• 제목/요약/키워드: site assessment

검색결과 1,769건 처리시간 0.028초

전압 모니터링에 기반한 순간전압강하 확률적 추계 방법 (Stochastic Estimation of Voltage Sags Based on Voltage Monitoring)

  • 손정대;박창현
    • 전기학회논문지
    • /
    • 제67권10호
    • /
    • pp.1271-1277
    • /
    • 2018
  • This paper deals with a voltage sag assessment based on a voltage monitoring program. The voltage sag performance at a specific site can be evaluated by analyzing voltage monitoring data recorded for a long time period. Although an assessment based on voltage monitoring is an effective way to understand voltage sag performance at a measurement site, the statistical confidence of voltage sag frequency estimation heavily depends on the length of monitoring period and the number of recorded events. Short monitoring period and insufficient recorded data can not provide a reliable assessment result. This paper proposes a compensation assessment method by combining a computer simulation approach for in case that monitoring period and data are not enough for a valid assessment.

소규모 바다목장의 해양 환경 분석 및 평가 - 군산주변해역 (Analysis and Assessment of Environmental Factors in the Small Scale Marine Ranch around the Gunsan Coastal Areas)

  • 김종화
    • 수산해양교육연구
    • /
    • 제20권3호
    • /
    • pp.487-499
    • /
    • 2008
  • This study was analyzed and assessed the environmental factors on small marine ranching sites around Gunsan Coast, West Sea of Korea. Standards of assessment are followed in the reports on the choice of marine ranching sites and regulation factors of proper site on marine artificial reefs of MOMAF. Max. current speed around Gunsan were ranged between 25.52 ~ 57.49cm/sec. These values were satisfied by comparing assessment factor such as current speed.. Factors of temperature, salinity, transparency and pH were evaluated as the proper extent. DO was not distributed as the proper extent due to different criterion. between the same assessment factor. COD, SS and nutrients were partly suited to the criteria. Especially, SS was almost higher than that of criterion. So, we are proposed to be reflected in environment characteristics of West Coast such as SS. Moreover, the extent of pollution load factors have to be specified clearly in the regulations of assessment criteria.

화학공정 위험영향 평가기술에서의 다중요소분석기법을 이용한 사고시나리오 산정에 관한 전략 (A Strategy for the Generation of Accident Scenarios Using Multi-Component Analysis in Quantitative Risk Assessment)

  • 김구회;이동언;김용하;안성준;윤인섭
    • 한국화재소방학회논문지
    • /
    • 제15권4호
    • /
    • pp.24-33
    • /
    • 2001
  • 현재 전세계적으로 공장내(on-site)뿐만 아니라 공장외지역(off-site)에 대한 사고영향평가의 필요성이 대두되고 있으며, 공장외지역에 대한 영향평가 수행후 이에 대한 적절한 비상계획을 제출하도록 하고 있고, 국내에서도 종합적위험관리체계(IRMS : Integrated Risk Management System)를 PSM이나 SMS와 더불어 시행 준비중에 있다. 그러나 공장외지역에 대한 위험영향 평가시 가장 먼저 결정되어야 할 가상시나리오에 대한 기준이 체계적으로 마련되어 있지 않아 사용자나 분석자에 따라 평가결과가 다양하게 나오며, 또한 공정에서 발생할 수 있는 사고의 이상원을 정확하게 파악하지 못한다는 단점이 있다. 따라서 본 연구에서는 이러한 가상시나리오를 결정하는데 필요한 공정요소를 분석한 후, 분석결과에 따라 발생 가능하고, 먼저 고려되어야 할 시나리오를 산정할 수 있도록 전략을 제시하고자 한다. 분석된 공정요소들은 요소에 따른 가중치를 부여하여 위험등급을 결정한 후 등급에 따른 위험영향 평가를 수행하도록 한다. 분석의 결과는 가상시나리오의 신뢰성을 향상시킴으로써 위험영향평가가 과대평가되는 것을 방지하고, 공정의 설계나 비상계획의 수립시 효과적이고 적절한 대책마련을 유도할 수 있다.

  • PDF

환경영향평가 대상사업별 중점평가항목의 도출에 관한 연구 (Study on the Establishing a Guideline for Selecting Major Environmental Factors by the Project Type Criteria in EIA)

  • 성현찬;한상욱
    • 환경영향평가
    • /
    • 제3권1호
    • /
    • pp.9-30
    • /
    • 1994
  • Environmental Impact Assessment System, ever since its enactment in Korea fourteen years ago, has been steadily improved by introduction and implementation of new concepts and methodologies which include Environmental Impact Statement(EIS) preparation technique, selection of environmental factors, and the like. However, current guideline requires that every EIS, regardless of the specifics of the project type or characteristics of the site, must evaluate and study for all twenty-two environmental factors as set forth in the regulation. The situation causes many undesirable problems like; lack of site specific evaluation in most EISs, over-sized EIS drafts, consuming too much time and costs for EIS preparation, and so on. The objectives of this study are: - To establish a set of criteria to classify the types of the projects in terms of features of the project content and the characteristics of the site area. - To establish a guideline for selecting major environmental factors of the project type criteria, and - To provide basic materials for the preparation of complets draft EIS of the Amendment of Environmental Impact Assessment Act.

  • PDF

파주생태습지의 부착규조를 이용한 생물학적 수질평가 (The biological assessment of water quality using DAIpo and TDI of Paju Ecological wetland)

  • 김용진;김헌년;이옥민
    • 환경영향평가
    • /
    • 제21권2호
    • /
    • pp.229-238
    • /
    • 2012
  • This research was to examine the physiochemical factors and the attached diatoms of ecological wetland in Paju from August 2010 to May 2011. As a result of physicohemical water quality assessment, the water temperature did not fluctuate much due to ample riparian vegetation and aquatic plants growing at the site. Due to the effect of Han River Estuary, site 4, 5 and 6 had high electricity conductivity. The BOD concentration was high at site 2, 3, and 4 caused by decrease in water quantity and inflow of polluted water. At all sites, T-N and T-P concentrations ranged from eutrophic to hypertrophic status. At the downstream, the T-N and T-P concentrations decreased by inhabiting aquatic plant. Total of 98 taxa of attached diatoms were found. As for dominant taxa, Achnanthes convergens, A. minutissima, Gomphonema gracile, G. parvulum, Melosira varians, Navicula seminulum, N. minima, N. pseudolanceolata, Nitzschia amphibia, N. palea, Surirella minuta and Synedra ulna var. fragilariodes appeared. The result of biological assessment of water quality rated the sites B(suboptimal)~D(poor) during seasons of low water temperature, Fall and Winter, with DAIpo ranging 24.1~68.2 and TDI of 48.4~85.6. During Spring and Summer, all sites were rated D(poor) with DAIpo lower than or equal to 40, and TDI above or equal to 70. The biological assessment of water quality at the research site showed inferior TDI result compared to that of DAIpo.

환경영향평가에서 GIS 활용에 관한 연구 : 폐기물매립지 적지분석과 악취영향평가 (GIS Application in Environmental Impact Assessment : Suitability Analysis and Odor Impact Assessment of Landfill Site)

  • 김명진;한의정;이재운;정동환;서창완
    • 환경영향평가
    • /
    • 제4권1호
    • /
    • pp.1-8
    • /
    • 1995
  • Environmental Impact Assessment(EIA) in Korea has developed as a tool for environmental conservation and decision making since Environmental Impact Statement(EIS) preparation in 1981. For effective implementation of it, we do system development and method enhancement continuously. The recently introduced GIS (Geographic Information System) can integrate geographic and attribute data, which will be applied to scoping, assessment, and alternative assessment, etc. in EIA. This study has three major components. First, it explains building of EIA factors of natural environment, living environment, and socio-economic environment of the study area defined in EIS preparation regulation. Second, the study presents applications of assessment method concerning suitability analysis of landfill site using GIS. Finally, it shows integration of GIS and odor impact assessment. Based on these analysis, the study makes some recommendations and conclusions.

  • PDF

건설업 위험성 평가 실효성을 위한 최적화 연구 (A Study on the Optimization Effectiveness of Risk Assessment in Construction Industry)

  • 백충현;조을룡
    • 대한안전경영과학회지
    • /
    • 제17권3호
    • /
    • pp.15-22
    • /
    • 2015
  • The risk assessment carried out on the construction site at the beginning of the implementation depends on the subjective judgment of risk of general contractor and subcontractors, whose opinion about frequency and intensity of risk is different. In this paper, research the awareness of general contractors and subcontractors about process of risk assessment at the construction site and its effectiveness. Researching of the main factors "frequency", "intensity" which determines the degree of risk gives the opportunity to find an option for improving the effective implementation of risk assessment.

대규모 공사시 비산먼지 산정 및 확산분석에 관한 연구 (A Study on Estimation and Dispersion Analysis of Fugitive Dust in Amount the Large Scale Construction)

  • 이내현;김윤신
    • 환경영향평가
    • /
    • 제9권3호
    • /
    • pp.249-255
    • /
    • 2000
  • The comparison of three different kind of simulation by screen3 model, Tem-8 model and EPA formula were undertaken to get a potential concentration and hourly maximum concentration of fugitive dust produced from each construction site in the downtown area of puchon city. The amount of dust estimate U.S EPA formula and fugitive dust formula 22.6078g/sec, 27.9572g/sec respectively. Hourly maximum concenstration at the distance from each construction site by screen3 model are average of $78.89{\sim}728.40{\mu}g/m^3$ and Tem-8 model are $97{\mu}g/m^3$ in site-1, $241{\mu}g/m^3$ in site-2, $268{\mu}g/m^3$ in site-3, $232{\mu}g/m^3$ in site-4, $69{\mu}g/m^3$ in site-5, $36{\mu}g/m^3$ in site-6. Through our experiment, Screen3 model is more encouragingly used than any other model.

  • PDF

부지환경종합관리시스템 개발과 적용 (Development and Application of SITES)

  • 박주완;윤정현;김창락;조성일
    • 방사성폐기물학회지
    • /
    • 제6권3호
    • /
    • pp.205-215
    • /
    • 2008
  • 방사성폐기물 처분시설에 대한 운영 전, 운영 중 및 폐쇄 후 단계에서의 부지환경자료의 지속적 수집 및 관리를 목적으로 한 체계적인 데이터베이스와 전산분석 시스템 구축의 필요성에 의하여 부지환경종합관리시스템(SITES: Site Information and Total Environmental Data Management System)을 개발하였다. 본 시스템은 부지환경 자료관리 및 안전성 재평가에 활용 할 수 있는 통합적인 시스템으로서 부지환경데이터관리시스템(SECURE), 통합안전성평가시스템(SAINT), 부지환경감시시스템(SUDAL), 그리고 SITES지리정보시스템(SITES-GIS)의 4개의 모듈로 구성되어 있다. 각 모듈은 자체 데이터베이스를 통해 자료의 검색, 저장 및 보고서 작성 기능을 가지고 있으며, 부지환경자료를 통합안전성평가시스템에서 직접이용 가능토록 되어 있다. 통합안전성평가시스템은 다수의 평가자가 동시에 이용가능하며, 대상 부지별 안전성평가 결과의 품질보증 체제가 확보되어 있다. 부지환경감시시스템은 평가 예측자료와 환경감시 자료와의 비교분석 및 시각화가 가능하며, 또한 일반인을 위한 주기적 환경감시 자료를 인터넷 홈페이지와 연계하여 공개 가능토록 되어 있다. 부지환경종합관리시스템은 현재 중 저준위 방사성폐기물 처분을 위한 월성원자력환경관리센터에 적용되고 있으며, 원자력관계시설 및 기타 유해환경 산업시설에 대한 부지 및 환경 감시기능의 수준을 고도화하는 데에 기여할 수 있을 것으로 기대된다.

  • PDF

개발 예정지역에서의 자연보전 가치 평가 - 대관령 알펜시아 리조트 조성 예정지역을 사례로 - (A Study for Natural Conservation Value Assessment of Developing Area - Case Study of Alpensia Resort -)

  • 최희선;조동길;박미영;김남균;김귀곤
    • 한국조경학회지
    • /
    • 제33권4호
    • /
    • pp.108-118
    • /
    • 2005
  • While the recent lift of restrictions in greenbelt areas is expected to generate a number of development plans, there are efforts to create various development plans into spatial plans that consider the natural and ecological conditions of development sites. However, these development plans consider Degree of Green Naturality or Degree of Ecology only when designating areas for conservation within development sites. It is true that they don't fully reflect the value of green areas and wetlands as habitats and natural resources. Therefore, this study built an conservation value assessment model that is applicable to sites where development is planned in Korea by reviewing prior case examples md studies and applied the developed model to a case study area. The site where the conservation value assessment model was applied to is an area around Yongsan-ri and Suha-ri, Doam-myon, Pyeongchang-gun, Gangwon province where quality natural resources are located in and wend the site. This is a site for the development of Alpensia Resort where a resort including facilities for the Winter Olympics is planned to be introduced. In order to assess the conservation value of the site for Alpensia Resort, a total of eight items including area, distribution of communities, habitation of species with conservation value, functions of habitats, connectivity of habitats, vegetation layers of forests, age of forests, and ratio of non-native plants were studied through literature review and field surveys. The assessment was made by dividing the site into 95 habitats that are perceived by aerial photographs and each habitat unit was assessed on the eight items in a 3-point scale. Each unit habitat assessed in a 3-point scale was segmented into primary, secondary or tertiary areas based on the conservation value. Habitats assessed as primary were designated as priority (absolute) conservation areas and those assessed as secondary and tertiary were set as secondary conservation areas and tertiary conservation areas, respectively. As a result, each area represented 26.9%, 20% and 3% of total site area. Based on this result, habitat management plans were developed to conserve primary conservation areas, improve secondary conservation areas and restore tertiary conservation areas. In addition, a development plan was developed to create habitats in areas where new habitats are requested in order to build an eco-network in the site and a plan to create eco-corridors was proposed. In developing a land use plan for the site, a development plan that considers conservation areas first should be set up based on the outcome of conservation value assessment. This can be linked to the development of an environment-friendly land use plan as well as easing the establishment of a green area and eco-network. This study will facilitate the implementation of the 'conservation before development' principle, which can prevent reckless development, by assessing conservation value in setting up development plans.