• 제목/요약/키워드: simulation of dam operation

검색결과 70건 처리시간 0.033초

용수수요를 고려한 DAWAST 모형 (Return Flows Considered DAWAST Model)

  • 노재경;이진영;진용신
    • 한국농공학회:학술대회논문집
    • /
    • 한국농공학회 2003년도 학술발표논문집
    • /
    • pp.503-506
    • /
    • 2003
  • The DAWAST model was originally developed to consider daily variation in the unsaturated soil water storage and it is a conceptual lumped model. Return flows from agricultural, domestic and industrial water were included to the original result of model simulation to calibrate model parameter. Daily inflow to the Daechung multipurpose dam was applied to verify the DAWAST model considered return flows. Simulation results were comparable to the inflows of dam operation reasonably.

  • PDF

Development of a Decision Support System for Turbid Water Management through Joint Dam Operation

  • Kim, Jeong-Kon;Ko, Ick-Hwan;Yoo, Yang-Soo
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2007년도 학술발표회 논문집
    • /
    • pp.31-39
    • /
    • 2007
  • In this study we developed a turbidity management system to support the operation for effective turbid water management. The decision-making system includes various models for prediction of turbid water inflow, effective reservoir operation using the selective withdrawal facility, analysis of turbid water discharge in the downstream. The system is supported by the intensive monitoring devices installed in the upstream rivers, reservoirs, and downstream rivers. SWAT and HSPF models were constructed to predict turbid water flows in the Imha and Andong catchments. CE-QUAL-W2 models were constructed for turbid water behavior prediction, and various analyses were conducted to examine the effects of the selective withdrawal operation for efficient high turbid water discharge, turbid water distribution under differing amount and locations of turbid water discharge. A 1-dimensional dynamic water quality model was built using Ko-Riv1 for simulation of turbidity propagation in the downstream of the reservoirs, and 2-dimensional models were developed to investigate the mixing phenomena of two waters discharged from the Andong and Imha reservoirs with different temperature and turbidity conditions during joint dam operation for reducing the impacts of turbid water.

  • PDF

Incremental DP에 의한 홍수시 댐군의 연계운영 (An Optimal Operation of Multi-Reservoirs for Flood Control by Incremental DP)

  • 이재형;이길성;정동국
    • 물과 미래
    • /
    • 제25권2호
    • /
    • pp.47-60
    • /
    • 1992
  • 북한강 수계에 위치한 화천댐과 소양강댐을 홍수시 연계운영을 위하여 Incremental DP를 사용하여 최적운영모형을 개발하였다. 목적함수로는 의암댐 합류점의 첨두 유량을 최소화하는 것으로 하였으며 수리-수문학적 제약조건은 홍수시 댐조작에 관한 법령, 각 댐 및 하도특성을 고려하여 설정하였다. 특히, 2차 홍수에 대비하여 홍수가 끝나는 시점의 수위가 제한수위가 되도록 하였다. 또한 Incremental DP 모형의 운영결과와 Simulation 및 DP에 의한 단일댐 운영결과를 조절률과 이용률의 관점에서 비교하였고, 합류점의 첨두유량을 Feedback Loop를 이용한 Simulation 결과와 비교하였다. 운영결과 조절률과 이용률이 Simulation 및 DP에 의한 단일댐 운영결과보다 다소 낮게 나타났고, 합류점 유량이 Feedback Loop에 결과보다 크게 나타났는데 이는 홍수말기의 수위에 관한 제약조건 때문이다.

  • PDF

신경망을 이용한 낙동강 유역 홍수기 댐유입량 예측 (Dam Inflow Forecasting for Short Term Flood Based on Neural Networks in Nakdong River Basin)

  • 윤강훈;서봉철;신현석
    • 한국수자원학회논문집
    • /
    • 제37권1호
    • /
    • pp.67-75
    • /
    • 2004
  • 본 연구에서는 홍수시 다목적댐의 효율적 운영을 위하여 상류로부터 유입되는 홍수유입량을 실시간으로 예측하기 위해 역전파 신경망 모형을 사용하여 댐유입량 예측모형(Neural Dam Inflow Forecasting Model; NDIFM)을 개발하였다. NDIFM은 다목적댐에 의한 하류의 홍수조절 비중이 큰 낙동강의 남강댐 유역에 적용하였으며, 입력자료로는 댐유역 평균강우량, 실측 댐유입량, 예측 댐유입량 통을 사용하여 실시간 댐유입량 예측의 가능성을 검토하였다. 실측치와 예측치를 비교ㆍ검토한 결과 제시한 세 가지 모형 중 NDIFM-I이 가장 우수한 결과를 나타내었으며, NDIFM-II 및 NDIFM-III 또한 다양한 예측가능성을 보여주었다. 따라서, 강우-유출의 비선형시스템 모의를 위하여 물리적 매개변수가 복잡한 개념적 모형보다는 양질의 수문관측 자료만 축적된다면 블랙박스 모형인 신경망 모형이 실시간 홍수예측에 효율적으로 활용될 수 있을 것이다.

충주댐 방류에 따른 댐 상하류 홍수위 영향 분석 (Effect of Chungju Dam Operation for Flood Control in the Upper Han River)

  • 김상호;김지성
    • 대한토목학회논문집
    • /
    • 제33권2호
    • /
    • pp.537-548
    • /
    • 2013
  • 본 연구에서는 2006년 홍수시 충주댐 운영에 따른 댐 상 하류의 홍수위 상승영향을 정량적으로 분석하기 위하여 팔당댐 상류의 한강 본류에 위치한 충주댐을 기준으로 상류구간과 하류구간으로 구분하고, 1995년부터 2008년까지의 홍수사상을 대상으로 모형을 검보정함으로써 수리학적 모형을 구축하였다. 구축된 모형을 이용하여 충주댐의 유무를 가정하여 충주댐의 홍수조절효과를 검토하고, 방류량의 변화에 따른 상 하류 주요지점의 수위 상승영향을 정량적으로 분석하였다. 분석결과, 2006년 홍수시 충주댐의 운영이 비교적 적절하게 수행되었음을 확인하였으나, 충주댐의 홍수조절효과는 댐 하류구간에 집중되어 있어 댐 상류 홍수피해 저감을 위한 제도적 보완이 필요한 것으로 분석되었다. 이러한 문제점을 해결하기 위하여 기존 댐 배수구간 상류 하천의 기점수위 결정방법의 한계를 검토하였으며, 댐 배수구간과 상류 하천의 계획홍수량 불연속을 반영할 수 있는 기점수위 결정방법을 제안하였다. 제안된 방법은 댐 상류하천의 홍수피해 저감을 위한 설계 및 홍수피해 발생시 피해원인 분석에 활용될 수 있을 것이다.

퍼지제어모형을 이용한 다목적 댐의 홍수조절모형 (II) - 과거홍수사상에 대한 적용 - (Multipurpose Dam Operation Models for Flood Control Using Fuzzy Control Technique ( II ) - Simulation of Historical Flood Events -)

  • 심재현;김지태;조원철;김진영
    • 한국방재학회 논문집
    • /
    • 제4권1호
    • /
    • pp.41-50
    • /
    • 2004
  • 본 연구에서는 퍼지제어기법을 이용한 홍수조절 모형의 적용성을 파악하기 위해 한강수계 단일댐에 적용하였다. 개발된 모형들의 홍수조절능력을 비교하기 위해 1984, 1990, 1995년 대홍수 발생시 실제 운영실적과 본 연구에서 개발된 모형들의 가상운영결과를 비교하였다. 본 연구에서 개발한 3개 모형은 모두 실제 적용성을 고려하여 댐의 수위와 유입량이라는 2가지 정보량으로부터 방류량을 결정토록 하였으며, 최대방류량 역시 댐 설계시 기준인 허용최대방류량을 초과하지 않도록 하였다. 각 홍수사상에 대해 적용한 결과 기존의 댐 운영결과에 비해 홍수위를 낮출 수 있으면서도 하류부의 피해 최소화에도 적절한 것으로 나타나 퍼지제어모형의 적용성을 확인할 수 있었다.

소규모 댐의 효과적 운영을 위한 저수관리 기법 개발 (Development of Storage Management Method for Effective Operation of Small Dams)

  • 김필식;김선주
    • 한국농공학회논문집
    • /
    • 제48권2호
    • /
    • pp.27-35
    • /
    • 2006
  • Large dams are managed with operation standard and flood forecasting systems, while small dams do not have management method generally. Shortage of water resources and natural disasters due to drought and flood raised public concerns for management of small dams. Most of small dams are irrigation dams, which need diversified water uses. However, the lack of systematic management of small dams have caused serious water wastage and increased natural disasters. Storage management method and system were developed to solve these problems in small dams. The system was applied to Seongju dam for effective management. The storage management method was established considering hydrology simulation and statistical analysis using the system. This method can bring additional available water, even in the same conditions of the water demand and the supply conditions of watershed. It can improve the flood control capacity and water utilization efficiency by' the flexible operation of storage space.

금강-보령댐 도수터널 운영에 따른 금강 본류 내 수위 영향 분석 연구 (Impacts on Water Surface Level of the Geum River with the Diversion Tunnel Operation for Low Flow Augmentation of the Boryong Dam)

  • 장석환;오경두;오지환
    • 한국환경과학회지
    • /
    • 제26권9호
    • /
    • pp.1031-1043
    • /
    • 2017
  • Recently severe drought caused the water shortage around the western parts of Chungcheongnamdo province, South Korea. A Diversion tunnel from the Geum river to the Boryong dam, which is the water supply dam for these areas has been proposed to solve this problem. This study examined hydraulic impacts on the Geum river associated with the diversion plan assuming the severe drought condition of 2015 would persist for the simulation period of 2016. The hydraulic simulation model was verified using hydrologic and hydraulic data including hourly discharges of the Geum river and its 8 tributaries, fluctuation of tidal level at the mouth of the river, withdrawals and return flows and operation records of the Geum river barrage since Feb. 1, 2015 through May 31, 2015. For the upstream boundary condition of the Geum river predicted inflow series using the nonlinear regression equation for 2015 discharge data was used. In order to estimate the effects of uncertainty in inflow prediction to the results total four inflow series consisting of upper limit flow, expected flow, lower limit flow and instream flow were used to examine hydraulic impacts of the diversion plan. The simulation showed that in cases of upper limit and expected flows there would be no problem in taking water from the Geum river mouth with a minimum water surface level of EL(+) 1.44 m. Meanwhile, the simulation also showed that in cases of lower limit flow and instream flow there would be some problems not only in taking water for water supply from the mouth of the Geum river but also operating the diversion facility itself with minimum water surface levels of EL(+) 0.94, 0.72, 0.43, and 0.14 m for the lower limit flow without/with diversion and the instream flow without/with diversion, respectively.

홍수기중의 실시간 저수지운영 모형(II) - 대청댑의 단일저수지 운영 방안 - (A Model for Real-time Reservoir Operations during Flood Period.II : Single Reservoir Operating Rules at Daecheong Dam)

  • 심명필;박인보
    • 물과 미래
    • /
    • 제23권4호
    • /
    • pp.499-507
    • /
    • 1990
  • 홍수기중의 실시간 저수지 운영을 위해서는 매시간 on-line으로 입력된 자료와 예측치로부터 시간별 최적방류량을 구해야 한다. 이를 위해서 댐하류의 홍수피해를 최소화하고 홍수 말기의 용수보존을 고려하는 무의 모형의 기법을 발표한 바 있다. 본 논문에서는 홍수시의 대청댐의 단일저수지 운영을 위해 모형을 적용하고 결과를 검토하며, 과거의 측정된 유입량과 방류량자료도 검토한다. 초기저수위를 달리하여 각 재현 기간별 홍수수문곡선을 다루고, 강우유출 모형으로부터 얻은 예측유입량을 구하여 운영한 뒤에 실제값과 비교하였다. 연구결과에 의하면 예측유입량의 불확실성을 고려하기 위해 위험계수를 적용하면 홍수조절용량을 효율적으로 이용할 수 있다.

  • PDF

발전용댐 이수능력 평가 연구(II): 확률론적 유입량을 고려한 발전용댐 용수공급능력 범위 산정 (Evaluation of hydropower dam water supply capacity (II): estimation of water supply yield range of hydropower dams considering probabilistic inflow)

  • 정기문;강두선;김동현;이승오;김태순
    • 한국수자원학회논문집
    • /
    • 제55권7호
    • /
    • pp.515-529
    • /
    • 2022
  • 이용 가능한 수자원의 규모를 파악하는 것은 지속가능한 이수계획 수립에 필수적인 과정이다. 특히 댐 시설은 용수를 저류하여 갈수기에 공급하기 위한 주요 수공 시설물로써 댐 유입량 및 댐 운영 방안에 따라 댐의 용수공급능력은 크게 달라질 수 있다. 국내에서는 과거 유입량 관측자료를 바탕으로 저수지 운영모의 방법을 통해 댐 용수공급능력을 산정하고 있으며, 이때 관측기간 내 가뭄발생 여부에 따라 용수공급능력이 과소 혹은 과다 추정되는 불확실성을 내포하며, 이는 수자원 계획 수립의 신뢰도를 저해하는 요인이 될 수 있다. 본 연구에서는 발전용댐의 용수공급능력 적정 범위를 산정하기 위해 확률론적 유입량 자료를 활용하였다. 즉, 다양한 기후 및 사회경제 변화를 반영한 확률론적 댐 유입량 및 이를 활용한 발전용댐 용수공급능력의 범위를 산정하는 방법을 제시하였으며, 국내 한강수계에 위치한 발전용댐을 대상으로 분석을 수행하였다. 향후 기후변화에 대응하기 위한 발전용댐의 용수공급능력 파악은 더욱 중요해질 것으로 예상되며, 본 연구 결과는 다양한 기후 시나리오에서의 댐 용수공급능력 범위를 정량적으로 파악함으로써 국내 수자원 계획 수립에 기여할 것으로 기대된다.