Settlement of Fine Recycled-concrete Aggregates Foundation under Sewage Conduit System (폐콘크리트 재생잔골재의 하수관거 모래기초 적용에 따른 침하 거동)

  • Oh, Je-Ill;Ahn, Nam-Kyu;Lee, Ju-Young
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.27 no.5
    • /
    • pp.486-490
    • /
    • 2005
  • Fine recycled-concrete aggregates(RCAs) instead of natural sand were tested for a foundation material under sewage conduit system, which was evaluated based on foundation settlement at various conditions. To obtain this applicability of RCAs, the settlement behavior was simulated with FLAC program based on the difference of material properties, and immediate settlement behaviors and the change of material properties under the simulated drainage conditions also tested at the various loading conditions in the laboratory. Finally, large-scale settlement test in the field was conducted to prove the above feasibilities. Subsequently, the amount of settlement from the FLAC simulation was calculated under $5.0{\times}10^{-6}\;m$ and the extent of settlement and property changes (porosity, permeability and waster absorption) was not noticeable from the laboratory experiments. Also, settlement monitoring from the field experiment showed the consistent results with laboratory experiments except for the consolidation settlement(=5 mm) of the round below the foundation. In summary, adopting fine RCAs as a foundation material for sewage conduit system was resonable based of geotechnical point of view.

PLAXIS 3D simulation, FLAC3D analysis and in situ monitoring of Excavation stability

  • Lei, Zhou;Zahra, Jalalichi;Vahab, Sarfarazi;Hadi, Haeri;Parviz, Moarefvand;Mohammad Fatehi, Marji;Shahin, Fattahi
    • Structural Engineering and Mechanics
    • /
    • v.84 no.6
    • /
    • pp.743-765
    • /
    • 2022
  • Near-surface excavations may cause the tilting and destruction of the adjacent superstructures in big cities. The stability of a huge excavation and its nearby superstructures was studied in this paper. Some test instruments monitored the deformation and loads at the designed location. Then the numerical models of the excavation were made in FLAC3D (a three-dimensional finite difference code) and Plaxis-3D (a three-dimensional finite element code). The effects of different supporting and reinforcement tools such as nails, piles, and shotcretes on the stability and bearing capacity of the foundation were analyzed through different numerical models. The numerically approximated results were compared with the corresponding in-field monitored results and reasonable compatibility was obtained. It was concluded that the displacement in excavation and the settlement of the nearby superstructure increases gradually as the depth of excavation rises. The effects of support and reinforcements were also observed and modeled in this study. The settlement of the structure gradually decreased as the supports were installed. These analyses showed that the pile significantly increased the bearing capacity and decreased the settlement of the superstructure. As a whole, the monitoring and numerical simulation results were in good consistency with one another in this practically important project.

The Settlement Characteristics of Incheon Unsanitary Solid Waste Landfill (인천지역 비위생 매립지반의 침하특성 연구)

  • Cho, Seok-Ho;Lim, Ju-Hyun;Kim, Hak-Moon
    • Journal of the Korean Geotechnical Society
    • /
    • v.24 no.7
    • /
    • pp.37-42
    • /
    • 2008
  • This paper estimates the long-term settlement of Incheon unsanitary solid waste landfill, which is 20 years old. The unsanitary solid waste landfill was subjected to pre-loading system over a period of 1 year, and 300 settlement monitoring provided the long term settlement data. This landfill contains relatively small amount of organic component, and therefore the initial stage of settlement was very small. The existing settlement models were examineed by comparing the observed behaviors of this site, and also they were used to predict the long-term settlement. Power Creep Law (PCL) model showed good agreement with the measured settlement obtained from the initial stage of the measurement, but other models showed satisfactory agreements after $50{\sim}70$ days of measurement.

Compaction Management of Fill Materials for Concrete Faced Rockfill Dam Using Standard Void Ratio (표준간극비를 이용한 콘크리트 표면차수벽형 석괴댐 축조재료의 다짐 관리)

  • Kim Yong-Seong
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.48 no.4
    • /
    • pp.59-66
    • /
    • 2006
  • In this study, construction modulus, void ratio and settlement characteristics of 38 CFRD in domestic and foreign countries were investigated from monitoring data. The effect of field dry density and void ratio to dam body was analyzed. The standard void ratio of CFRD that can be easily used by dam designers and field engineers was proposed from the monitoring data. It was confirmed that we can get the degree of compaction needed for reasonable compaction of dam body by calculating the field dry density from inverse operation of the standard void ratio. It was thought that the void ratio of CFRD depends on shape coefficient and in case of a high shape coefficient, the void ratio was high with its void ratio 0.17 -0.38.

Measurements and Analysis of Deformation States in Roadbed in Gyeongbu High Speed Railway (경부고속철도 토공부에 대한 변형상태 계측 및 분석)

  • Jin, Nam-Hee;Kim, Nam-Hyuk;Shim, Hyun-Woo
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.1542-1549
    • /
    • 2009
  • The function of subgrade in the railway is to support track load on the subgrade as well as train load. Unlike the traditional railway, the uppermost subgrade layer in the Gyeongbu high speed railway was constructed as the reinforced road bed. The reinforced road bed comprises sub-ballast in the upper part and grade ballast in the lower part. The filling material such as soil and rocks in the subgrade can be settled by consolidation of original ground, compression due to self weight, plastic displacement due to train operation, and unequal settlement due to embankment material or improper compaction, therefore many efforts have been given for sufficient compaction and use of proper filling materials in the construction stage. The purpose of this study is to investigate the deformation state of subgrade in the Gyeongbu high speed railway. The investigation on the subgrade settlement was performed by choosing representative sections suspected to be settled based on the previous GPR test results and track maintenance history, measuring the settlement for some time period after installing settlement measuring instruments on and under the reinforced road bed. and analyzing the long-term subgrade settlement data from monitoring system which was installed at the construction stage of the high speed railway.

  • PDF

A Basic Study for Forest Landscape Fragmentation Monitoring (산지경관 파편화 모니터링을 위한 기초연구)

  • An, Seung Man
    • Journal of Korean Society of Forest Science
    • /
    • v.108 no.3
    • /
    • pp.454-467
    • /
    • 2019
  • This study proposed a forest landscape (patch) fragmentation monitoring framework using a cadastral forest land dataset and validated the feasibility of such monitoring. The following results were found. First, the forest landscape has fragmented too quickly. Hence, immediate national monitoring and management are required. Second, forest landscape monitoring should be linked to other survey frameworks. Horizontal fragmentation monitoring based on the forest landscape (geographic information system [GIS] polygons) is insufficient to determine ecological processes. Third, precautionary principle regulation to link forest landscape fragmentation monitoring to assessment systems such as environmental impact analysis or disaster impact analysis should follow.

Pipeline deformation caused by double curved shield tunnel in soil-rock composite stratum

  • Ning Jiao;Xing Wan;Jianwen Ding;Sai Zhang;Jinyu Liu
    • Geomechanics and Engineering
    • /
    • v.36 no.2
    • /
    • pp.131-143
    • /
    • 2024
  • Shield tunneling construction commonly crosses underground pipelines in urban areas, resulting in soil loss and followed deformation of grounds and pipelines nearby, which may threaten the safe operation of shield tunneling. This paper investigated the pipeline deformation caused by double curved shield tunnels in soil-rock composite stratum in Nanjing, China. The stratum settlement equation was modified to consider the double shield tunneling. Moreover, a three dimensional finite element model was established to explore the effects of hard-layer ratio, tunnel curvature radius, pipeline buried depth and other influencing factors. The results indicate the subsequent shield tunnel would cause secondary disturbance to the soil around the preceding tunnel, resulting in increased pipeline and ground surface settlement above the preceding tunnel. The settlement and stress of the pipeline increased gradually as buried depth of the pipeline increased or the hard-layer ratio (the ratio of hard-rock layer thickness to shield tunnel diameter within the range of the tunnel face) decreased. The modified settlement calculation equation was consistent with the measured data, which can be applied to the settlement calculation of ground surface and pipeline settlement. The modified coefficients a and b ranged from 0.45 to 0.95 and 0.90 to 1.25, respectively. Moreover, the hard-layer ratio had the most significant influence on the pipeline settlement, but the tunnel curvature radius and the included angle between pipeline and tunnel axis played a dominant role in the scope of the pipeline settlement deformation.

Prediction of Preceding Displacement of a Soil-Tunnel by Displacement Monitoring using Horizontal Inclinometer (수평경사계를 이용한 토사터널의 선행변위 예측)

  • Kim, Chu-Hwa;Chae, Young-Su;Park, Yeon-Jun
    • Tunnel and Underground Space
    • /
    • v.18 no.5
    • /
    • pp.355-365
    • /
    • 2008
  • Displacement caused by tunneling is difficult to predict since it is affected by many factors such as ground condition, excavation method and supplementary method of reinforcement. In this study, horizontal inclinometer was employed to monitor ground settlements above a tunnel face before and after the excavation. Monitoring results were analyzed to predict the preceding displacement and settlement of the surface structures. The result of the analysis can be used to establish a proper counter measure which keeps the serviceability of the surface structures. Based on the analysis of the monitoring result, ground properties of the site were deduced and the influence of the tunnel excavation on the settlement of the foundation above the tunnel is analyzed.

Comparison of measured values and numerical analysis values for estimating smart tunnel based groundwater levels around vertical shaft excavation (수직구 굴착시 스마트 터널기반 지하수위 현장계측과 수치해석 비교 연구)

  • Donghyuk Lee;Sangho Jung
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.26 no.2
    • /
    • pp.153-167
    • /
    • 2024
  • Recently the ground settlement has been increasing in urban area according to development. And, this may attribute a groundwater level drawdown. This study presents an analysis of groundwater level drawdown for circular vertical shaft excavation of 「◯◯◯◯ double track railway build transfer operate project」. And, in-situ monitoring data and numerical analysis were compared. So, if we examine the groundwater level drawdown in design, ground conditions should be applied so that the site situation can be reflected. And, groundwater level should be considered a seasonal measurement in order to apply the appropriate groundwater level. It was confirmed a similar predicted value to groundwater level drawdown of in-situ monitoring data.

Analysis of Sewer Pipe Defect and Ground Subsidence Risk by Using CCTV and GPR Monitering Results (CCTV 및 GPR을 이용한 하수관로 결함 및 지반함몰 위험성 평가)

  • Lee, Dae-Young
    • Journal of the Korean Geosynthetics Society
    • /
    • v.17 no.3
    • /
    • pp.47-55
    • /
    • 2018
  • Recently, increasing number of urban ground subsidence occurrences has been identified. This situation is mainly due to the increased number of underground cavities. This study is intended to develop the method that prevents ground settlement caused by deteriorated or damaged sewers, which are the main cause of land subsidence. To that end, GPR exploration was conducted using CCTV monitoring of deteriorated sewer at the location with high settlement potential. Through such CCTV monitoring and GPR investigation, abnormal ground behavior was monitored at the site where sewer was damaged, joint was cracked and soil was deposited. According to site investigation in this study, evaluation method using correlation analysis of CCTV monitoring and GPR investigation results is expected to prevent ground settlement attributable to damaged sewer.