• 제목/요약/키워드: sediment scour

검색결과 46건 처리시간 0.025초

영천강 만곡부의 저수수제군이 생태계 및 하상변동에 미치는 효과 (Effects of Submerged Spur Dikes on the Ecosystem and Bed Deformation in Youngcheon River Bend)

  • 김기흥;이형래;정혜련
    • 한국환경복원기술학회지
    • /
    • 제16권2호
    • /
    • pp.137-153
    • /
    • 2013
  • In order to assess the effects of ecosystem and landscape in around spur dikes, this study had carried out monitoring on the changes of ecosystem and morphologic characteristics in around spur dikes that had been settled in bend of Youngcheon River. The study site was a short reach with length 190m, spur dikes were installed in March, 2008. Monitoring of the site had been started in May 2008 and had been completed September 2011. The results are as follow ; 1) Spur dikes that were installed for channel stabilization are performing effectively hydraulic functions at flooding time. 2) Spur dikes that were installed in water colliding front of river bend brought about sediment deposition between those and formed pools around front of those. Therefore, it was verified to create various physical characteristics in the aspect of channel topography and flow consequently. 3) The survey results that was carried out in October 2008 showed to emerge 25 species of plant, 9 species of fish and 17 species of benthic macroinvertebrates, but the survey results in October 2010 showed to emerge 74 species of plant, 12 species of fish and 19 species of benthic macroinvertebrates. In particular, plant species that emerged in 2011 increased about three times more than those in 2008.

하도특성량과 수치모형에 의한 하상변동 예측 (Prediction of River-bed Change Using River Channel Characteristics and A Numerical Model)

  • 윤여승;안경수
    • 한국습지학회지
    • /
    • 제9권3호
    • /
    • pp.51-61
    • /
    • 2007
  • 자연하천은 하천개수사업, 유역의 토지이용 변화, 댐 및 저수지 건설, 골재채취 등 여러 가지 요인에 의해 하상이 변동하게 된다. 이러한 하상변동은 하천정비 및 다양한 습지계획, 안정하도 유지관리를 위해 매우 중요한 사항이다. 본 연구에서는 골재채취로 인해 저하된 하상이 점차 안정화 되어가고 있는 금강 및 미호천 국가하천 구간을 대상으로 하천측량, 하상재료 채취 분석을 실시하고, 이를 토대로 하도 형성을 지배하는 하도특성량 분석과 수치모형에 의해 장래 하상변동을 예측하였다. 연구결과 하상경사 및 마찰속도 등 하도특성량을 통해 분석한 하상변동 잠재성 평가 결과와 수치모형을 이용한 하상변동 예측결과가 비슷한 경향을 나타냈으며, 금강 및 미호천은 장래 하도가 안정화될 것으로 분석되었다. 이와 같이 장래 하상의 세굴 또는 퇴적경향 등을 예측하고 그 특성을 반영하면, 치수적인 대책 수립과 수리적으로 안전한 구간에서의 식생호안 설치 등 치수적으로 안전하고 친환경적인 하천 및 습지계획이 가능할 것이다.

  • PDF

하천 협소부에서 하상 이동성과 형태와의 상관성에 관한 하도수리학적 평가 (Hydraulic Assessment about Correlation of Fluvial Movement and River Bed Form on the Narrow Pass of Channel)

  • 최호균;김원일;이삼희;안원식
    • 한국수자원학회논문집
    • /
    • 제42권2호
    • /
    • pp.141-148
    • /
    • 2009
  • 하천은 지역마다 독특한 하도특성을 지니고 있다. 우리나라는 전 국토의 70 %가 산지로 구성되어 있으며, 이 가운데 노년기에 지형도 적지 않다. 이를 가로 지르는 우리나라 하천에서 특이한 하도형태의 모습을 보이는 구간이 곳곳에 산재하고 있다. 그 대표적인 모습이 충적하도와 침식하도가 연속해 발생하는 과정에서 나타나는 하천 협소부이다. 하천 협소부란 하천지형학에서 일반적으로 쓰이고 있는 용어이며, 하도수리학에서는 지배유량에 종속되는 일정하폭의 범위를 크게 벗어난 하천병목구간을 뜻한다. 이러한 협소부 주변지역은 전형적인 수해상습 지역이 되는 경우가 많다. 이러한 상황임에도 불구하고 현재까지 우리나라에서는 이러한 협소부 구간에서 하도특성을 반영한 조사 및 연구 사례가 전무한 실정이다. 따라서, 본 연구에서는 낙동강 선산지역에 위치한 하천 협소부에서 하도형태에 대하여 조사하고 하도수리학적으로 분석하고 평가하였다. 연구 결과, 모래하천인 조사구간의 저수로 하상에서 아주 미세한 유사분급 현상은 확인할 수 있었지만, 하도변화의 작용력에 의한 유사분급 현상이라 판단하기에는 어려운 부분이 있었다. 이는 완만한 하상경사, 균일성에 가까운 하상재료의 분포 및 공급에 기인한다고 판단되었다. 그러나 이와 같은 자연적인 현상보다는 골재채취 등의 인위적 교란에 따른 유사분급이 확연하다고 추정되었다. 그리고 협소부의 배수구역에서 과거 활발했던 단단면 이동상 하도가 유심부의 이동과 더불어 최근 급격하게 복단면화가 진행되고 있음을 확인하였다. 이와 더불어 저수로의 하폭이 크게 줄어드는 현상을 확인할 수 있었다. 이와 같은 현상은 궁극적으로 이상홍수 발생시 복단면 가중 혹은 홍수단면적 축소의 원인이 된다. 또한, 저수로에서 호안 또는 제방 아래 부분의 국소세굴이 야기될 수 있음을 시사한다.

How effective has the Wairau River erodible embankment been in removing sediment from the Lower Wairau River?

  • Kyle, Christensen
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2015년도 학술발표회
    • /
    • pp.237-237
    • /
    • 2015
  • The district of Marlborough has had more than its share of river management projects over the past 150 years, each one uniquely affecting the geomorphology and flood hazard of the Wairau Plains. A major early project was to block the Opawa distributary channel at Conders Bend. The Opawa distributary channel took a third and more of Wairau River floodwaters and was a major increasing threat to Blenheim. The blocking of the Opawa required the Wairau and Lower Wairau rivers to carry greater flood flows more often. Consequently the Lower Wairau River was breaking out of its stopbanks approximately every seven years. The idea of diverting flood waters at Tuamarina by providing a direct diversion to the sea through the beach ridges was conceptualised back around the 1920s however, limits on resources and machinery meant the mission of excavating this diversion didn't become feasible until the 1960s. In 1964 a 10 m wide pilot channel was cut from the sea to Tuamarina with an initial capacity of $700m^3/s$. It was expected that floods would eventually scour this 'Wairau Diversion' to its design channel width of 150 m. This did take many more years than initially thought but after approximately 50 years with a little mechanical assistance the Wairau Diversion reached an adequate capacity. Using the power of the river to erode the channel out to its design width and depth was a brilliant idea that saved many thousands of dollars in construction costs and it is somewhat ironic that it is that very same concept that is now being used to deal with the aggradation problem that the Wairau Diversion has caused. The introduction of the Wairau Diversion did provide some flood relief to the lower reaches of the river but unfortunately as the Diversion channel was eroding and enlarging the Lower Wairau River was aggrading and reducing in capacity due to its inability to pass its sediment load with reduced flood flows. It is estimated that approximately $2,000,000m^3$ of sediment was deposited on the bed of the Lower Wairau River in the time between the Diversion's introduction in 1964 and 2010, raising the Lower Wairau's bed upwards of 1.5m in some locations. A numerical morphological model (MIKE-11 ST) was used to assess a number of options which led to the decision and resource consent to construct an erodible (fuse plug) bank at the head of the Wairau Diversion to divert more frequent scouring-flows ($+400m^3/s$)down the Lower Wairau River. Full control gates were ruled out on the grounds of expense. The initial construction of the erodible bank followed in late 2009 with the bank's level at the fuse location set to overtop and begin washing out at a combined Wairau flow of $1,400m^3/s$ which avoids berm flooding in the Lower Wairau. In the three years since the erodible bank was first constructed the Wairau River has sustained 14 events with recorded flows at Tuamarina above $1,000m^3/s$ and three of events in excess of $2,500m^3/s$. These freshes and floods have resulted in washout and rebuild of the erodible bank eight times with a combined rebuild expenditure of $80,000. Marlborough District Council's Rivers & Drainage Department maintains a regular monitoring program for the bed of the Lower Wairau River, which consists of recurrently surveying a series of standard cross sections and estimating the mean bed level (MBL) at each section as well as an overall MBL change over time. A survey was carried out just prior to the installation of the erodible bank and another survey was carried out earlier this year. The results from this latest survey show for the first time since construction of the Wairau Diversion the Lower Wairau River is enlarging. It is estimated that the entire bed of the Lower Wairau has eroded down by an overall average of 60 mm since the introduction of the erodible bank which equates to a total volume of $260,000m^3$. At a cost of $$0.30/m^3$ this represents excellent value compared to mechanical dredging which would likely be in excess of $$10/m^3$. This confirms that the idea of using the river to enlarge the channel is again working for the Wairau River system and that in time nature's "excavator" will provide a channel capacity that will continue to meet design requirements.

  • PDF

항만건설사업의 해양환경 환경영향평가 가이드라인 개발 연구 (A Study on Environmental Impact Assessment Guidelines for Marine Environments in Harbor Construction Projects)

  • 맹준호;김태윤;이해미
    • 환경영향평가
    • /
    • 제31권3호
    • /
    • pp.141-160
    • /
    • 2022
  • 항만건설사업은 해양생물 서식지 훼손, 해양수질 오염, 해수유동 및 해안 침·퇴적 변화 등 다양한 해양환경적 문제들을 야기할 수 있다. 환경영향평가는 이러한 환경적 문제를 사전에 예방하기 위하여 사업 시행 전에 환경영향평가를 통해 환경적 문제를 미리 예측하고 영향을 최소화하기 위한 방안을 마련하고자 실시한다. 아울러 환경영향평가 검토기관에서는 사업별 환경영향평가 가이드라인 마련을 통해 과학적이고 표준화된 환경영향평가가 실시될 수 있도록 노력하고 있다. 본 연구는 항만건설사업에 특화된 환경영향평가 가이드라인을 마련하기 위하여 지난 13년간(2009~2021년)의 항만건설사업 환경영향평가서 검토의견을 토대로 환경영향평가 시의 문제점들을 살펴보고, 기존 환경영향평가서 작성 가이드라인 등을 참조하여 항만건설사업 해양환경 환경영향평가에 적합한 가이드라인을 마련하고자 하였다. 본 가이드라인은 중점 검토항목인 해양 동·식물, 해양물리, 해양수질 및 해저퇴적물환경 항목을 대상으로, 현황조사, 영향 예측, 저감방안, 사후환경영향조사에서의 중점 검토사항을 정리하여 제시하였다. 해양 동·식물 항목 현황조사 시, 해역 특성 및 항만사업의 성격을 고려한 조사정점 선정 방안과 영향 예측 시, 부유토사 확산으로 인한 해양생물 영향과 준설 및 매립으로 인한 저서생물 서식지 훼손에 대한 영향 예측 실시 방안 등을 제시하였다. 해양물리 항목의 현황조사 시, 조사항목은 해역 특성을 고려하여 필수 조사항목과 부가 조사항목으로 구분하여 제시하였고, 영향 예측 시에는 해수유동실험과 부유사확산실험, 퇴적물이동실험, 수온 및 염분 확산, 해수교환율실험, 파랑변형실험, 항내정온도실험, 해안선변화실험 방안 등을 제시하였다. 본 연구 결과는 항만건설사업 환경영향평가를 수행하는데 있어서 보다 체계적이고 과학적인 조사 및 영향 예측을 유도하여 해양환경을 보호하는데 기여할 것이다.

머신러닝을 이용한 해빈단면 변화 예측 (Prediction of Beach Profile Change Using Machine Learning Technique)

  • 심규태;조병선;김규한
    • 대한토목학회논문집
    • /
    • 제42권5호
    • /
    • pp.639-650
    • /
    • 2022
  • 대규모 표사이동으로 인해 침·퇴적이 발생되는 해안에서는 시간이력에 따라 그 현상이 가속화되는 경향이 있기 때문에 적절하고도 시급한 대책을 강구하는 것이 중요하다. 해안침식의 대책방안 중 환경친화적 대책으로 알려진 양빈공법의 경우 입경의 크기에 따라 침식양상이 변화되므로 적정 입경의 크기, 범위 등에 대해 결정하기 위해서는 면밀한 검토가 필요하다. 본 연구에서는 양빈사의 입경변화와 부분양빈의 적용, 파랑과 바람이 공존하는 조건 등을 변수로 설정하였을 때 발생되는 지형변화의 특성을 검토하고자 하였다. 이러한 요인들은 수치모형실험에서 해석하기 어려운 부분이 존재하기 때문에 수리모형실험을 통해 정성적인 해석을 수행하거나 양빈수행 이후에 현장모니터링 등을 통해 그 효과를 검토하게 된다. 하지만 실험과 모니터링 등은 제반사항이 발생되기 때문에 다양한 조건에 대한 예측 연구에는 어려움이 존재한다. 본 논문에서는 빅데이터의 활용을 통한 머신러닝 기법을 이용하여 침·퇴적 경향을 재현함으로써 발생 가능한 현상에 대해 예측함과 동시에 머신러닝 기법의 적용성을 검토하고자 하였다. 학습데이터는 수리모형실험결과를 이용하였으며 연구결과 머신러닝을 이용한 지형변화는 단기예측의 경우 기존연구와 유사한 경향을 보이는 것으로 나타났으나 세굴 및 모래톱의 형성 등에서는 다소 차이가 존재하는 것을 확인할 수 있었다.