• Title/Summary/Keyword: sequence-dependent setup times

Search Result 28, Processing Time 0.024 seconds

A Development of Heuristic Algorithms for the Multi-stage Manufacturing Systems with Sequence Dependent Setup Times (준비시간이 종속적인 n/M 스케쥴링 문제의 휴리스틱 알고리듬(I))

  • Choe, Seong-Un;No, In-Gyu
    • Journal of Korean Society for Quality Management
    • /
    • v.17 no.1
    • /
    • pp.35-47
    • /
    • 1989
  • This paper is concerned with a development and evaluation of heuristic algorithms for the n-job, M-stage flowshop with sequence dependent setup times. Three heuristic algorithms, CAIDAN, DANNEN and PETROV, are proposed. The makespan is taken as a performance measure for the algorithms. The experiment for each algorithm is designed for a $4{\times}3{\times}3$ factorial design with 360 observations. The experimental factors are PS (ratio of processing times to setup times), M (number of machines), and N (number of jobs). The makespan of the proposed heuristic algorithms is compared with the optimal makespan obtained by the complete enumeration method. The result of comparision of performance measure is called a relative error. The mean relative errors of CAIDAN, DANNEN and PETROV algorithms are 4.488%. 6.712% and 7.282%, respectively. The computational results are analysed using SPSS. The experimental results show that the three factors are statistically signiticant at 5% level.

  • PDF

Sequencing in Mixed Model Assembly Lines with Setup Time : A Tabu Search Approach (준비시간이 있는 혼합모델 조립라인의 제품투입순서 결정 : Tabu Search 기법 적용)

  • 김여근;현철주
    • Korean Management Science Review
    • /
    • v.13 no.1
    • /
    • pp.13-27
    • /
    • 1996
  • This paper considers the sequencing problem in mixed model assembly lines with hybrid workstation types and sequence-dependent setup times. Computation time is often a critical factor in choosing a method of determining the sequence. We develop a mathematical formulation of the problem to minimize the overall length of a line, and present a tabu search technique which can provide a near optimal solution in real time. The proposed technique is compared with a genetic algorithm and a branch-and-bound method. Experimental results are reported to demonstrate the efficiency of the technique.

  • PDF

A Cell Formation Model For Manufacturing System with Sequence Dependence (가공순서에 종속적인 제조시스템을 위한 군형성모형)

  • 홍상우
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.22 no.49
    • /
    • pp.59-65
    • /
    • 1999
  • This paper considers the cell formation in a manufacturing environment where the setup times and costs are significantly dependent on the sequence. The trade-off between saving on the setup costs and additional investment on new machines is considered for determining the economic number of cells. Accordingly, This paper develops a mixed integer program and mentions a variety of manufacturing situations where this model can be useful. This paper also includes an illustrative example.

  • PDF

A Comparative Study of Two-phase Heuristic Approaches to General Job Shop Scheduling Problem

  • Sun, Ji Ung
    • Industrial Engineering and Management Systems
    • /
    • v.7 no.2
    • /
    • pp.84-92
    • /
    • 2008
  • Scheduling is one of the most important issues in the planning and operation of production systems. This paper investigates a general job shop scheduling problem with reentrant work flows and sequence dependent setup times. The disjunctive graph representation is used to capture the interactions between machines in job shop. Based on this representation, four two-phase heuristic procedures are proposed to obtain near optimal solutions for this problem. The obtained solutions in the first phase are substantially improved by reversing the direction of some critical disjunctive arcs of the graph in the second phase. A comparative study is conducted to examine the performance of these proposed algorithms.

Common Due-Date Assignment and Scheduling with Sequence-Dependent Setup Times: a Case Study on a Paper Remanufacturing System

  • Kim, Jun-Gyu;Kim, Ji-Su;Lee, Dong-Ho
    • Management Science and Financial Engineering
    • /
    • v.18 no.1
    • /
    • pp.1-12
    • /
    • 2012
  • In this paper, we report a case study on the common due-date assignment and scheduling problem in a paper remanufacturing system that produces corrugated cardboards using collected waste papers for a given set of orders under the make-to-order (MTO) environment. Since the system produces corrugated cardboards in an integrated process and has sequence-dependent setups, the problem considered here can be regarded as common due-date assignment and sequencing on a single machine with sequence-dependent setup times. The objective is to minimize the sum of the penalties associated with due-date assignment, earliness, and tardiness. In the study, the earliness and tardiness penalties were obtained from inventory holding and backorder costs, respectively. To solve the problem, we adopted two types of algorithms: (a) branch and bound algorithm that gives the optimal solutions; and (b) heuristic algorithms. Computational experiments were done on the data generated from the case and the results show that both types of algorithms work well for the case data. In particular, the branch and bound algorithm gave the optimal solutions quickly. However, it is recommended to use the heuristic algorithms for large-sized instances, especially when the solution time is very critical.

A Genetic Algorithm for Scheduling Sequence-Dependant Jobs on Parallel Identical Machines (병렬의 동일기계에서 처리되는 순서의존적인 작업들의 스케쥴링을 위한 유전알고리즘)

  • Lee, Moon-Kyu;Lee, Seung-Joo
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.25 no.3
    • /
    • pp.360-368
    • /
    • 1999
  • We consider the problem of scheduling n jobs with sequence-dependent processing times on a set of parallel-identical machines. The processing time of each job consists of a pure processing time and a sequence-dependent setup time. The objective is to maximize the total remaining machine available time which can be used for other tasks. For the problem, a hybrid genetic algorithm is proposed. The algorithm combines a genetic algorithm for global search and a heuristic for local optimization to improve the speed of evolution convergence. The genetic operators are developed such that parallel machines can be handled in an efficient and effective way. For local optimization, the adjacent pairwise interchange method is used. The proposed hybrid genetic algorithm is compared with two heuristics, the nearest setup time method and the maximum penalty method. Computational results for a series of randomly generated problems demonstrate that the proposed algorithm outperforms the two heuristics.

  • PDF

Two-Echelon Production-Inventory System with Sequence Dependent Setup Costs (생산준비 비용이 생산순서에 종속적인 경우의 2단계 생산-재고 시스템)

  • Moon, Dug-Hee;Hwang, Hark
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.19 no.2
    • /
    • pp.65-74
    • /
    • 1993
  • In this paper, a two-echelon production-inventory model is developed which integrates the production scheduling problem of the multi-products produced on a single facility and the inventory problem of the related raw materials. The setup costs of the final products are assumed to be dependent on the production sequence. The aim is to determine simultaneously the production cycle time and the production sequence of the final products, and the procurement cycle times of the raw materials. For the model developed, a solution algorithm is suggested and illustrated with a numerical example. And the result is compared with those obtained by two separate subproblems.

  • PDF

Dynamic Programming Algorithms for Scheduling Jobs with Sequence-Dependent Processing Times (순서 의존적인 작업시간을 갖는 작업들의 스케쥴링을 위한 동적계획법)

  • Lee, Moon-Kyu;Lee, Seung-Joo
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.24 no.3
    • /
    • pp.431-446
    • /
    • 1998
  • In this paper, we consider the problem of scheduling n jobs with sequence-dependent processing times on a set of parallel-identical machines. The processing time of each job consists of a pure processing time and a sequence-dependent setup time. The objective is to maximize the total remaining machine available time which can be used for other tasks. For the problem, we first propose a dynamic programming(DP) algorithm for sequencing jobs processed on a single machine. The algorithm is then extended to handle jobs on parallel-identical machines. Finally, we developed an improved version of the algorithm which generates optimal solutions using much smaller amount of memory space and computing time. Computational results are provided to illustrate the performance of the DP algorithms.

  • PDF

Multi-Stage Group Scheduling with Dependent Setup Time (종속적(從屬的)인 준비시간을 갖는 다단계공정(多段階工程)에서의 그룹스케듈링 해법(解法))

  • Song, Yeong-U;No, In-Gyu;Kim, Man-Sik
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.11 no.2
    • /
    • pp.75-85
    • /
    • 1985
  • The application of GT results in the mass production effect to multi-product, small lot-sized production. Group scheduling, which is operations scheduling based on the GT concept, is analyzed in a multistage manufacturing system. But the research has been limited in independent setup time models. A heuristic algorithm has been developed to minimize the mean flow time when setup times are dependent to sequence of group in multistage. For evaluation of the heuristic algorithm, the solution of heuristic algorithm is compared with that of random scheduling. The result of comparison indicates that the proposed heuristic algorithm provides good solutions with relatively fewer computational effort.

  • PDF