• 제목/요약/키워드: selection of construction method

검색결과 517건 처리시간 0.026초

의사결정기법을 통한 건축공법선정에 관한 연구 (A Study on the Selection of Construction Method by Decision Making Method)

  • 양극영;윤여완
    • 한국건축시공학회지
    • /
    • 제2권1호
    • /
    • pp.147-154
    • /
    • 2002
  • In the Past, The selection of individual method of construction was done by head of construction site or an experienced person very frequently. By doing this, The wrong selection of construction method without exact adjudication of construction site situation lead to increasing of cost and extension of construction term. Finally it will effect all over the construction process. Especially, In case of underground construction in the beginning, there are a lot of a variable factor and it also effect on the entire construction process and it need very careful process. The purpose of this study is to present the best suitable methodology for selection of construction method by considering potential risk of construction method and variables together with external condition for underground construction. The purpose of this study Is to select the most suitable construction method by analysing potential conditions(construction site situation and client request in designing ) To do this, We prepared arrangement rule to arrange the conditions for construction method. And thin make checklist of the analyzing construction method. Though above process, To expect the risk of individual construction method using above risk checklist and using Analytic Hierarchy process among Multiple-Criteria Decision making, the professional opinions is to be adapted. By doing this, it can lead and select the most suitable construction method considering the data which get from risk density test.

리스크 분석을 통한 지하 구조체 공법 선정에 관한 연구 (A Study on the Selection of Underground Construction Method by Risk Analysis)

  • 윤여완;양극영;홍성휘
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2001년도 학술논문발표회
    • /
    • pp.99-117
    • /
    • 2001
  • In the past, The selection of individual method of construction was done by head of construction site or an experienced person very frequently. By doing this, The wrong selection of construction method without exact adjudication of construction site situation lead to increasing of cost and extension of construction term. Finally it will effect all over the construction process. Especially, In case of Underground construction in the beginning, there are a lot of a variable factor and it also effect on the entire construction process and it need rely careful process. The purpose of this study is to present the best suitable methodology fer selection of construction method by considering potential risk of construction method and variables together with external condition for Underground construction. The purpose of this study is to select the most suitable construction method by analysing potential conditions(Construction site situation and Client. Request in designing) To do this, We prepared arrangement rule to arrangement conditions for construction method. And then make Checklist the analyzing construction method. Though above process, To expect the risk of individual construction method using above risk checklist and using Analytic Hierarchy Process among Multiple-Criteria Decision Making, the professional opinions is to be adapted. By doing this, It can lead and select the most suitable considering method considering the data which get from risk density test.

  • PDF

다중 매트릭스 분석 기법을 이용한 최적 건축공법 선정 의사결정지원 모델 (Decision Making Model using Multiple Matrix Analysis for Optimum Construction Method Selection)

  • 이종식;임명관
    • 한국건축시공학회지
    • /
    • 제16권4호
    • /
    • pp.331-339
    • /
    • 2016
  • 건축물의 고층화, 복합화, 대형화에 따라 다양한 공법이 개발되고 있어 주요 공종에 대한 공법 선정의 중요성이 대두되고 있다. 그러나 프로젝트의 특성을 충분히 고려하지 못하고 있고 주요 공법의 선정을 위한 객관적 기준이나 자료 또한 부족한 실정이며, 실무자의 경험과 직관에만 의존하여 선정이 이루어지고 있는 점이 지적되어 왔다. 이러한 문제점을 해소하기 위해 퍼지, AHP, CBR 등 인공지능이론을 이용한 주요 공종의 공법 선정을 위한 다양한 연구가 진행되었다. 그러나 실무에서 공법 선정 시 공종별 특성 및 현장별 조건을 고려하여 주요 공종마다 각기 다른 여러 가지 공법 선정 모델을 적용하기는 어렵다. 이에 본 연구에서는 매트릭스 분석과 선형변환을 이용하여, 실무에서 활용이 용이한 범용적인 성격의 의사결정지원 모델을 제시하고, 사례 연구를 통해 흙막이 공법 선정 과정에 적용하여 연구모델의 정합성을 검증하였다.

공공공사 발주방식 선정에 영향을 미치는 요인 연구 (A Study of Factors Influencing Delivery Methods Selection on Public Construction Projects)

  • 김대길;이웅균;이학주
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 추계 학술논문 발표대회
    • /
    • pp.218-219
    • /
    • 2014
  • The selection of an appropriate contract method is vital for the successful operation of the project. However, there has been a lack of studies on objective decision making support models for use in the planning stage of a project contract. The present study had the goal of analyzing the factors that influence contract method selection, as an initial study for developing a project contract method selection model. The existing related studies were analyzed, and the factors considered in the literature were selected. Then, based on the findings, the opinions of an expert group on the important factors for contract method selection were collected through a survey. The collected opinions were analyzed using factor analysis, a statistical analysis method. The results will be utilized in the future as preliminary data for developing a decision making model for selecting a contract method.

  • PDF

철도지하횡단 통과 공법 선정기준에 관한 검토를 통해 효율적인 적용성에 대한 연구 (Research on Efficient Applicability Through Review on Standard for Selection of Construction Method for Railway Underground Crossing Transit)

  • 황영호;손정철;백종명
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 추계학술대회 논문집
    • /
    • pp.595-600
    • /
    • 2007
  • Greater expansion and more frequent operation of the railroad transportation system anticipated due to its characteristics including low cost, safety and mass transportation. Recently, effects on the railway structures due to expansion of newly constructed road, construction of subway, city gas pipeline, communication network, electric power network and construction of other railway underground crossing in accordance with urban planning and organization has influenced safe operation of trains. Accordingly, standard for selection of construction method that will enable construction of more economical and rational subway underground crossing structures by preventing problems occurring at the time of above construction works and accidents in safe operation of trains due to construction in advance is definitively necessary. Although there are numerous construction methods that can be applied at the time of construction of railway underground crossing, there are much difficulties in selection of appropriate construction method that considers characteristics of each construction method on non-excavation type construction method, train operation plan of number of operational routes and on-site circumstances. Therefore, this research aims to present rational standard for selection of construction method for such, and standard for slowdown speed and interception of train when passing the areas of slowdown in sectors under construction.

  • PDF

가중치 분석을 통한 도심지 Top-Down 공사에서의 공법요소 선정 모델 개발에 관한 연구 (A Study on the Sub-elements of the Top-down Construction Method Selection Model using Weighting Factor in Downtown Area)

  • 박창욱;문승윤;윤석현
    • 한국건축시공학회지
    • /
    • 제8권4호
    • /
    • pp.61-69
    • /
    • 2008
  • The size of the construction projects become huge and complex, and the depth of excavation for the underground structures become deeper. Also the working area is not enough for loading materials and temporary facilities. This is the most case of recent construction projects in downtown area. Top-down is the most useful method for this kind of construction projects. Top-down construction method consists of supporting method, retaining wall type, foundation type and construction direction such as up-down or up-up. construction managers have to select sub-elements for top-down construction method in planning phase. This study is to suggest the sub-elements selection model for the top-down construction method, and the case study is conducted for evaluating this model.

A STUDY ON THE PROCESS OF LARGE-SCALE REPAIR OF A CONDOMINIUM

  • Seki, Eiji;Akiyama, Tetukazu
    • 한국주거학회:학술대회논문집
    • /
    • 한국주거학회 2002년도 추계학술발표대회
    • /
    • pp.295-300
    • /
    • 2002
  • Since the contents of large-scale repair of a condominium were various, a plan document was not prepared. The owners association of the condominium has given priority to decision-making of price priority over quality. Examination is not performed about the contents of the construction supervision business, which checks whether suitable construction is performed, either. On the other hand, the know-how for builders, such as decision of the process plan under which the repair work lessens influence to the safety and life as much as possible since the place where the resident is living turns into a construction site, and selection of a method of construction, is just going to ask. It is an important subject how the structure of the construction contractor selection, which considered quality, is built. Then, this research focuses on large-scale repair construction of the condominium, and arranges the actual condition of a series of processes from plan document creation to construction supervision. The method of research collects the construction documents of the condominium that carried out Barge-scale repair construction. Next, collection arrangement of the data of construction builder selection is carried out. The method of the construction builder selection of those other than a construction price is examined. The method of quality control of large-scale repair construction is examined.

  • PDF

LCC 평가를 통한 지붕방수공법선정에 관한 연구 (A Study on Selection of Roof Waterproofing Method by analyzing Life Cycle Costing)

  • 최오영;김태희;김광희
    • 한국건축시공학회지
    • /
    • 제8권5호
    • /
    • pp.127-134
    • /
    • 2008
  • The purpose of this study is to propose the decision making technique in roof waterproofing method at the early construction stage. Selecting the suitable construction method is difficult because of the complex interrelationships between many factors of influencing the construction method selection. This study presents an example of selecting suitable method by analyzing LCC (Life Cycle Cost) in roof waterproofing work. In this study, roof waterproofing method is analyzed by LCC(Life Cycle Cost) which is consists of the initial costs, running costs, and removal costs. Sheet waterproofing, membrane waterproofing and asphalt waterproofing costs are compared to select the most economic method. The result of this study revealed that considering LCC is useful in selecting the proper method in the construction work.

노후 공동주택 평면확장 공법 선정을 위한 의사결정 시스템 구축방안 (Development of Decision-Making Process on Technology Selection for Aged-Housing Remodeling)

  • 이동건;차희성;김경래;신동우
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.448-452
    • /
    • 2006
  • 리모델링은 기존 건물을 폐기하지 않고 재활용 함으로써 자원의 재활용이라는 측면과 신축과 같은 부가가치를 창출한다는 측면에서 매우 중요하다고 할 수 있다. 그리고 공사에 적절한 공법 선정은 공사비와 공사기간을 줄여주고 품질을 향상시키는 역할을 한다. 또한 리모델링 공사의 경우 현장의 특성과 구조체의 특성이 공사시에 큰 영향을 끼치기 때문에 기존 신축공사 보다 공법선정이 매우 중요하다고 할 수 있다. 그러나 현재의 공법 선정은 시공정보를 반영하지 않고 단지 기존에 주로 사용하던 공법만을 선정하고 있다. 그렇기 때문에 본 연구에서는 공법 선정시 의사결정을 도와주기 위한 tool의 구축 방안을 제안한다.

  • PDF

지하공사 사례를 기반으로 한 터파기 공법 선정프로세스 분석 (Case Analyses of the Selection Process of an Excavation Method)

  • 박상현;이강;최명석;강현정;임홍철
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2007년도 춘계학술논문 발표대회
    • /
    • pp.101-104
    • /
    • 2007
  • As the proportion of underground construction increases, the impact of inappropriate selection of a underground construction method for a construction size increases. The purpose of this study is to develop an objective way of selecting an excavation method. There have been several attempts to achieve the same goal using various data mining methods such as the artificial neural network, the support vector machine, and the case-based reasoning. However, they focused only on the selection of a retaining wall construction method out of six types of retaining walls. When we categorized an underground construction work into four groups and added more number of independent variables (i.e., more number of construction methods), the predictability decreased. As an alternative, we developed a decision tree by analyzing 25 earthwork cases with detailed information. We implemented the developed decision tree as a computer-supported program called Dr. underground and are still in the process of validating and revising the decision tree. This study is still in a preliminary stage and will be improved by collecting and analyzing more cases.

  • PDF