• Title/Summary/Keyword: settlement of raft

Search Result 64, Processing Time 0.021 seconds

Compressive Behavior of Micropile According to Pile Spacing and Embedded Pile Angle in Sand (사질토 지반에 설치된 마이크로파일의 설치간격 및 설치각도에 따른 압축거동특성)

  • Kyung, Doo-Hyun;Kim, Ga-Ram;Kim, Dae-Hong;Shin, Ju-Ho;Lee, Jun-Hwan
    • Journal of the Korean Geotechnical Society
    • /
    • v.29 no.12
    • /
    • pp.57-67
    • /
    • 2013
  • Micropile technology has evolved continuously since its instruction by Fernando Lizzi in the 1950s. The effects of group micropile have been researched by many researchers. The effects of group micropile differ and change with pile length, pile spacing (S), pile angle (${\theta}$) and pile embedded conditions. In the present study, the effects of resistance increase and settlement reduction from micropiles were investigated through a series of axial load tests. For the study, axial load tests were performed using mat, group micropiles and micropiled-raft (MPR) in various pile spacing and pile angle conditions. As the result, the effects of resistance of micropiled-raft were 80% (3D) to 110% (7D) of the total resistance of mat and group micropile. The effects of settlement restraint of micropiled-raft were 20% (S=3D, ${\theta}=45^{\circ}$) to 70% (7D, ${\theta}=15^{\circ}$) of settlement of mat foundation.

Settlement behavior and controlling effectiveness of two types of rigid pile structure embankments in high-speed railways

  • Wang, Changdan;Zhou, Shunhua;Wang, Binglong;Guo, Peijun;Su, Hui
    • Geomechanics and Engineering
    • /
    • v.11 no.6
    • /
    • pp.847-865
    • /
    • 2016
  • In this study, a series of geotechnical centrifugal tests were conducted to investigate the effectiveness of settlement control of two types of rigid pile structure embankments (PRSE) in collapsible loess under high-speed railway embankments. The research results show that ground reinforcement is required to reduce the post-construction settlement and settlement rate of the embankments. The rigid pile structure embankments using rigid piles can substantially reduce the embankment settlement in the construction of embankments on collapsible loess, and the efficiency in settlement reduction is affected by the pile spacing. The pile-raft structure embankments (PRSE) have much stronger ability in terms of the effectiveness of settlement control, while the pile-geogrid structure embankments (PGSE) provides rapid construction as well as economic benefits. Rational range of pile spacing of PRSE and PGSE are suggested based on the requirements of various railways design speeds. Furthermore, the time effectiveness of negative skin friction of piles and the action of pile-cap setting are also investigated. The relevant measures for improving the bearing capacity and two parts of transition zone forms as positive control mean have been suggested.

Effects of rock-support and inclined-layer conditions on load carrying behavior of piled rafts

  • Roh, Yanghoon;Kim, Garam;Kim, Incheol;Lee, Junhwan
    • Geomechanics and Engineering
    • /
    • v.18 no.4
    • /
    • pp.363-371
    • /
    • 2019
  • In this study, the load carrying behavior of piled rafts installed in inclined bearing rock layer was investigated for rock-mounted and -socketed conditions. It was found that settlements induced for an inclined bearing rock layer are larger than for a horizontal layer condition. The load capacity of piled rafts for the rock-mounted condition decreased as rock-layer inclination angle (${\theta}$) increased, while vice versa for the rock-socketed condition. The load capacities of raft and piles both decreased with increasing ${\theta}$ for the rock-mounted condition. When bearing rock layer was inclined, loads carried by uphill-side piles were greater than those by downhill-side piles. The values of differential settlements of rock-mounted and -socketed conditions were not significantly different whereas slightly higher for the rock-socketed condition. The values of load sharing ratio (${\alpha}_p$) and its variation with settlement were not markedly changed by the inclination of bedrock. It was shown that ${\alpha}_p$ for piled rafts installed in rock layer was not affected by ${\theta}$ whereas actual loads carried by raft and piles may vary depending on the pile installation and rock-layer inclination conditions.

Settlement behaviours and control measures of twin-tube curved buildings-crossing shield tunnel

  • Jianwei, Jia;Ruiqi, Gao;Defeng, Wang;Jianjun, Li;Ziwen, Song;Jinghui, Tan
    • Structural Engineering and Mechanics
    • /
    • v.84 no.5
    • /
    • pp.699-706
    • /
    • 2022
  • Settlement control techniques are critical for the safety of shield tunnel constructions, especially for facing complex situations. In this study, the shield tunnel structure from Huaita east road station to Heping Road station in Xuzhou metro No.3 line (China) is taken as engineering background, which has various complex problems of the upper-soft and lower-hard composite stratum conditions, twin curve shield tunnels, and underpass the foundation of the piled raft. The deformation characteristics of shield tunnelling passing through buildings are explored. Subsequently, comprehensive research methods of numerical simulation and field measurement are adopted to analyzing the effectiveness of settlement control by using the top grouting technique. The results show that the settlement of the buildings has obvious spatial characteristics, and the hysteresis effect can be obviously observed in soil deformation caused by shield construction. Meanwhile, the two shield constructions can cause repeated disturbances, reducing the soil deformation's hysteresis effect. Moreover, the shield tunnel's differential settlement is too large when a single line passes through, and the shield construction of the outer curve can cause more significant disturbance in the tunnel than the inside curve. Notably, the proposed process control parameters and secondary topgrouting method can effectively control the deformation of the shield tunnel, especially for the long-term deformation.

The Experimental Study on Load Sharing Ratio of Group Pile (무리말뚝의 하중분담율에 관한 실험적 연구)

  • Kwon, Oh-Kyun;Oh, Se-Bung;Kim, Jin-Bok;Park, Jong-Un
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.65-70
    • /
    • 2005
  • In this study, the large scale model tests were executed to estimate the Load Sharing Ratio(LSR) of raft in a piled footing under various conditions. The conditions such as the subsoil type, pile length, pile spacing, array type and pile installation method etc. were varied in the pile loading tests about the free-standing group piles and a piled footing. As the results of this study, it was found that there were no differences of the load-settlement curves, along with the pile installation method and subsoil type. The piles supported most of the external load until a yielding load of the piled footing, but the raft supported a considerable load after a yielding load. And it was also found that the LSR didn't be affected by the pile installation method and the subsoil type. As the relative density of sands increased, the LSR decreased. As the pile spacing was wider and the pile length increased, there was a tendancy for the LSR to increase.

  • PDF

Experimental Study on the Load Sharing Ratio of G개up Pile (무리말뚝의 하중분담률에 관한 실험적 연구)

  • Kwon Oh-Kyun;Oh Se-Bung;Kim Jin-Bok
    • Journal of the Korean Geotechnical Society
    • /
    • v.21 no.5
    • /
    • pp.51-58
    • /
    • 2005
  • In this study, the large scale model tests were executed to estimate the Load Sharing Ratio (LSR) of raft in a piled footing under various conditions. The conditions such as the subsoil type, pile length, pile spacing, away type and pile installation method etc. were varied in the pile loading tests about the free-standing group piles and a piled footing. As a result of this study, it was found that there was no difference in the load-settlement curves, resulting from the pile installation method and subsoil type. The piles supported most of the external load until a yielding load of the piled footing, but the raft supported a considerable load after a yielding load. As the relative density of sands increased, the LSR decreased. As the pile spacing was wider and the pile length increased, there was a tendancy for the LSR to increase. But it was also found that the LSR was not affected by the pile installation method and the subsoil type.

Evaluating the impacts of using piles and geosynthetics in reducing the settlement of fine-grained soils under static load

  • Shariati, Mahdi;Azar, Sadaf Mahmoudi;Arjomand, Mohammad-Ali;Tehrani, Hesam Salmani;Daei, Mojtaba;Safa, Maryam
    • Geomechanics and Engineering
    • /
    • v.20 no.2
    • /
    • pp.87-101
    • /
    • 2020
  • The construction of combined pile-raft foundations is considered as the main option in designing foundations in high-rise buildings, especially in soils close to the ground surface which do not have sufficient bearing capacity to withstand building loads. This paper deals with the geotechnical report of the Northern Fereshteh area of Tabriz, Iran, and compares the characteristics of the single pile foundation with the two foundations of pile group and geogrid. Besides, we investigate the effects of five principal parameters including pile diameter and length, the number of geogrid layers, the depth of groundwater level, and pore water pressure on vertical consolidation settlement and pore water pressure changes over a year. This study assessed the mechanism of the failure of the soil under the foundation using numerical analysis as well. Numerical analysis was performed using the two-dimensional finite element PLAXIS software. The results of fifty-four models indicate that the diameter of the pile tip, either as a pile group or as a single pile, did not have a significant effect on the reduction of the consolidation settlement in the soil in the Northern Fereshteh Street region. The optimum length for the pile in the Northern Fereshteh area is 12 meters, which is economically feasible. In addition, the construction of four-layered ten-meter-long geogrids at intervals of 1 meter beneath the deep foundation had a significant preventive impact on the consolidation settlement in clayey soils.

Finite Element Analysis of the Complex Behavior and Load Bearing Characteristics of a Foundation Pile Connector (유한요소해석을 이용한 복합거동 연결체의 하중지지 특성)

  • Shin, Hee-Soo;Kim, Ki-Sung;Hong, Seung Seo;Kim, YoungSeok;Ahn, Jun-Hyuk
    • The Journal of Engineering Geology
    • /
    • v.29 no.4
    • /
    • pp.451-460
    • /
    • 2019
  • In this study, a complex behavior connector is proposed to overcome the problems that may occur when small pile pipe and micro pile is used as a friction pile concept in the lower foundation of an oil sand plant where a piloti foundation is used. The individual settlement and heaving of piles were connected in one group to allow the composite behavior. This study performed to analyze the load carrying capacity to identify a complex behavior. In addition, the shape of the composite behavior connector was examined to apply the advantages of pile-group and piled raft foundations to oil sand plants. A scale model was constructed to measure the behavior of the load. The stability and weakness of the device were selected to determine the shape of the connector using the scale model testing.

Experimental Study on the Reinforcement Effect of Geogrid in Soft Ground Improvement (연약지반 개량시 지오그리드 보강효과에 관한 실험적 연구)

  • Ham, Hyeon-Su;Lee, Sang Duk
    • Journal of the Korean Geosynthetics Society
    • /
    • v.17 no.2
    • /
    • pp.1-7
    • /
    • 2018
  • The number of construction of roads and railroads in soft ground such as coastal areas and wetlands is getting increased. For this reason cases that soft ground improvement is applied are increasing. In general, many ground improvement methods consider only the working conditions at the time or only economy. But if the working condition and economy are taken into consideration together, the number of applicable construction method gets limited. In such a case, a ground improvement method using both the surface layer portion and the deep layer portion is applied. But the basic research on this is still insufficient in practice. Therefore, in this study the reinforcement effect of geogrid was investigated by carrying out the model test realizing the case in which soft surface ground improvement and depth improvement are simultaneously applied. And it was intened to understand the effect of the thickness of surface layer, the diameter and length of the improvement body on the reinforcement effect of geogrid. The result showed that the effect of the surface layer thickness is greater than the effect of the deep layer diameter. Moreover, when the surface layer is reinforced with a geogrid, the strength of the surface layer part is enhanced and this effect of a geogrid reinforcement caused the reduction of surface settlement.

Driving Burj Dubai Core Walls with an Advanced Data Fusion System.

  • Cranenbroeck, Joel Van;Hayes, Douglas McL;Sparks, Ian R
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • v.1
    • /
    • pp.465-469
    • /
    • 2006
  • In recent years there has been considerable interest in the construction of super high-rise buildings. From the prior art, various procedures and devices for surveys during and after the phase of erection of a high-rise building are known. High-rise buildings are subject to strong external tilt effects caused, for instance, by wind pressures, unilateral thermal effects by exposure to sunlight, and unilateral loads. Such effects are a particular challenge in the phase of construction of a high-rise building, in as much as the high-rise building under construction is also subject to tilt effects, and will at least temporarily lose its - as a rule exactly vertical - alignment. Yet construction should progress in such a way that the building is aligned as planned, and particularly so in the vertical, when returning into an un-tilted basic state.It is essential that a straight element be constructed that theoretically, even when moving around its design centre point due to varying loads, would have an exactly vertical alignment when all biasing conditions are neutralised. Because of differential raft settlement, differential concrete shortening, and construction tolerances, this ideal situation will rarely be achieved. This paper describes a procedure developed by the authors using GPS observations combined with a network of precision inclination sensor to provide reliable coordinated points at the top of the worldwide highest-rise building under construction in Dubai.

  • PDF