• Title/Summary/Keyword: slab structure

Search Result 593, Processing Time 0.025 seconds

A Study on How to Reduce Vibration in order to Decrease the Cracks that Form on the Upper Floor of a Structure due to Continuous Dynamic Loading (반복되는 동하중에 의한 구조물 상부바닥 균열 감소를 위한 진동저감 연구)

  • Chun, Chong-Keun;Park, Sam-Jin;Park, Sang-Gon;Kim, Do-Young
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.12 no.4
    • /
    • pp.1532-1538
    • /
    • 2011
  • In this study, we investigate the cracks that formed on the upper floor of the structures due to continuous dynamic loading. We explain the cause of floor slab cracks on the upper floor of the distribution center and discuss preventive measures that can enhance the center's functions and security. In order to explain how a forklift's excessive vibration can cause the cracks, we have measured and analyzed the vibration during a forklift's operation and discovered that the cracks form because the vibration exceeds the vibration criteria. Using a finite element modeling on such results, we have come up with optimal methods to reduce the vibration and confirmed their validity by measuring the vibration after implementing our methods.

Flexural Behavior of MRS Continuous Joints for the Prestressed Concrete One-way Joist Slab System (프리스트레스 콘크리트 일방향 장선구조로 구축한 MRS 연속단 접합부의 휨거동)

  • Oh, Young-Hun;Moon, Jeong-Ho;Im, Ju-Hyeuk;Choi, Dong-Sup;Lee, Kang-Chul
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.14 no.1
    • /
    • pp.148-155
    • /
    • 2010
  • The purpose of this study is to propose and evaluate the continuous joint constructed with MRS system which is utilized for floor system in the parking structures or commercial retail buildings. Four specimens were fabricated and tested to examine the structural performance of the continuous joint with different joint detailing. Structural test for the specimens was undertaken to simulate the actual stress condition of the negative moment resisting connection in the prestressed precast concrete parking structures with 8m span. Based on the experimental results, the MRS system could be designed as the ductile continuous joint governed by flexural behavior. Therefore the MRS system developed in this study would provide a superior joint behavior to conventional double-tee system when constructing monolithic joint composed of simply supported precast members.

Progressive Collapse of Steel High-Rise Buildings Exposed to Fire: Current State of Research

  • Jiang, Jian;Li, Guo-Qiang
    • International Journal of High-Rise Buildings
    • /
    • v.7 no.4
    • /
    • pp.375-387
    • /
    • 2018
  • This paper presents a review on progressive collapse mechanism of steel framed buildings exposed to fire. The influence of load ratios, strength of structural members (beam, column, slab, connection), fire scenarios, bracing systems, fire protections on the collapse mode and collapse time of structures is comprehensively reviewed. It is found that the key influencing factors include load ratio, fire scenario, bracing layout and fire protection. The application of strong beams, high load ratios, multi-compartment fires will lead to global downward collapse which is undesirable. The catenary action in beams and tensile membrane action in slabs contribute to the enhancement of structural collapse resistance, leading to a ductile collapse mechanism. It is recommended to increase the reinforcement ratio in the sagging and hogging region of slabs to not only enhance the tensile membrane action in the slab, but to prevent the failure of beam-to-column connections. It is also found that a frame may collapse in the cooling phase of compartment fires or under travelling fires. This is because that the steel members may experience maximum temperatures and maximum displacements under these two fire scenarios. An edge bay fire is more prone to induce the collapse of structures than a central bay fire. The progressive collapse of buildings can be effectively prevented by using bracing systems and fire protections. A combination of horizontal and vertical bracing systems as well as increasing the strength and stiffness of bracing members is recommended to enhance the collapse resistance. A protected frame dose not collapse immediately after the local failure but experiences a relatively long withstanding period of at least 60 mins. It is suggested to use three-dimensional models for accurate predictions of whether, when and how a structure collapses under various fire scenarios.

Integrated Experimental-Numerical Approach to Investigate the Heat Transferring Effect of Carbon Nanotube on the Concrete Slab (실내실험 및 수치해석을 통한 Carbon Nanotube의 콘크리트슬래브 열전달 효과 검증)

  • Kim, Hee Su;Ban, Hoki
    • Journal of the Korean GEO-environmental Society
    • /
    • v.20 no.1
    • /
    • pp.51-56
    • /
    • 2019
  • This paper presents a method to deice concrete pavement with carbon nanotube(CNT) as an heating material so as to avoid the adverse effects of conventional deicing method such as salt on the structure, function and environment. To this end, laboratory tests integrated with numerical simulations were conducted. In the laboratory tests, the CNT was embedded inside the concrete slab and generated the heat up to the target temperature of $60^{\circ}C$ in the freezer at temperature of $-10^{\circ}C$. Then, the surface temperature was measured to investigate how far the heat transfers on the surface at temperature of above $0^{\circ}C$. Also, three different spacings of 15, 20 and 30cm between CNTs were conducted to determine the maximum allowable spacing of CNT. Along with these experimental tests, heat transferring analysis conducted to validate the test results.

An experimental construction of railway steel plate girder strengthen adding ballast system by transport equipment (선로 이송 가설공법을 적용한 철도판형교 유도상화)

  • Min, Ji-Hong;Seo, Jong-Won;Jang, Hyeong-Sik;Park, Joon-Won
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.707-716
    • /
    • 2011
  • It has been applied using cranes or insertion methods to install heavy structures to strengthen existing railway bridges. These methods are uneconomical because of two reasons. The first one is it is required to construct approach roads for heavy equipment and/or working yard. The second one is the electric lines shall be cutoff during construction. Both require additional construction cost and duration. In this study, new transport equipment was developed which can be applied to heavy structures up to 100 ton. Using this method, the heavy structure can be loaded into the new transport equipment at working yard and transported to the working site. This method can be applied, but not limited to railway bridge or roadbed rehabilitation. It was found that the precious construction can be achieved to install heavy structure using this method. The experimental construction to make non-ballast girder bridge composite with new pc deck slab using this method was carried out for Jewon bridge. The example bridge is in extreme condition because it locates above national road #38 within extreme transition curve and has 10 ‰ slope and skew. The experimental construction results were satisfactory both for safety and construction precision.

  • PDF

Initial Investment Cost Analysis of Facilities of B2S Track System (B2S궤도시스템의 초기 시설 투입비용 분석)

  • Kim, Hyo-San;Min, Jun-Ho;Ryu, Jae-Kwang;Lee, Dal-Jae
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.733-739
    • /
    • 2011
  • B2S(Ballasted track To Slab track) that is track system has been first developed in 2004 with foundation of rich experience and know-how of subway track upkeep and mending of facilities in 36 years to improve an existence pebble track at a concrete track. 'B2S' is admitted technology through patent registration in the domestic and Europe and it's made by a factory and put together at field, so it's able to construct precisely and to reduce a construction period. In addition, safety, the ecological balance and durability are excellent, and walking, cleaning, etc. has the advantage of easy maintenance. 'B2S' is currently laying 27.7km at Seoulmetro as of end of 2010 standard, but it'll be expected to be applied to a domestic Metro more from now on. It is possible to classify the total cost resolution structure of B2S system by R&D cost, test production and experiment cost, the initial facility cost, maintenance cost, disposal cost. In this research, it seems useful for selection evaluation which considered the life cycle cost or economics of the concrete track structure by analyzing an initial cost of facilities.

  • PDF

Comparison of "The Cabinet of Dr. Caligari" and Deconstructive Architecture in the Expressionist Characteristics (칼리가리 박사의 밀실과 해체주의 건축의 표현주의 특성 비교)

  • Choi, Hyo-Sik
    • Korean Institute of Interior Design Journal
    • /
    • v.25 no.1
    • /
    • pp.35-46
    • /
    • 2016
  • The purpose of this study was to identify the characteristics of expressionism in the space of deconstructive architecture by comparing the spaces of "The Cabinet of Dr. Caligari" video with the expressionist characteristics of film narrative structure and expressionist architecture and making an expansion based on the results. The findings were as follows: first, the "The Cabinet of Dr. Caligari" is divided into two set spaces: one has the perspective representation distorted in the viewpoint of a mad person applied to it, and the other reflects the viewpoint of a normal person from medieval paintings with no perspective. Second, the expressionist buildings did not reflect the expressionist characteristics in the interior spaces as fully as in the exterior ones. Third, the incomplete combination of Signifiant and $Signifi{\acute{e}}$, which were the theoretical basis of deconstructive architecture, showed a tendency of binary opposition like the double narrative structure of "The Cabinet of Dr. Caligari." Fourth, deconstructive architecture seems to embody the exterior form and interior space of "The Cabinet of Dr. Caligari" and its set spaces in the phenomenal aspect but exhibits its limitations with the realization of dynamics, one of the characteristics of expressionism. Finally, the Seattle Public Library presents the best embodiment of expressionist characteristics found in the set spaces of "The Cabinet of Dr. Caligari" while seeking after the combination of horizontal and vertical paths of action through the spiral ramps and inclined slabs.

A Comparative Study on the Characteristics of Art Museums by Louis Kahn - Focused on the presence and the tectonic of architecture - (루이스 칸 미술관 건축의 특성 비교에 관한 연구 - 건축의 존재와 구축방식을 중심으로 -)

  • Kim, Nak-Jung;Chung, Tae-Yong
    • Korean Institute of Interior Design Journal
    • /
    • v.16 no.2 s.61
    • /
    • pp.155-162
    • /
    • 2007
  • The purpose of this comparative study is to analyze the characteristics of art museums of Louis I. Kahn. Kahn's main architectural thoughts of 'what it wants to be' and 'how it was done' act as a basis for this research. 'What it wants to be' means the existence of architecture and relates to the concept of 'room'. 'How it was done' shows the tectonic aspects of architecture and construction process to enhance its presence. Detailed items from these two thoughts applied to clarify the order in dynamics, the visualization of construction process, and the relationship between structure and light in the space of Kahn's art museums. Yale university art gallery was the first major project of Kahn and he showed tectonic characters through tetrahedral concrete slab. The unity of structure, space and light can be found in the Kimbell art museum through the vaulted structural unit. Yale center for British art is the best example of the concept of 'room' and 'tectonic' because it clearly shows the unity of spatial and structural system, and their relation to light. As a result, this study tries to find out that Kahn had consistently developed his thoughts of'room' and 'tectonic', and tried to keep them in his art museum designs.

Analysis and Evaluation of Impact Sound Insulation of Concrete Floor Structures in Response to Characteristics of Heavy-weight Impact Sources (중량충격원에 따른 콘크리트 바닥판의 차음특성 분석 및 평가에 관한 연구)

  • Yoo, Seung-Yup;Yeon, Jun-Oh;Jeon, Jin-Yong
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.19 no.10
    • /
    • pp.1062-1068
    • /
    • 2009
  • In this study, the impact force levels of bang machine and impact ball were measured, then the heavy-weight impact sounds generated by the bang machine and impact ball were investigated. It was found that the heavy-weight impact sources generated through modal excitation, and the impact force of the impact ball was similar to that of real impact source. The heavy-weight impact sounds were also measured in the real apartments with different slab thickness and floor structures. The results showed that the floor impact sound levels in terms of $L_{iFmax,AW}$, generated by impact ball sounds were reduced by using the resilient isolators. The frequency characteristics of heavy-weight impact sounds at 125 and 250 Hz were consistent with the characteristics of impact force spectrum. However, the difference between the impact sounds and the impact forces were found at 63 and 500 Hz due to the resonance of the floor structure and flanking noise, respectively.

Temperature Crack Contol in Subway Box Structures (지하철 박스 구조물에서의 온도균열제어)

  • Koo, Bon-Chang;Kim, Dong-Seuk;Ha, Jae-Dam;Kim, Ki-Soo;Choi, Long;Oh, Byung-Hwan
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1999.04a
    • /
    • pp.293-298
    • /
    • 1999
  • The crack of concrete induced by the heat of hydration is a serious problem, particularly in concrete structures such as underground box structure, mat-slab of nuclear reactor buildings, dams or large footings, foundations of high rise buildings, etc.. As a result of the temperature rise and restriction condition of foundation, the thermal stress which may induce the cracks can occur. Therefore the various techniques of the thermal stress control in massive concrete have been widely used. One of them is prediction of the thermal stress, besides low-heat cement which mitigates the temperature rise, pre-cooling which lowers the initial temperature of fresh concrete with ice flake, pipe cooling which cools the temperature of concrete with flowing water, design change which considers steel bar reinforcement, operation control and so on. The objective of this paper is largely two folded. Firstly we introduce the cracks control technique by employing low-heat cement mix and thermal stress analysis. Secondly it show the application condition of the cracks control technique like the subway structure in Seoul.

  • PDF