Proceedings of the Korean Institute of Navigation and Port Research Conference
/
2004.11a
/
pp.169-174
/
2004
To design ship channel is one of important factors for planning and developing a port. In most case, the core factors for designing ship channel are the layout and width of dvnnel provided the net underkeel clearance is assessed as safety. In this study, Variable Bumper Area(VBA) model is applied to design and assess ship channel. This model reflects ship's principle dimension, ship domain theory, ship speed, conning officer's ship handling skill and experience and all external forces which cause leeway, set and drift and the change of ship maneuvering characteristics. Full Mission Ship Handling Simulator is used to analyze ship dynamic data according to conning officer's ship control, external forces, etc. This model uses Domain-index for assessing the efficiency and safety of the channel. The proposed model is applied to Ulsan new port plan which has a channel width of 1.5 times the length if the largest vessel, a radius if 5 times the length of the largest vessel in a curve of 57 degree centerline angle and SBM facility adjacent to the lateral edge if channel. The result of this study shows tint the width and radius of channel curve are suitable for the target ship but the difficulty of ship handling is caused by the large course change and SBM located in the vicinity if channel.
The aim of this study was to enhance the safety and care of mental health for seafarer working in passenger ship workspaces. Brightness, color values, and color distribution were investigated with issues and improvement ways identified through seafarers' interviews. Firstly, previous studies, references, current policy, regulations, and accident case studies were reviewed. Color compositions of wheelhouse and engine room of M Ship were then surveyed in the field. Color values of each space were analyzed using a colorimeter. Colormeter analysis of brightness and color measurements in the wheelhouse and engine areas indicated that ceilings, walls, and floors were generally dark, with the engine area being very dark. Regarding color, green and blue were distributed in the ceiling of the wheelhouse and engine area, while red and blue were in the walls and floors of the wheelhouse and engine area. According to interviews with seafarers currently working at engine rooms, they responded about their experience of near miss incidents due to a decrepit indoor environment, a dark working environment, slippery and bright flooring, and stairs that were not suitable for domestic users. Thus, when installing lighting in the future, the brightness of the space should be improved by distinguishing between night and day. A lighting plan considering the location of lighting, level of shadow formation and contrast, reflectance of the facility, glare, color of light, floor color plan, and material selection is needed. A facility design suitable for domestic users is also needed.
Journal of the Korean Society of Marine Environment & Safety
/
v.30
no.2
/
pp.209-216
/
2024
Four accidents occurred between 2020 and 2022 after car ferries built according to a coastal passenger ship modernization plan collided with other ships or came into contact with the dock when entering Jeju Port. Accidents primarily occurred owing to careless ship handling and drift by wind during ship handled by herself using bow and stern thrusters without tugboats. Accordingly, in this study, we analyzed the collision accident focusing on car ferry H and the critical wind speed at which the ship cannot be controlled using its own power, tugboat operation plan in increasing wind speed were proposed based on the power required for the ship to berth parallel to the pier without a tugboat considering the external force and moment generated while the ship is berthing. A analysis of the critical wind speed of car ferry H by relative wind direction when using tugboats or not according to the loading status and the berthing speed, showed that one tugboat should be used at the stern when the lateral wind speed is over 10 m/s and two tugboats should be used when the lateral wind speed is over 14m/s berthing at Jeju port.
Seo, Ki-Yeol;Oh, Se-Woong;Cho, Deuk-Jae;Park, Sang-Hyun;Suh, Sang-Hyun
Journal of the Korea Institute of Information and Communication Engineering
/
v.10
no.11
/
pp.1927-1933
/
2006
This paper proposes the implementation plan of information network for an E-Navigation. Firstly, It configures to the network system based on E-Navigation information network using information and communication technology. And then, it builds on the total port network and tuning up the maritime traffic support system. It will expect to the efficiency through information network between ship to ship related pen operator. Building of information network for the E-Navigation, it is to build on the wireless internet infrastructure for the port logistics and traffic safety.
Journal of the Society of Naval Architects of Korea
/
v.30
no.3
/
pp.1-15
/
1993
In response to the growing domestic request and the change of the overseas environment, Hyundai Maritime Research Institute has recently established a three-stage development plan for the high speed marine transportation system. As the first stage plan, the long-range high-speed foil catamaran passenger ship has been designed and constructed for the open-sea serivice of 800 nautical miles round trip with top speed above 40 knots. Extensive theoretical analyses and model tests were systematically carried omit along the course of design for the system optimization and the verification. In this paper, the brief summary of the design and the construction works shall be presented.
Hwang, In Hyuck;Kim, Youngmin;Lee, Dong Kun;Shin, Jong Gye
International Journal of Naval Architecture and Ocean Engineering
/
v.6
no.1
/
pp.162-174
/
2014
Most shipbuilding scheduling research so far has focused on the load level on the dock plan. This is because the dock is the least extendable resource in shipyards, and its overloading is difficult to resolve. However, once dock scheduling is completed, making a plan that makes the best use of the rest of the resources in the shipyard to minimize any additional cost is also important. Block assignment planning is one of the midterm planning tasks; it assigns a block to the facility (factory/shop or surface plate) that will actually manufacture the block according to the block characteristics and current situation of the facility. It is one of the most heavily loaded midterm planning tasks and is carried out manually by experienced workers. In this study, a method of representing the block assignment rules using a diagram was suggested through analysis of the existing manual process. A block allocation program was developed which automated the block assignment process according to the rules represented by the diagram. The planning scenario was validated through a case study that compared the manual assignment and two automated block assignment results.
Sang-Hyun, Kim;Woo, Lee;Seung-Hong, Oh;Ju-Wan, Lee;Min-Woo, Son;Won-Jung, Kim
The Journal of the Korea institute of electronic communication sciences
/
v.17
no.6
/
pp.1259-1266
/
2022
Stowage planning is an essential process for safe loading by establishing, agreeing on, and systematically implementing a reasonable loading and securing method based on information on cargo, loading/unloading and the ship. In addition, depending on the plan, there may be a difference of about 14% or more in the loading amount per ship, which causes a tolerance rate and leads to an increase in sea freight charges. In this study, work environment and process standards for steel coil shipment, and classification regulations and guidelines related to steel coil shipment were analyzed. In addition, we developed a steel coil loading and placement automation system that derives an optimal loading plan through performance data-based shipping balancing and stability analysis.
Journal of Korean Institute of Industrial Engineers
/
v.17
no.1
/
pp.1-8
/
1991
For situations where there are several markets for a product with different profit/cost structures, an economic variables sampling plan is developed for determining the market to ship the lots to. It is assumed that the quality characteristic X is normally distributed with known variability and unknown mean having a normal prior distribution. Profit models are constructed which involve four profit/cost components ; profit from a conforming item, inspection cost, replacement cost, and cost from an accepted nonconforming item. Methods of finding optimal sampling plan are presented and a numerical example is given.
Journal of the Society of Naval Architects of Korea
/
v.40
no.1
/
pp.63-68
/
2003
Systematic geometrical variation method of hull forms, such as "1 -Cp", "Swinging" and "Lackenby" are widely used in the early stage of a new design from those of a similar parent ship, which shows a better performance through the model test and/or sea trials. This method is simple and easy to modify original hull forms without changing the main characteristics. The shape of the prismatic curie can be easily varied by these methods, however, the frame line shape in the body plan can′t be generated easily, when the section shapes are complicated or have discontinuities or the mismatch of the body plan and the stem and stern profiles. To overcome this drawback of the hull form variations, a simple and useful method has been proposed in the present study.
Journal of the Korean Society of Industry Convergence
/
v.24
no.1
/
pp.19-29
/
2021
In the Port Logistics system, Container Stowage planning is an important issue for cost-effective efficiency improvements. At present, Planners are mainly carrying out Stowage planning by manual or semi-automatically. However, as the trend of super-large container ships continues, it is difficult to calculate an efficient Stowage plan with manpower. With the recent rapid development of artificial intelligence-related technologies, many studies have been conducted to apply enhanced learning to optimization problems. Accordingly, in this paper, we intend to develop and present a Deep Q-Learning Network model for the Master Stowage planning of Container ships.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.