• 제목/요약/키워드: small hydropower plant

검색결과 33건 처리시간 0.019초

Strength degradation of a natural thin-bedded rock mass subjected to water immersion and its impact on tunnel stability

  • Zhang, Yuting;Ding, Xiuli;Huang, Shuling;Wu, Yongjin;He, Jun
    • Geomechanics and Engineering
    • /
    • 제21권1호
    • /
    • pp.63-71
    • /
    • 2020
  • Strength anisotropy is a typical feature of thin-bedded rock masses and their strength will be degraded subjected to water immersion effect. Such effect is crucial for the operation of hydropower plant because the impoundment lifts the water level of upstream reservoir and causes the rock mass of nearby slopes saturated. So far, researches regarding mechanical property of natural thin-bedded rock masses and their strength variation under water immersion based on field test method are rarely reported. This paper focuses on a thin-bedded stratified rock mass and carries out field test to investigate the mechanical property and strength variation characteristics. The field test is highlighted by samples which have a large shear dimension of 0.5 m*0.5 m, representing a more realistic in-situ situation than small size specimen. The test results confirm the anisotropic nature of the concerned rock mass, whose shear strength of host rocks is significantly larger than that of bedding planes. Further, the comparison of shear strength parameters of the thin-bedded rock mass under natural and saturated conditions show that for both host rocks and bedding planes, the decreasing extent of cohesion values are larger than friction values. The quantitative results are then adopted to analyze the influence of reservoir impoundment of a hydropower plant on the surrounding rock mass stability of diversion tunnels which are located in the nearby slope bank. It is evaluated that after reservoir impoundment, the strength degradation induced incremental deformations of surrounding rock mass of diversion tunnels are small and the stresses in lining structure are acceptable. It is therefore concluded that the influences of impoundment are small and the stability of diversion tunnels can be still achieved. The finings regarding field test method and its results, as well as the numerical evaluation conclusions are hoped to provide references for rock projects with similar concerns.

상관분석 및 의사결정나무분석을 통한 하수처리시설의 에너지 소비량과 운영인자의 관계 분석 (Relationship between Energy Consumption and Operational Variables at Wastewater Treatment Plant)

  • 정용준;김예진
    • 한국물환경학회지
    • /
    • 제32권3호
    • /
    • pp.253-260
    • /
    • 2016
  • To reduce energy consumption in wastewater treatment plants (WWTPs), renewable energy applications such as small hydropower, solar energy, and wind energy are popular. However, it should be noticed that energy originated from operation of wastewater treatment process can be reduced through optimized operation based on analysis of factors affecting energy. In this research, the relationship to the various operational variables and influent factors was explored using correlation analysis and decision tree algorithm. Due to the non-linear characteristics of the process, it was difficult to find clear linear patterns through correlation analysis. However, decision tree algorithm showed its usefulness in uncovering hidden patterns that consume energy. As operational factors, influent flowrate, the amount of aeration, nitrate recycling pumping rate, and sludge wasting pumping rate were selected as important factors. For environmental factors associated with influent compositions and removal rate, BOD and T-N removal rate were selected as significant factors.

모델분석을 통한 하수처리장 소수력발전 경제성 평가 (Feasibility Study of small hydropower at a municipal wastewater treatment plant by model analysis)

  • 김원경;김동수;강지훈;채규정;김정연;이철형;박완순
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2012년도 학술발표회
    • /
    • pp.216-220
    • /
    • 2012
  • 본 연구는 경기도 용인시에 위치한 공공하수처리장을 대상으로 소수력발전 성능특성을 예측하고 경제성을 분석하여 소수력발전소의 건설타당성을 제시하였다. 방류구에서의 수준측량 조사에 따르면 실제 유효 낙차는 4.3m로 나타났다. 최근 5년간 방류량 자료를 살펴보면 일평균 실제 처리량은 약 $30,000m^3/day$로 나타났으며, 우수 유입과 물 사용량이 증가하는 여름 및 가을에 처리량이 증가하였다. 설계유량은 유량변화에 따른 누적 확률밀도와 유량지속곡선에 근거해 산정하였으며, 시간빈도로 보았을 때 17%의 유량이 지속되는 $0.35m^3/sec$가 설계유량으로 나타났다. 예상되는 수차 발전용량은 11kW급이며, 시스템 가동율은 74%, 그리고 계통선에 송출될 수 있는 연 전력생산량은 71.3MWh로 나타났다. 경제성 평가는 신재생에너지 경제성 분석 도구인 RETScreen 프로그램을 사용하여 B/C ratio, IRR, 개발투자비 등의 경제성 평가지표들을 산정하였다. 편익(Benefit) 산정시 전력기준단가는 133.67원/kWh, 할인율 7%를 적용하였으며, 비용(Cost) 산정시 유지관리비는 초기 건설비의 1%, 사용연한 30년을 적용하였다. 경제성 분석결과 기흥레스피아의 소수력발전소 건설시 초기 건설공사비가 $165,000 일 때, B/C 1.0, NPV $3,534, 투자회수기간 15.1년으로 산정되었고 따라서 초기 건설비용이 $165,000 이하일 때 가장 경제적인 것으로 파악되었다.

  • PDF