• Title/Summary/Keyword: settlement monitoring

Search Result 191, Processing Time 0.021 seconds

A Study on the Interdependencies of Payment and Settlement Systems in Korea (우리나라 지급결제시스템의 상호의존성에 관한 연구)

  • Yi, Junesuh;Kang, KyeongHoon
    • KDI Journal of Economic Policy
    • /
    • v.32 no.2
    • /
    • pp.171-216
    • /
    • 2010
  • With the payment and settlement systems becoming more and more complex and interconnected, the issue of their interdependency rises as an important academic issue as well as a policy topic. This study examines causes, forms, and risk management of interdependencies of payment and settlement systems in Korea, and presents their current situation. By way of simulations using BOF-PSS2 developed by the Bank of Finland, we quantify the effects of an operational disruption on the payment and settlement systems so as to figure out the degree of interdependency. As a result, the secondary round effect reaches up to ₩13.6 trillion a day, which amounts to 7.8% of the daily settlement value. Furthermore, if we also consider the amount of direct operational disruption, the volume of operational disruption occupies 22.3% of total value of the daily settlement, evidencing that the interdependencies of the payment and settlement systems in Korea is enormously widespread. The secondary round effects are found to be more severe with security companies rather than with banks, and to be more depended upon when it is perceived rather than it actually happens. In case that we expand the liquidity to include cash holdings and deposits as assets, the secondary round effect dramatically decreases in all types of financial institutions while foreign banks account for more share of all the secondary round effects increases. Based on these results, we suggest various policy tasks and directions to improve the risk management of settlement systems: expansion of off-setting settlements, introduction of a new settlement system for securities transactions, rapid provision of liquidity to financial institutions, more effective monitoring on participant institutions, and intensified information sharing and cooperation among the systems.

  • PDF

Application of Artificial Neural Network with Levenberg-Marquardt Algorithm in Geotechnical Engineering Problem (Levenberg-Marquardt 인공신경망 알고리즘을 이용한 지반공학문제의 적용성 검토)

  • Kim, Young-Su;Lee, Jae-Ho;Seo, In-Shik;Kim, Hyun-Dong;Shin, Ji-Sub;Na, Yun-Young
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.03a
    • /
    • pp.987-997
    • /
    • 2008
  • Successful design, construction and maintenance of geotechnical structure in soft ground and marine clay demands prediction, control, stability estimation and monitoring of settlement with high accuracy. It is important to predict and to estimate the compression index of soil for predicting of ground settlement. Lab. and field tests have been and are indispensable tools to achieve this goal. In this paper, Artificial Neural Networks (ANNs) model with Levenberg-Marquardt Algorithm and field database were used to predict compression index of soil in Korea. Based on soil property database obtained from more than 1800 consolidation tests from soils samples, the ANNs model were proposed in this study to estimate the compression index, using multiple soil properties. The compression index from the proposed ANN models including multiple soil parameters were then compared with those from the existing empirical equations.

  • PDF

Monitoring Land-use Changes by Remote Sensing and GIS Techniques: Case Study of Barind Tract, Bangladesh

  • Sohel, Md. Shawkat Islam;Rana, Md. Parvez;Islam, A.Z.M. Zahedul;Akhter, Sayma
    • Journal of Forest and Environmental Science
    • /
    • v.27 no.2
    • /
    • pp.73-79
    • /
    • 2011
  • The Barind tract is threatened by desertification and undergoing rapid change. In view of this fact it is very much essential to manage this barind tract under proper land-use plan. The present study evaluates the effectiveness of high-resolution satellite data and computer aided GIS techniques in assessing land-use change detection for the period 1990 to 2007 within the study area, which is very much essential to manage this barind tract under proper land-use plan, and for proper land-use plan it is necessary to get reliable information. The present study found five major land-use such as current fallow, current agriculture, settlement, irrigation water and water bodies. From the result, it is found that current fallow and water bodies decrease while settlement and current agriculture increase. Study concludes that as Barind tract is threatened by desertification, decrease of water bodies is not a good sign for the study area.

Efficient Management of Tunnel Construction Informations using ITIS(Intelligent Tunnelling Information System) (ITIS를 활용한 효율적인 터널 정보화 시공 관리)

  • Kim, Chang-Yong;Hong, Sung-Wan;Bae, Gyu-Jin;Kim, Kwang-Teom;Son, Moo-Rak;Han, Byeong-Hyeon
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2004.03b
    • /
    • pp.946-951
    • /
    • 2004
  • ITIS is applied to the several tunnel construction sites in Korea. Tunnel construction properties which are acquired from these sites are transferred to information management server(SQL 2000 server)by client application program in real time. Access permission to DB server depends on the user's roles. Some functions which cannot be embodied in SQL Server are serviced through XML and GMS server is used for spatial data based on GIS part. This system is supposed to give engineers the advantages which are not only easy handling of the program and computerized documentation on every information during construction but also analyzing the acquired data in order to predict the structure of ground and rock mass to be excavated later and show the guideline of construction. Neung-Dong tunnel and Mu-Gua express way tunnel are now under construction and with this system they have 3D visualized map of the geology and tunnel geometry and accumulate database of construction information such as tunnel face mapping results, special notes and pictures of construction and 3D monitoring data, all matters on the stability of rock bolts and shotcrete, and so on. Ground settlement prediction program included in ITIS, based on the artificial neural network(ANN) and supported by GIS technology is applying to the subway tunnel. This prediction tool can make it possible to visualize the ground settlement according to the excavation procedures by contouring the calculated result on 3D GIS map and to assess the damage of buildings in the vicinity of construction site caused by ground settlement.

  • PDF

EPB tunneling in cohesionless soils: A study on Tabriz Metro settlements

  • Rezaei, Amir H.;Shirzehhagh, Mojtaba;Golpasand, Mohammad R. Baghban
    • Geomechanics and Engineering
    • /
    • v.19 no.2
    • /
    • pp.153-165
    • /
    • 2019
  • A case study of monitoring and analysis of surface settlement induced by tunneling of Tabriz metro line 2 (TML2) is presented in this paper. The TML2 single tunnel has been excavated using earth pressure balanced TBM with a cutting-wheel diameter of 9.49 m since 2015. Presented measurements of surface settlements, were collected during the construction of western part of the project (between west depot and S02 station) where the tunnel was being excavated in sand and silt, below the water table and at an average axis depth of about 16 m. Settlement readings were back-analyzed using Gaussian formula, both in longitudinal and transversal directions, in order to estimate volume loss and settlement trough width factor. In addition to settlements, face support and tail grouting pressures were monitored, providing a comprehensive description of the EPB performance. Using the gap model, volume loss prediction was carried out. Also, COB empirical method for determination of the face pressure was employed in order to compare with field monitored data. Likewise, FE simulation was used in various sections employing the code Simulia ABAQUS, to investigate the efficiency of numerical modelling for the estimating of the tunneling induced-surface settlements under such a geotechnical condition. In this regard, the main aspects of a mechanized excavation were simulated. For the studied sections, numerical simulation is not capable of reproducing the high values of in-situ-measured surface settlements, applying Mohr-Coulomb constitutive law for soil. Based on results, for the mentioned case study, the range of estimated volume loss mostly varies from 0.2% to 0.7%, having an average value of 0.45%.

Experimental and numerical study of Persian brick masonry barrel vaults under probable structural hazards

  • Saeid Sinaei;Esmaeel Izadi Zaman Abadi;Seyed Jalil Hoseini
    • Structural Engineering and Mechanics
    • /
    • v.87 no.4
    • /
    • pp.317-332
    • /
    • 2023
  • Understanding and analysing the behaviour and response of historical structures in the face of climate changes and environmental conditions is of utmost significance for their preservation. There are several structural hazards associated with climate and hydrology changes in the region, including the settlement of piers, the rotation of piers, and temperature changes. The present study investigates the experimental and numerical structural behaviour of skewed and non-skewed Persian brick masonry barrel vaults under various conditions. The external loading conditions included pier rotation in five modes, settlement, and temperature variations in four states. Initially, the experiments extracted the mechanical properties of the scaled materials. Then, three semi-circular brick barrel vaults were tested with gravitational loads. The outcomes were used to develop and validate the finite element model. Following the development of the finite element model, numerical and parametric studies were conducted on the effect of the aforementioned structural hazards on the response of brick masonry barrel vaults with various Persian geometries (semi-circular, drop pointed, and four-centred), angles of skew (0, 15, 30, and 45 degrees), and dimensional ratios. According to the findings, the fragility of masonry materials makes historical structures susceptible to failure under different loading. A brick barrel vault fails in the presence of minor rotation and settlement of the piers. The four-centred geometric shape has the lowest performance among the seven Persian geometries; therefore, its health monitoring and retrofitting should be prioritised. In Isfahan, Iran, temperature variations, particularly during the warm seasons, cause critical conditions in such structures.

Influence characteristics of isolation piles on deformation of existing shallow foundation buildings under deep excavation

  • Liu, Xinrong;Liu, Peng;Zhou, Xiaohan;Wang, Linfeng;Zhong, Zuliang;Lou, Xihui;Chen, Tao;Zhang, Jilu
    • Geomechanics and Engineering
    • /
    • v.31 no.1
    • /
    • pp.1-14
    • /
    • 2022
  • Urban deep excavation will affect greatly on the deformation of adjacent existing buildings, especially those with shallow foundations. Isolation piles has been widely used in engineering to control the deformation of buildings adjacent to the excavation, but its applicability is still controversial. Based on a typical engineering, numerical calculation models were established and verified through monitoring data to study the influence characteristics of isolation piles on the deformation of existing shallow foundation buildings. Results reveal that adjacent buildings will increase building settlement δv and the deformation of diaphragm walls δh, while the isolation piles can effectively decrease these. The surface settlement curve is changed from "groove" type to "double groove" type. Sufficiently long isolation pile can effectively decrease δv, while short isolation piles will lead to a negative effect. When the building is within the range of the maximum settlement location P, maximum building rotation θm will increase with the pile length L and the relative position between isolation pile and building d/D increase (d is the distance between piles and diaphragm walls, D is the distance between buildings and diaphragm walls), instead, θm will decrease for buildings outside the location P, and the optimum was obtained when d/D=0.7.

In-Situ Application of the Steel Pipe jacking with Grouting (그라우팅을 병행한 강관추진공법의 현장 적용성 연구)

  • Jung, Min-Hyung;Lim, Ho-Jung;Shin, Chang-Sub;Lee, Song
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.13 no.1 s.53
    • /
    • pp.152-160
    • /
    • 2009
  • The pipe jacking method which is a non-excavation method is frequently used due to constructability and economical efficiency in a medium or small-sized pipeline construction. However, jacking process of the method still causes problems that the base ground is disturbed and loosen. These lead to surface settlement, strength decrease and leakage of water. Therefore, this study presents in-situ application of the steel pipe jacking with grouting, and it is that jacking and grouting are progressed simultaneously. To verify this, the steel pipe jacking with grouting and the existing steel pipe jacking have been constructed on the same ground condition. It has been proved that the steel pipe jacking with grouting is in-situ applicable according to results of monitoring surface settlement, in-situ density, GPR geophysical prospecting and large scale direct shear test.

A Study on Construction and Applicability on of Smart Pole Measuring System for Monitoring Steep Slope Sites (급경사지 모니터링을 위한 스마트폴 계측시스템 구축 및 적용성 연구)

  • Lee, Jin-Duk;Chang, Ki-Tae;Bhang, Kon-Joon
    • Journal of Korean Society of Disaster and Security
    • /
    • v.7 no.2
    • /
    • pp.1-8
    • /
    • 2014
  • Smart Pole Measurement System was constructed with not only the core sensors of a GNSS receiver, a TRS sensor and a soil moisture sensor but supplementary installation of power supply and radio communication for monitoring steep slope sites. Also a data processing software for displacement extraction and visualization was developed. Smart Pole Measurement sensor is composed of a GNSS antenna at the top of the pole, a TRS sensor and a gyro sensor vertical below right of the antenna and a soil moisture sensor at the bottom of the pole. The sensor combination extracts not only ground combination in real time but transltion, slide, settlement and soil moisture content. This measuring/monitoring system which cosists of data receiving part, data collection/transfer part and data processing part was built to exercise their functions and then test measuring/monitoring was conducted by introducing artificial displacement and the results were analyzed to evaluate field applicability.

Proposal of Equations related to Settlement and Lateral Movement According to Embankment on Marine Sedimentary Ground (해성퇴적지반에서 성토로 인한 침하량과 측방유동량 산정식 제안)

  • Kim, Kyeong-Su;Chung, Dae-Seouk;Lee, Jong-Gil
    • The Journal of Engineering Geology
    • /
    • v.20 no.2
    • /
    • pp.191-202
    • /
    • 2010
  • In this study, the relationship between the settlements and the horizontal displacements according to embankment was analyzed at the marine sedimentary grounds for preparation of a site, and then the empirical equations of both the settlement and the horizontal displacement considering the embankment load and the thickness were proposed. To do this, the field and laboratory tests were performed at the improvement section where the pre-loading method was applied, and the field monitoring was performed using various sensors. Based on the results of the tests and monitoring, the ground deposits, soil characteristics and engineering properties were analyzed and the settlements and lateral movements were estimated by the Regression analysis. The ground deposits from the ground surface were composed of reclaimed soils, sedimentary soils and based rocks. The thickness of clay in the sedimentary soils layer was ranged from 3.9 m to 44.5 m. The embankment heights to improve the ground during pre-loading were constructed from 4.7 m to 7.8 m in each section. The settlements during embankment were ranged from 0.959 m to 2.217 m and the lateral movements were ranged from 0.048 m to 0.313 m. As the result of regression analysis, the equations of settlements and horizontal displacements according to embankments may be proposed as $s=0.02h^2+0.11h$ and ${\delta}=0.01e^{0.37h}$, respectively. The proposed empirical equations of the settlements and the horizontal displacements according to embankment on the marine sedimentary ground may be applied to the site where has a similar condition of study area.