• Title/Summary/Keyword: scheduling management

Search Result 1,282, Processing Time 0.037 seconds

A Study on Multi-Vehicle Control of Electro Active Polymer Actuator based on Embedded System using Adaptive Fuzzy Controller (Adaptive Fuzzy 제어기를 이용한 Embedded 시스템 기반의 기능성 고분자 구동체 다중제어에 관한 연구)

  • 김태형;김훈모
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.20 no.2
    • /
    • pp.94-103
    • /
    • 2003
  • In case of environment requiring safety such as human body and requiring flexible shape, a conventional mechanical actuator system does not satisfy requirements. Therefore, in order to solve these problems. a research of various smart material such as EAP (Electro Active Polymer), EAC (Electro Active Ceramic) and SMA (Shape Memory Alloy) is in progress. Recently, the highest preferring material among various smart material is EP (Electrostictive Polymer), because it has very fast response time, powerful force and large displacement. The previous researches have been studied properties of polymer and simple control, but present researches are studied a polymer actuator. An EP (Electostrictive Polymer) actuator has properties which change variably ils shape and environmental condition. Therefore, in order to coincide with a user's purpose, it is important not only to decide a shape of actuator and mechanical design but also to investigate a efficient controller. In this paper, we constructed the control logic with an adaptive fuzzy algorithm which depends on the physical properties of EP that has a dielectric constant depending on time. It caused for a sub-actuator to operate at the same time that a sub-actuator system operation increase with a functional improvement and control efficiency improvement in each actuator, hence it becomes very important to manage it effectively and to control the sub-system which Is operated effectively. There is a limitation on the management of Main-host system which has multiple sub-system, hence it brings out the Multi-Vehicle Control process that disperse the task efficiently. Controlling the multi-dispersion system efficiently, it needs the research of Main-host system's scheduling, data interchange between sub-actuators, data interchange between Main-host system and sub-actuator system, and data communication process. Therefore in this papers, we compared the fuzzy controller with the adaptive fuzzy controller. also, we applied the scheduling method for efficient multi-control in EP Actuator and the algorithm with interchanging data, protocol design.

Hybrid ABS based Inter-Cell Scheduling Algorithms for QoS Improvement of Heterogeneous Networks (이기종 네트워크의 QoS 향상을 위한 Hybrid ABS기반 셀 간 스케줄링 알고리즘)

  • Kim, Myung-Dong;Seong, Hyeon-Kyeong
    • Journal of the Institute of Convergence Signal Processing
    • /
    • v.17 no.1
    • /
    • pp.1-9
    • /
    • 2016
  • In this paper, for the improvement of quality of service(QoS) performance of heterogeneous networks, multi-cell scheduling is proposed. In order to implement the proposed algorithm, for the recognition of the impact on the throughput performance of users, macro-pico-cells that form distributed architecture were proposed. In operating heterogeneous networks, considering the centralized structure, a macro-RRH(Remote Radio Head) deployment scenario was proposed. For interference mitigation of the proposed system, by applying the optional sub-frame, through CQI(Channel Quality Indicator) measurement for each sub-frame period, constraint conditions were measured according to system situations. For the simplification, the pattern of the same ABS muting was assumed. In the above two multi-cell environments, the algorithm of high-speed load balancing maintenance was proposed.

DEEP-South: Automated Scheduler and Data Pipeline

  • Yim, Hong-Suh;Kim, Myung-Jin;Roh, Dong-Goo;Park, Jintae;Moon, Hong-Kyu;Choi, Young-Jun;Bae, Young-Ho;Lee, Hee-Jae;Oh, Young-Seok
    • The Bulletin of The Korean Astronomical Society
    • /
    • v.41 no.1
    • /
    • pp.54.3-55
    • /
    • 2016
  • DEEP-South Scheduling and Data reduction System (DS SDS) consists of two separate software subsystems: Headquarters (HQ) at Korea Astronomy and Space Science Institute (KASI), and SDS Data Reduction (DR) at Korea Institute of Science and Technology Information (KISTI). HQ runs the DS Scheduling System (DSS), DS database (DB), and Control and Monitoring (C&M) designed to monitor and manage overall SDS actions. DR hosts the Moving Object Detection Program (MODP), Asteroid Spin Analysis Package (ASAP) and Data Reduction Control & Monitor (DRCM). MODP and ASAP conduct data analysis while DRCM checks if they are working properly. The functions of SDS is three-fold: (1) DSS plans schedules for three KMTNet stations, (2) DR performs data analysis, and (3) C&M checks whether DSS and DR function properly. DSS prepares a list of targets, aids users in deciding observation priority, calculates exposure time, schedules nightly runs, and archives data using Database Management System (DBMS). MODP is designed to discover moving objects on CCD images, while ASAP performs photometry and reconstructs their lightcurves. Based on ASAP lightcurve analysis and/or MODP astrometry, DSS schedules follow-up runs to be conducted with a part of, or three KMTNet telescopes.

  • PDF

The Prospect of 'Recordkeeping Regime' in the Public Sector of Korea : Examination on the characteristics of the Tables of Transactions for Records Scheduling by PRA Act (한국 공공분야 '기록보유(Recordkeeping)'체제 전망 -'기록물분류기준표'의 제도적 의의와 특성 -)

  • Lee, Seung-Eok
    • The Korean Journal of Archival Studies
    • /
    • no.4
    • /
    • pp.31-62
    • /
    • 2001
  • In this paper, I examined specific characteristics of the Tables of Transactions for Records Scheduling(TRS) (記錄物分類基準表 ; Kirokmul-Bulyukijun - Pyo) system by Public Records and Archives Act(PRA Act, No. 5709, 1999). All staffs and employees in governmental agencies of Korea must register, classify and dispose of their official records according to TRS by the Presidential Regulation for the application of PRA Act(No. 17050, 2000). Namely, the criteria of TRS is applicable to all stages of records lifecycle from creation to disposition(transfer to Archives or legal destruction). In the theoretical and methodological area, therefore, it is absolutely important that records managers and archival professionals in Korea make analysis on functions and characteristics of TRS by PRA Act. In the first, my examination take notice of possibility of 'adequate and proper documentation' about activity of the executive organization in TRS system. Other attention is that records management according to TRS means managing of records not only as physical entities but as logical entities which imply content and context of creation and use. In other hand, I wish to account for reasonable separation consideration for continuing utility of archives from current use of records throughout agencies duration Another theme of discussion in this paper is the theoretical framework which give account of TRS's characters. In conclusion, accountability for characteristics of TRS system could have been found in counterproposal view including the concept of Records continuum and the notion of Recordkeeping regime in Australia based on rethinking about Records lifecycle model. In the extent of practical area, more or less, it is imbalanced method that compare TRS by PRA Act to Recordkeeping regime based on Records continuum. Nevertheless, the concept and notion is suitable framework that give account of the prospect of recordkeeping system under PRA Act.as well as the meaningful characteristic of TRS.

The Role of Job Autonomy Influencing on Creative Behavior in the Smart Work Context (스마트워크에서 직무자율성이 창의적 행위에 미치는 영향)

  • Yong-Young Kim
    • Journal of Industrial Convergence
    • /
    • v.21 no.4
    • /
    • pp.13-22
    • /
    • 2023
  • Due to COVID-19, organizations are rapidly changing the way they work by providing telecommuting and flexible work, and by expanding Smart Work spaces. In a Smart Work situation, workers have improved their job autonomy to choose their work methods, hours, and places. However, previous studies do not reflect the Smart Work situation and there are limitations to still using the previous job autonomy concept and measurements. To overcome these problems, this study derived job autonomy types such as methods, scheduling, criteria, time, and place applicable to Smart Work environments and verified that the five types of job autonomy have a statistically significant positive effect on Smart Workers' creative behavior. This study is meaningful in that it categorized job autonomy into five types applicable to Smart Work by adding temporal and spatial flexibility to the traditional job autonomy concept such as method, scheduling, and criteria autonomy and provided the basis for subdividing and evaluating the operation performance of Smart Work through multi-dimensional job autonomy verification.

The research and correspondence of schedule risk management at the pre-construction phase of curtain-wall (커튼월 공사의 착공 전 단계에서 공정 리스크 규명 및 대응방안)

  • Jung Tae-Sik;Kim chang-duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.4 s.26
    • /
    • pp.71-79
    • /
    • 2005
  • As construction projects have been extremely enormous, complex and special, risk factors have been increased consistently. Therefore, it is very important to identify and cope with the uncertain risk factors in such building constructions for successful project accomplishment. The purpose of this research is to approach practical affairs directly and show detail alternatives of risk factors by extracting the risk factors throughout construction process of curtain wall that is largely influenced on cost, quality, schedule ,safety and following activity. Also, extracting these risk factors make it possible to analyze quantitative risk and decide the priority raking of risk factors. Especially, this research is aimed to provide efficient management of scheduling risk that can make the risk minimize to practical workers who have different degree of knowledge and experience to the construction cite when the risk brings out suddenly.

Web-based Three-step Project Management Model and Its Software Development

  • Hwang Heung-Suk;Cho Gyu-Sung
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2006.05a
    • /
    • pp.373-378
    • /
    • 2006
  • Recently the technical advances and complexities have generated much of the difficulties in managing the project resources, for both scheduling and costing to accomplish the project in the most efficient manner. The project manager is frequently required to render judgments concerning the schedule and resource adjustments. This research develops an analytical model for a schedule-cost and risk analysis based on visual PERT/CPM. We used a three-step approach: 1) in the first step, a deterministic PERT/CPM model for the critical path and estimating the project time schedule and related resource planning and we developed a heuristic model for crash and stretch out analysis based upon a time-cost trade-off associated with the crash and stretch out of the project. 2) In second step, we developed web-based risk evaluation model for project analysis. Major technologies used for this step are AHP (analytic hierarchy process, fuzzy-AHP, multi-attribute analysis, stochastic network simulation, and web based decision support system. Also we have developed computer programs and have shown the results of sample runs for an R&D project risk analysis. 3) We developed an optimization model for project resource allocation. We used AHP weighted values and optimization methods. Computer implementation for this model is provided based on GUI-Type objective-oriented programming for the users and provided displays of all the inputs and outputs in the form of GUI-Type. The results of this research will provide the project managers with efficient management tools.

  • PDF

A Study on the Development of a Real-Time Schedule Progress Control System in Steel Structural Construction (철골골조공사의 실시간 진도관리 시스템 구축에 관한 연구)

  • Kim, Kyong-Hoon;Kim, Kyung-Hwan;Lee, Yoon-Sun;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.886-891
    • /
    • 2007
  • All sorts of technique for schedule progress management is being developed recently. These can change and develop the abstractive concept model to a detailed model that describes the visual 3D image about a schedule plan. but, this technique is troublesome, because this requires the handwork by means of connection between 3D-CAD and scheduling Program. In this study, the process of real-time schedule progress control system using the integrated database by 3D-CAD object information system and schedule module is presented. This study present the process of a schedule progress management using IDEF0 model, and the process of real-time schedule progress management using RFID system. Through this study, we want to realize the rapid generation of estimated schedule information and to simulate and analyze actual schedule information by real-time.

  • PDF

A Case Study on Productivity Improvement by a Discrete Event-Driven Simulation System (이산사건 시뮬레이션 시스템을 활용한 생산성 개선 사례 연구)

  • Kim, Sangtae;Shin, Moonsoo;Ryu, Kwangyeol;Cho, Yongju
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.38 no.4
    • /
    • pp.149-158
    • /
    • 2015
  • Up-to-date manufacturing companies have faced a market-driven environment of pull production order. There should be a difference in operating manufacturing resources according to the type, quantity, and delivery time of manufactured products, because the process situation in pull production is changed by customer orders. And it should be taken into account from the stage of preparing for production such as process design and the placement and utilization of manufacturing resources. However, the feasibility of production plans is limited because most of small manufacturing businesses make production/supply plan of the parts and products assuming that equipment abilities in scheduling is sufficient without managing process standard information systemically. In this study, a discrete event simulation system based on BOM (bill of material), that is F-OPIS (online productivity innovation system), is introduced and a case study on application of the system leading to improving productivities is presented. F-OPIS deals with a decision-problem on production management and it is specialized for small-and- medium sized manufacturing companies. The target company of this case study is a typical small-and-medium sized manufacturing company in Korea, that produces various machined parts. The target company adopts make-to-stock production management to prevent tardy delivery because of fluctuations in demand. Therefore, it is required to apply an efficient inventory control solution for improving productivities. In this paper, based on the constraints of working capacity of manufacturing resources, the bottleneck process is analyzed as production conditions are changed. Consequently, an improvement plan is proposed, that eventually enhances overall utilization rates of resources in the bottleneck process and reduces overall production lead-time and inventory level.

What Factors Make the Delay of the Information System Project Implementation? (무엇이 정보시스템 프로젝트 일정을 지연시키는가?)

  • Seoung, Byung Ook;Park, Sang Cheol;Koh, Joon
    • Knowledge Management Research
    • /
    • v.22 no.1
    • /
    • pp.1-19
    • /
    • 2021
  • Large-scaled hospital information system projects are often delayed than originally planned. Regarding project management, it is necessary to examine main factors triggering the schedule delay and to analyze the causality of such delay. This study tries to find the delay factors and causal relationship between them based on the case of the hospital information system development project by using the grounded theory method. It turned out that 'unrealistic scheduling' affects overall schedule delays like domino phenomenon, and 'poor analysis of existing systems' leads to poor quality of work analysis while 'poor subsystem integrated interface' triggers poor design quality. This study found out the factors affecting the delay of a project, analyzing cause-and-effect relationships between them in the academic side. From the practical view, it shows a solution to minimize delays in the project schedule for each of SI companies, hospitals and project managers.