Field test and research on shield cutting pile penetrating cement soil single pile composite foundation

  • Ma, Shi-ju;Li, Ming-yu;Guo, Yuan-cheng;Safaei, Babak
    • Geomechanics and Engineering
    • /
    • v.23 no.6
    • /
    • pp.513-521
    • /
    • 2020
  • In this paper, due to the need for cutting cement-soil group pile composite foundation under the 7-story masonry structure of Zhenghe District and the shield tunnel of Zhengzhou Metro Line 5, a field test was conducted to directly cut cement-soil single pile composite foundation with diameter Ф=500 mm. Research results showed that the load transfer mechanism of composite foundation was not changed before and after shield tunnel cut the pile, and pile body and the soil between piles was still responsible for overburden load. The construction disturbance of shield cutting pile is a complicated mechanical process. The load carried by the original pile body was affected by the disturbance effect of pile cutting construction. Also, the fraction of the load carried by the original pile body was transferred to the soil between the piles and therefore, the bearing capacity of composite foundation was not decreased. Only the fractions of the load carried by pile and the soil between piles were distributed. On-site monitoring results showed that the settlement of pressure-bearing plates produced during shield cutting stage accounted for about 7% of total settlement. After the completion of pile cutting, the settlements of bearing plates generated by shield machine during residual pile composite foundation stage and shield machine tail were far away from residual pile composite foundation stage which accounted for about 15% and 74% of total settlement, respectively. In order to reduce the impact of shield cutting pile construction on the settlement of upper composite foundation, it was recommended to take measures such as optimization of shield construction parameters, radial grouting reinforcement and "clay shock" grouting within the disturbance range of shield cutting pile construction. Before pile cutting, the pile-soil stress ratio n of composite foundation was 2.437. After the shield cut pile is completed, the soil around the lining structure is gradually consolidated and reshaped, and residual pile composite foundation reaches a new state of force balance. This was because the condensation of grouting layer could increase the resistance of remaining pile end and friction resistance of the side of the pile.

Effects of pile tip cutting due to shield TBM tunnel construction on pile behaviour under various reinforcement conditions

  • Young-Jin Jeon;Seung-Kueon Seo;Young-Nam Choi;Ho-Yeol Son;Byung-Soo Park;Jae-Hyun Kim;Cheol-Ju Lee
    • Geomechanics and Engineering
    • /
    • v.39 no.2
    • /
    • pp.181-195
    • /
    • 2024
  • Existing piles, especially in urban areas, are at risk of being cut by new tunnel construction, potentially affecting their serviceability. This study examined the behaviour of piles under various reinforcement conditions subject to tip cutting resulting from tunnel excavation. For this, the construction of a tunnel using a shield tunnel boring machine adjacent to existing single and group piles was simulated. A three-dimensional finite element analysis was used to perform the simulations. Certain piles in the group were simulated by cutting the pile tips to mimic the effect of tunnel excavation, and the behaviour of the piles was studied by considering the effect of pile cap and ground reinforcements. A numerical analysis was used to examine the ground settlement caused by tunnel excavation, pile head settlement, axial pile force, and shear stress occurring at the pile-ground interface. The results revealed that for all piles with pile tips supported by weathered rock, the shear stress distributions demonstrated similar trends, whereas for piles with cut tips, tensile or compressive forces occurred simultaneously according to the relative position by pile depth. Additionally, when the pile tip was supported by weathered rock, approximately 70% of the support was due to shaft friction and the remaining 30% was provided by the pile tip. For piles without reinforcement, the final settlement was approximately 70% greater than that of piles with grouting reinforcement. These results indicate that pile and ground settlements are substantially influenced by pile tip cutting and reinforcement conditions.

A study on the effect of the pile tip deformations on the pile behaviour to shield TBM tunnelling (Shield TBM 터널시공으로 유발된 말뚝선단의 변형이 말뚝거동에 미치는 영향에 대한 연구)

  • Young-Jin Jeon;Byung-Soo Park;Young-Nam Choi;Cheol-Ju Lee
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.26 no.3
    • /
    • pp.169-189
    • /
    • 2024
  • In the current work, a series of three-dimensional finite element analyses have been carried out to understand the behaviour of pre-existing single piles and pile groups to adjacent Shield TBM tunnelling by considering various reinforcement conditions. The numerical modelling has analysed the effect of the pile cutting, ground reinforcement and pile cap reinforcement. The analyses concentrate on the ground settlements, the pile head settlements, the axial pile forces and the shear stress transfer mechanism at the pile-soil interface. In all cases of the pile tips supported by weathered rock, the distributions of shear stresses presented a similar trend. Also, when the pile tips were cut, tensile forces or compressive forces were induced on the piles depending on the relative positions of the piles. Furthermore, when the pile tips are supported by weathered rock, approximately 70% of the load is supported by surface friction, and only the remaining 30% is supported by the pile tip. Furthermore the final settlement of the piles without reinforcement showed approximately 70% more settlement than the piles for which ground reinforcement is considered. It has been found that the ground settlements and the pile settlements are heavily affected by the pile cutting and reinforcement conditions. The behaviour of the single pile and group piles, depending on the pile cutting, conditions of ground and pile cap reinforcement, has been extensively examined and analysed by considering the key features in great details.