• 제목/요약/키워드: small hydropower

검색결과 149건 처리시간 0.021초

소수력발전소의 출력특성 분석 (Output Characteristic Analysis of Small Hydropower Plant)

  • 박완순;이철형
    • 신재생에너지
    • /
    • 제2권2호
    • /
    • pp.81-85
    • /
    • 2006
  • The output performance characteristics for surveyed sites were analyzed, using developed model. It consists of two main parts, the deciding flow duration characteristic of river and performance prediction model to estimate the output characteristics of small hydropower plants. As a result, It was found that the flowrate concerning with 25% of time ratio on flow duration curve can be selected to design flowrate of small hydropower plants, and the output characteristics of small hydropower plants having overflow dam are different from large scale hydropower plants.

  • PDF

소수력발전소의 출력특성 분석 (Output Characteristic Analysis of Small Hydropower Plant)

  • 박완순;이철형
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2006년도 춘계학술대회
    • /
    • pp.491-494
    • /
    • 2006
  • The output performance characteristics for surveyed sites were analyzed, using developed model. It consists of two main parts, the deciding flow duration characteristic of river and performance prediction model to estimate the output characteristics of small hydropower plants. As a result, it was found that the flowrate concerning with 25% of time ratio on flow duration curve can be selected to design flowrate of small hydropower plants, and the output characteristics of small hydropower plants having overflow dam are different from large scale hydropower plants.

  • PDF

소수력용 수차의 종류 및 설치 예 (Classification and Installation Cases of Small Hydraulic Turbine)

  • 최영도;김유택;이영호
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2006년도 추계학술대회
    • /
    • pp.503-506
    • /
    • 2006
  • Recently, small hydropower attracts attention because of its clean renewable and abundant energy resources to develop. However, suitable turbine type is not normalized yet in the range of small hydropower and it is necessary to study for the effect ive turbine type. Moreover, relatively high manufacturing cost by the complex structure of the turbine is the highest barrier for developing the small hydropower turbine. Therefore, this study is trying not only, to classify the type of current operating turbines installed in the domestic power plants and turbines supplied in Japan by Japanese manufacturer but also, to examine the practical turbine type and installation site to extract the small hydropower energy effectively.

  • PDF

노즐형상변화에 따른 횡류수차의 압력과 속도 분포 (Pressure and Velocity Distributions of Cross-flow Hydroturbine by Nozzle Shape)

  • 임재익;최영도;임우섭;김유택;이영호
    • 대한기계학회:학술대회논문집
    • /
    • 대한기계학회 2007년도 춘계학술대회B
    • /
    • pp.2833-2838
    • /
    • 2007
  • Recently, small hydropower attracts attention because of its clean, renewable and abundant energy resources to develop. However, suitable turbine type is not determined yet in the range of small hydropower and it is necessary to study for the effective turbine type. Moreover, relatively high manufacturing cost by the complex structure of the turbine is the highest barrier for developing the small hydropower turbine. Therefore, a cross-flow turbine is adopted because of its simple structure and high possibility of applying to small hydropower. The purpose of this study is to examine the optimum configuration of nozzle shape to further optimize the cross-flow hydraulic turbine structure and to improve the performance. The results show that pressure on the runner blade in Stage 1 and velocity at nozzle outlet have close relation to the turbine performance.

  • PDF

Shape Effect of Inlet Nozzle and Draft Tube on the Performance and Internal Flow of Cross-Flow Hydro Turbine

  • Choi, Young-Do;Son, Sung-Woo
    • Journal of Advanced Marine Engineering and Technology
    • /
    • 제36권3호
    • /
    • pp.351-357
    • /
    • 2012
  • Small hydropower is a reliable energy technology to be considered for providing clean electricity generation. Producing electrical energy by small hydropower is the most efficient contribution to renewable energy. Cross-flow turbine is adopted primarily because of its simple structure and high possibility of applying to small hydropower. The purpose of this study is to investigate the effect of inlet nozzle shape on the performance and internal flow of a cross-flow turbine for small hydropower by CFD analysis. Moreover, the shape effect of draft tube has been investigated according to modified shapes of the length and the diffuse angle. The results show that relatively narrow and converging inlet nozzle shape gives better effect on the performance of the turbine.

현장시험에 의한 소수력발전용 튜블러수차시스템 성능계측 (Performance Measurement of a Tubular Type Turbine System for Small Hydropower by Field Test)

  • 황영호;이영호;최영도
    • 한국유체기계학회 논문집
    • /
    • 제14권6호
    • /
    • pp.5-10
    • /
    • 2011
  • Recently, small hydropower attracts attention because of its renewable, clean and abundant energy resources to develop. Therefore, a tubular type hydro turbine is proposed for small hydropower in this study because the turbine has relatively simple structure and high possibility of applying to small hydropower. The purpose of this study is to investigate the performance characteristics of the turbine by field test. Field test iss conducted using one tubular turbine system as well as serial arrangement system by two tubular turbines taking into consideration of actual operation conditions. The results show that efficiency of test turbine changes considerably by the runner vane angle. Best efficiency of one turbine arrangement is higher than that of two turbine serial arrangement.

소수력발전용 튜블러 수차의 내부유동특성 및 성능해석 (A study on internal flow characteristics and performance analysis of a micro hydro tubular turbine)

  • 이승엽;최영도;황영철;이영호
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2009년도 추계학술대회 논문집
    • /
    • pp.606-609
    • /
    • 2009
  • Development of renewable energy is very important because of environmental problems caused by greenhouse effect. This is due to the use of fossil fuels which has serious consequences. Therefore, development of small hydropower can be a good countermeasure for the problems. The small hydropower is clean energy because the small hydropower generates few $CO_2$. Moreover, as the energy density by the small hydropower is high, it is economical for a society which wants to introduce the system. The purpose of this study is to improve the turbine performance. This study is about tubular-type hydro turbine among renewable energy that is based using the different water pressure level in pipe lines. The analysis was performed using the commercial CFD code ANSYS-CFX.

  • PDF

소수력 발전설비 성능평가 시스템 구축 (Construction of small hydropower facilities performance evaluation system)

  • 김영준;김용열;조용;고재명
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2010년도 춘계학술대회 초록집
    • /
    • pp.193.2-193.2
    • /
    • 2010
  • Domestic hydroelectric power plants has been manufactured as the design condition by the demand. Hydraulic turbine power plants operating at appointed load shall be operate stable in terms of pressure, discharge, rotational speed and torque. A performance guarantees for hydro turbines shall be contain, as a minimum, guarantees covering power, discharge and specific hydraulic energy, efficiency, maximum momentary overspeed and maximum momentary pressure and maximum steady-state runaway speed, as well as guarantees related to cavitation. But, present in Korea, the absence of testing laboratories and technical criteria for the performance test of small hydropower degrades the efficiency of the domestic hydropower machines, and makes it difficult to objectively evaluate the performance of hydro turbine. Therefore We planned making a basis of performance test of small hydropower turbine by using our flowmeter calibration system the largest one in Korea. We planned the maximum measurable power of hydro turbine will be 200 kW in our system.

  • PDF

소수력 발전설비 성능평가 시스템 구축 (Construction of small hydropower facilities performance evaluation system)

  • 김영준;조용;고재명
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2011년도 춘계학술대회 초록집
    • /
    • pp.206.2-206.2
    • /
    • 2011
  • Domestic hydroelectric power plants has been manufactured as the design condition by the demand. Hydraulic turbine power plants operating at appointed load shall be operate stable in terms of pressure, discharge, rotational speed and torque. A performance guarantees for hydro turbines shall be contain, as a minimum, guarantees covering power, discharge and specific hydraulic energy, efficiency, maximum momentary overspeed and maximum momentary pressure and maximum steady-state runaway speed, as well as guarantees related to cavitation. But, present in Korea, the absence of testing laboratories and technical criteria for the performance test of small hydropower degrades the efficiency of the domestic hydropower machines, and makes it difficult to objectively evaluate the performance of hydro turbine. Therefore We planned making a basis of performance test of small hydropower turbine by using our flowmeter calibration system the largest one in Korea. We planned the maximum measurable power of hydro turbine will be 200 kW in our system.

  • PDF

농업용 보를 이용한 소수력발전소의 타당성 분석 (Feasibility Assessment of Small Hydro Power Plants Using Diversion Weirs for Agricultural Purpose)

  • 이철형;박완순
    • 한국태양에너지학회:학술대회논문집
    • /
    • 한국태양에너지학회 2011년도 춘계학술발표대회 논문집
    • /
    • pp.229-234
    • /
    • 2011
  • Feasibility assessment for small hydropower plants using diversion weirs located in stream for agricultural purpose has been studied. The model, which can predict flow duration characteristic of stream, was developed to analyze the inflow caused from rainfall. And another model to predict hydrologic performance for small hydropower plants is established. Preliminary survey was performed identifying several candidate sites, and two sites were selected finally for actual site reconnaissance. During the course of site survey, generating capacity, construction and equipment cost, and payback through life time of each sites were calculated for economical feasibility analysis. The results of this study have estimated that the small hydropower plants using diversion weirs for agricultural purpose may offer better opportunities in future with increasing fuel cost and nation's energy policy.

  • PDF