• Title/Summary/Keyword: set construction

Search Result 1,978, Processing Time 0.027 seconds

Slacks 구성을 위한 인체계측 -서울특별시의 여대생을 중심으로- (A Study on Body Measurement for Slacks Construction (Mainly with women's College Student in Seoul City Area))

  • 김경자
    • 대한가정학회지
    • /
    • 제17권2호
    • /
    • pp.1-8
    • /
    • 1979
  • Recently, the Korean women has been steadily growing in number of wearing slacks , therefore the measurement data on lower part of body for slacks pattern construction have become needed. Thus, in order to obtain the measurement data, 304 of sophomore and junior classes form universities and colleges in Seoul city area were selected on purposed and , set to the object of study. In the course of measurement , thirteen items on lower part of body which is the basis of slacks pattern construction were measured, and then average balue, standard deviation and the mutual correlation were obtained.

  • PDF

Exact Activity Overlapping Method for Time-cost Tradeoff

  • Gwak, Han-Seong;Lee, Dong-Eun
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.109-110
    • /
    • 2015
  • This paper presents a computational method that identifies an exact set of optimal overlap rates between critical activities to meet job site specific needs by using rework cost-slope. The procedures to compute the exact solution are provided in peudocode algorithm. The method is coded into Exact Concurrent Construction Scheduling system that allows practitioners to make more informed decision in accordance with the site-specific condition involved in the overlapping of critical activities. Test cases verify the validity of the computational method and the usability of the system.

  • PDF

건설산업의 BIM 적용능력 제고를 위한 BIM 프로세스 개발에 관한 연구 (A Study on the Development of the BIM Process for Improvement of the BIM Application Ability of the Construction Industry)

  • 김지원;이민철;최정민;옥종호
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.738-743
    • /
    • 2008
  • 최근들어 BIM 기술은 건설프로젝트의 전 생애주기동안 생산성 향상을 위하여 활용되고 있는 바, 건설의 각 분야에서 적용함에 있어 프로젝트 별 (간섭체크용, 모델해석용, 공정 및 물량산출용, 공사현장용, 협업용 등) BIM 프로세스의 정립은 필수적 요소이다. 하지만 국내에서 프로젝트 별 BIM 프로세스가 정립되어 있는 사례 및 해당 연구는 아직 마련되어 있지 않은 실정이다. 본 연구에서는 건설사업 초기단계에서의 BIM 어플리케이션 설정 방법, BIM 팀구성 방법, 패밀리설정 방법, 모델링방법 연구를 통하여 BIM 프로세스 구축을 제안하고, Pilot Study 모델을 통한 기초설정 및 모델링 작업, 물량검토, 중립적인 포맷방식인 IFC $2{\times}3$ 버전을 활용한 정보교환 등을 실시하여 정립된 BIM 프로세스의 적용능력을 검토하여 국내 BIM 가이드라인 구축의 초석을 마련하고자한다.

  • PDF

농촌지역 혼합건설폐기물의 중·소규모 배출현장용 이동식 분리선별기 개발을 위한 기초연구 (A Basic Study on the Mobile Separator and Sorter Development of Small and Medium-sized Discharge Site's Mixed Construction Waste in Rural Area)

  • 김병윤;박지선
    • 한국농촌건축학회논문집
    • /
    • 제21권3호
    • /
    • pp.17-24
    • /
    • 2019
  • This study aimed to develop a mobile separating and sorting device for discharge sites to separate and sort mixed construction waste generated in small and medium scale in small provincial cities into inorganic materials and combustible materials. The study results can be summarized as follows: 1) As a result of analyzing the existing domestic technology for the separating and sorting mixed construction waste, a device sorting the waste by fusing the vibration screen, disc screen, air blowing methods and the separating and sorting the combustible waste is applied in Korea. 2) In foreign countries, the air blowing, screen, gravity sorters are used for separating and sorting combustible waste in the same way as in Korea. Especially German T Company suggests a construction waste separating and sorting system using an optical sorter. 3) As for the test device for separating and sorting mixed construction waste to be buried in landfill, the processing capacity was set as 16 tons per day. 4) For separating and sorting inorganic materials by granularity, this study set a trommel with two types of diameter as a basic. To operate the mobile all-in-one system, the device is designed to locate a conveyor, a combustible waste conveying device, inside of the trommel. 5) The device is designed in a mobile mode under the concept of primary separating and sorting device, and it can be transported using a 2.5-ton truck minimum. The diameter and length of the trommel are designed to be within 1500mm and 3000mm, respectively. In a further study, an optimized separating and sorting technology is planned to be presented through an experimental study for processing efficiency analysis at the mixed construction waste site by manufacturing the pilot experiment facility reflecting the design elements in the result of this study.

Key success factors for implementing modular integrated construction projects - A literature mining approach

  • Wuni, Ibrahim Yahaya;Shen, Geoffrey Qiping
    • 국제학술발표논문집
    • /
    • The 8th International Conference on Construction Engineering and Project Management
    • /
    • pp.343-352
    • /
    • 2020
  • Modular integrated construction (MiC) is an innovative construction method where components of a building are manufactured in an offsite factory, trucked to the job site in sections, set in place with cranes, and assembled together to form a whole building. Where circumstances merit, favorable conditions exist and implemented effectively; MiC improves project performance. However, several key factors need to converge during implementation to realize the full benefits of MiC. Thus, a thorough understanding of the factors which are critical to the success of MiC projects is imperative. Drawing on a systematic review of 47 empirical studies, this research identified 25 key success factors (KSFs) for MiC projects. Of these, the five topmost cited KSFs for MiC projects include effective working collaboration and communication among project participants; standardization, optimization, automation and benchmarking of best practices; effective supply chain management; early design freeze and completion; and efficient procurement method and contracting. The study further proposed a conceptual model of the KSFs, highlighting the interdependences of people, processes, and technology-related KSFs for the effective accomplishment of MiC projects. The set of KSFs is practically relevant as they constitute a checklist of items for management to address and deal with during the planning and execution of MiC projects. They also provide a useful basis for future empirical studies tailored towards measuring the performance and success of MiC projects. MiC project participants and stakeholders will find this research useful in reducing failure risks and achieving more desired performance outcomes. One potential impact of the study is that it may inform, guide, and improve the successful implementation of MiC projects in the construction industry. However, the rigor of the analysis and relative importance ranking of the KSFs were limited due to the absence of data.

  • PDF

Real-time prediction on the slurry concentration of cutter suction dredgers using an ensemble learning algorithm

  • Han, Shuai;Li, Mingchao;Li, Heng;Tian, Huijing;Qin, Liang;Li, Jinfeng
    • 국제학술발표논문집
    • /
    • The 8th International Conference on Construction Engineering and Project Management
    • /
    • pp.463-481
    • /
    • 2020
  • Cutter suction dredgers (CSDs) are widely used in various dredging constructions such as channel excavation, wharf construction, and reef construction. During a CSD construction, the main operation is to control the swing speed of cutter to keep the slurry concentration in a proper range. However, the slurry concentration cannot be monitored in real-time, i.e., there is a "time-lag effect" in the log of slurry concentration, making it difficult for operators to make the optimal decision on controlling. Concerning this issue, a solution scheme that using real-time monitored indicators to predict current slurry concentration is proposed in this research. The characteristics of the CSD monitoring data are first studied, and a set of preprocessing methods are presented. Then we put forward the concept of "index class" to select the important indices. Finally, an ensemble learning algorithm is set up to fit the relationship between the slurry concentration and the indices of the index classes. In the experiment, log data over seven days of a practical dredging construction is collected. For comparison, the Deep Neural Network (DNN), Long Short Time Memory (LSTM), Support Vector Machine (SVM), Random Forest (RF), Gradient Boosting Decision Tree (GBDT), and the Bayesian Ridge algorithm are tried. The results show that our method has the best performance with an R2 of 0.886 and a mean square error (MSE) of 5.538. This research provides an effective way for real-time predicting the slurry concentration of CSDs and can help to improve the stationarity and production efficiency of dredging construction.

  • PDF

MOVEMENT CONTROL OF HIGH-RISE BUILDINGS DURING CONSTRUCTION

  • Taehun Ha;Sungho Lee;Bohwan Oh
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.46-51
    • /
    • 2011
  • High-rise buildings are widely being constructed in the Middle-East, South-East, and East Asia. These buildings are usually willing to stand for the landmark of the region and, therefore, exhibit some extraordinary features such as super-tall height, elevation set-backs, overhangs, or free-form exterior surface, all of which makes the construction difficult, complex, and even unsafe at some construction stages. In addition to the elaborately planned construction sequence, prediction and monitoring of building's movement during construction and after completion are required for precise and safe construction. This is often called the Building Movement Control during construction. This study describes Building Movement Control of the KLCC Tower, a 58-story office building currently being built right next to the famous PETRONAS Twin Towers. The main items of the Building Movement Control for the KLCC Tower are axial shortening and verticality. Preliminary prediction of these items are already carried out by the structural design team but more accurate prediction based on construction stage analysis and combined with time-dependent material testing, field monitoring, and site survey is done by the main contractor. As of September 2010, the Tower is under construction at level 30, where the plan abruptly changes from rectangle to triangle. Findings and troubleshooting until the current construction stage are explained in detail and implementations are suggested for future applications.

  • PDF

점 집합의 보로노이 다이어그램을 이용한 원 집합의 보로노이 다이어그램의 계산: I. 위상학적 측면 (The Computation of the Voronoi Diagram of a Circle Set Using the Voronoi Diagram of a Point Set: I. Topology)

  • 김동욱;김덕수;조동수
    • 한국CDE학회논문집
    • /
    • 제6권1호
    • /
    • pp.24-30
    • /
    • 2001
  • An efficient and robust algorithm to compute the exact Voronoi diagram of a circle set is presented. The circles are located in a two dimensional Euclidean space, the radii of the circles are non-negative and not necessarily equal, and the circles are allowed to intersect each other. The idea of the algorithm is to use the topology of the point set Voronoi diagram as a seed so that the correct topology of the circle set Voronoi diagram can be obtained through a number of edge flipping operations. Then, the geometries of the Voronoi edges of the circle set Voronoi diagram are computed. In particular, this paper discusses the topological aspect of the algorithm, and the following paper discusses the geometrical aspect. The main advantages of the proposed algorithm are in its robustness, speed, and the simplicity in its concept as well as implementation. Since the algorithm is based on the result of the point set Voronoi diagram and the flipping operation is the only topological operation, the algorithm is always as stable as the Voronoi diagram construction algorithm of a point set.

  • PDF

표준품셈 관부설 및 접합공사 품 개정 요인 분석 (Analysis on the Factor of Revision of Pipe Laying Down Material and Connection Work Material)

  • 오재훈;안방율
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 춘계 학술논문 발표대회
    • /
    • pp.302-303
    • /
    • 2018
  • This study analyzed the major revision factors and revision contents for 'Construction-Standard-Production-Rate for Construction Works in 2018. Part 16. Pipe Laying Down and Connection" which was revised by the construction expense estimation standard's middle and long-term plans. The main reasons for the revision was analyzed to be unclear construction scope, limitations in applicable pipe material based on the facility type, labor force mainly composed of ordinary workers, limitations of labor force, and incomplete appropriation standard for the tool rent fee and equipment expenses. Through revision of factors, common items were newly established, organization was revised, the labor force was mainly composed of the technicians, and basis for appropriation of equipment expenses was arranged. In addition, through periodic revision, the appropriation standard for bend and special pipes was set. Consequently, more practical construction cost estimate standard is arranged through revision.

  • PDF

THE FEATURE CONSIDERATION AND PLAN FOR DEFINITION SYSTEMATIZATION OF CLIENT'S REQUIREMENT

  • Su-Kyung Cho;Chang-Hyun Shin;Jea-Sauk Lee;Jae-Youl Chun
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.635-641
    • /
    • 2007
  • The construction starts its business by receiving the order from client and owner. The client presents requirements and related information so that the desired result can come out while the designer and the builder express and implement the building according to set objectives and goals of project based on information on project environment and presented requirements. Because the construction project makes decisions on such objectives at its early stage and previous stage becomes the situation for decision making of next stage as the computation to implement decisions get performed. Accordingly, this study has mentioned necessity of requirement analysis and systematization of construction project, analyzed the work of construction's early stage and resented a plan for objective of construction project requirement definition model in which requirements engineering has been applied and using it while making decisions on designing.

  • PDF