measurement width of the system is 0.27 mm. The potential goal is to achieve real-time detection and localization of cracks in dam concrete structures.

A Study on Safety Distance for Small Scale LNG Storage facility (소규모 LNG 저장시설의 안전거리 기준 연구)

  • Oh, Shin-Kyu;Jo, Young-Do
    • Journal of the Korea Safety Management & Science
    • /
    • v.16 no.4
    • /
    • pp.185-191
    • /
    • 2014
  • In this study safety distance was investigated for small-scale LNG storage facilities in order to provide basic data for safety. The results are as follows; (1) For explosion pressure criteria, current criteria are reasonable, but water spray system should be recommended to LNG storage tank to ensure safety. (2) For criteria based on the results of the quantitative risk assessment, criteria applied to people are $5kW/m^2$ for radiation, LFL for dispersion, and 7kPa for explosion pressure. And criteria applied to facility are $37.5kW/m^2$ for radiation and 20 kPa for explosion pressure.

Development of Prediction Model of Groundwater Pollution based on Food Available Water and Validation in Small Watersheds (식품용수 수질자료를 이용한 지하수 오염 예측 모델 개발 및 소규모 유역에서의 검증)

  • Nam, Sungwoo;Park, Eungyu;Yi, Myeong-jae;Jeon, Seonkeum;Jung, Hyemin;Kim, Jeongwoo
    • Journal of Soil and Groundwater Environment
    • /
    • v.26 no.6
    • /
    • pp.165-175
    • /
    • 2021
  • Groundwater is used in many areas in food industry such as food manufacturing, food processing, cooking, and liquor industry etc. in Korea. As groundwater occupies a large portion of food industry, it is necessary to predict deterioration of water quality to ensure the safety of food water since using undrinkable groundwater has a ripple effect that can cause great harm or anxiety to food users. In this study, spatiotemporal data aggregation method was used in order to obtain spatially representative data, which enable prediction of groundwater quality change in a small watershed. In addition, a highly reliable predictive model was developed to estimate long-term changes in groundwater quality by applying a non-parametric segmented regression technique. Two pilot watersheds were selected where a large number of companies use groundwater for food water, and the appropriateness of the model was assessed by comparing the model-produced values with those obtained by actual measurements. The result of this study can contribute to establishing a customized food water management system utilizing big data that respond quickly, accurately, and preemptively to changes in groundwater quality and pollution. It is also expected to contribute to the improvement of food safety management.

Development of Small-scale Organic Rankine Cycle System and Study on its Operating Characteristics (소형 유기랭킨사이클 시스템 개발 및 작동특성에 관한 연구)

  • Yun, Eunkoo;Kim, Hyun Dong;Yoon, Sang Youl;Kim, Kyung Chun
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.37 no.10
    • /
    • pp.919-926
    • /
    • 2013
  • Experiments were conducted to determine the operating characteristics of a small-scale ORC (organic Rankine cycle) system for various low-temperature heat sources. A small-scale ORC power generation system adopting R-245fa as a working fluid was designed and manufactured. Hot water was used as the heat source, and the temperature was controlled using 110-kW electric resistance heaters that provided temperatures of up to $150^{\circ}C$. An open-drive oil-free scroll expander directly connected to a synchronous generator was installed in the ORC unit. Experiments were conducted by varying the rotational speed of the expander under the same heat source temperature conditions. The factors that influence the performance of the small-scale ORC system were analyzed and discussed.

Research on Groundwater Quality and Economic Expenses for Drinking in Daegu and Gyeongbuk Areas (대구.경북지역 마을상수도용 지하수의 수질과 주민의 경제비용에 대한 조사)

  • Kang, Mee-A;Jeong, Tae-Kyung
    • The Journal of Engineering Geology
    • /
    • v.19 no.3
    • /
    • pp.307-311
    • /
    • 2009
  • Agricultural is recognised as being the leading contributor to groundwater. As a consequence, the consumer have to has bear the high expenses of water supplied to be treated. Importantly, the cost of water supplied is a function of the water quality as well as the scale of drinking water treatments. The relationship between the consumer payment and water quality improvement was affected by the scale of drinking water treatments directly. Hence when we achieve the high quality and low cost in the case of groundwater treatment for drinking, it is needed to consider both water quality and plant scale.

Numerical Analysis of Effects of Water Mist Injection Characteristics on Cooling Performance in Heated Chamber (미분무수 분사 특성에 따른 가열 챔버 내 냉각 성능 수치 해석)

  • Sumon, S.M.;Lee, S.W.
    • Journal of ILASS-Korea
    • /
    • v.17 no.2
    • /
    • pp.64-70
    • /
    • 2012
  • Water mist fire suppression systems which use relatively small droplets of water with high injection pressure are increasingly being used in wider applications because of its greater efficiency, low flooding damage and low toxicity. However, the performance of the system significantly relies on the water mist characteristics and it requires better understanding of fire suppression mechanism of water mist. In the present study, computational fluid dynamics simulations were carried out to investigate cooling performance of water mist in heated chamber. The gas phase was prepared with natural convection heat transfer model for incompressible ideal case and then the effects of water mist injection characteristics on cooling capabilities were investigated upon the basis of the pre-determined temperature field. For the simulation of water mist behavior, Lagrangian discrete phase model was employed by using a commercial code, FLUENT. Smaller droplet sizes, greater injection angles and higher flow rates provided relatively higher cooling performance.

The Research on Activation Plan for Seawater Desalination Plant Application in Korea (국내 해수담수화 플랜트 적용 활성화 방안 연구)

  • Sohn, Jinsik;Yang, Jeong-Seok;Park, Jinseo
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.23 no.2
    • /
    • pp.251-255
    • /
    • 2009
  • Foreign and domestic seawater desalination plant market investigation was performed to analyze the worldwide trend of seawater desalination plant market and to establish the activation plan for seawater desalination plant application. Water demand and seawater desalination related laws and regulations were investigated and analyzed for the activation plan. RO type and large scale plants are popular nowadays however there are only small plants in island region in Korea. There will be about $1 million\;m^3/day$ deficit in 2015 according to the water demand forecasting from Ministry of Environment and Ministry of Land, Transportation, and Maritime Affairs in Korea. Therefore, it is necessary to activate the domestic application of seawater desalination plant to secure stable water resources. To activate the domestic application of seawater desalination plant, first, we need to establish regulations, support system in the water service law for seawater desalination plant. Second, related Ministry should increase the support for the operation and management of seawater desalination plant and suggest the construction of seawater desalination plant for water resources security near seaside region.

A Study on the Unified Operation and Maintenance System of Irrigation Facilities in Korea - With Reference to the Survey Results on the Activities of Irrigation Fraternities in Chungnam Province - (농업용수리시설의 유지관리체제일원화에 관한 연구 - 충남지역 수리계 운영실태조사결과를 중심으로 -)

  • Kim, Sung-Min;Lim, Jae-Hwan
    • Korean Journal of Agricultural Science
    • /
    • v.31 no.1
    • /
    • pp.53-75
    • /
    • 2004
  • This study is aimed at identifying the national economic value of the irrigation facilities by reviewing the existing papers on economic values of the irrigation facilities and presenting current status of dual O & M problems of the irrigation facilities. This study suggested the unified O & M system rather than continuing the existing dual O & M system of irrigation facilities based on the surveyed results of the activities of irrigation fraternities in Chungnam Province. The findings and proposals for the successful unified and mono O & M system of the irrigation facilities are as follows: (1) Total number of irrigation facilities in the nation accounts for 67,582, while the total length of irrigation and drainage canals amounted to about 174,259km. On account of the total length of structural canals was estimated at 31%, much losses of water and much O & M costs have been inevitable for the full irrigation rice culture. In spite of the past heavy investment for irrigation facilities, the ratio of rain-fed and partially irrigated paddy fields accounts for 23% in 2003. Both Korea Agricultural and Rural Infrastructure Corporation (KARICO) and the city and Gun Governments have managed the irrigation facilities separately by irrigation fraternities. The KARICO have commanded 59% of irrigation paddy area with 18% of the total irrigation facilities, while the city and Gun governments covered 41% of irrigation paddy area with 82% of the existing number of irrigation facilities representing small and medium scale. (2) The 1999 demand prices of irrigation water per ton expressed in 2000 constant market price was estimated at 388 won, the supply price was amounted to 184 won per ton. Considering the supply and demand curve of the irrigation water, the existing irrigation facilities could not satisfy the demand of irrigation water. (3) In 1999, total present added value of the irrigation facilities during the economic life accounted for 48 trillion won, while total supply cost was 44.7 trillion won. The marginal benefit and cost ratio of irrigation water was 1.08. (4) The total O & M cost per year amounting to 681.1 billion won have been required to maintain and repair the existing irrigation facilities in Korea. For the successful unified O & M of irrigation facilities covering whole irrigated paddy field in Korea, 950 billion won of O & M costs are required to keep up the marginal benefit of irrigation water as 2,800 billion won per year. The total O & M cost as 950 billion won should be allocated 40%, 380 billion won for O & M costs of irrigation facilities and 60%, 570 billion won for improvement of irrigation facilities. (5) The study investigated and reviewed the present O & M status of the irrigation facilities by small and medium irrigation fraternities. Most of the farmers belong to the irrigation fraternities preferred not only unified O & M but also KARICO take-over of the whole O & M activities of the irrigation facilities. The prevailing O & M cost per 10a expended by the Corporation was amounted to 104,890 won, while that of city and Gun governments was only amounted to 4,600 won per 10a. regarding the small amount of O & M cost expended by city and Gun governments, it is evident that the existing irrigation system have been managed ineffectively and deteriorated the facilities comparing that of KARICO. In conclusion, the Government could not satisfied the demand of irrigation water by suppling water with existing irrigation facilities. Therefore new additional investment and financial support for irrigation water development should be made to convert rain-fed and partially irrigated paddy fields into fully irrigated ones. The operation and maintenance cost should be supported to keep the marginal values of rice production of existing irrigation facilities in the national economy and to modernize the obsolete irrigation facilities. By unifying the existing dual O & M systems, all the farmers belong to the irrigated paddy fields have to be equally benefited and could be increased their farm income and be stabilized their rural lives.

  • PDF