• Title/Summary/Keyword: scheduling management

Search Result 1,293, Processing Time 0.025 seconds

A Study of Methods on Safety Checklist Improvement and Integrated Operation with Schedule for Construction Accident Prevention (건설공사 안전사고 예방을 위한 안전관리 체크리스트 개선과 공정관리와의 연계운영 방법)

  • Yang Yong-Cheol;Choi Hoon;Kim Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.123-135
    • /
    • 2004
  • Construction accident have been increasing in despite of safety management activities and education in construction site. This study surveyed safety organization, education, safety management, scheduling, safety checklist with construction firms in order to grasp the actual condition. A improved method is suggested that safety checklist is supplemented with various safety materials and then stored as database. Furthermore, safety checklists are connected and operated with schedule in ender to more efficiently prevent construction accidents.

A Study on Schedule Management in Construction Projects by CCPM (CCPM을 이용한 건설사업 일정관리에 관한 연구)

  • Park Young-Min;Kim Soo-Yong;Kim Ki-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.5 s.21
    • /
    • pp.84-92
    • /
    • 2004
  • Construction work varies with the project types. However, the success of all project types depends upon three conditions i.e. schedule, quality and cost. If these three conditions are fulfilled, then project said to be successful. In this paper, scheduling of a construction Project has been dealt with the application of CCPM method. CCPM has been introduced as a new theory in construction industry in 1997 at the United States, but its application is still insufficient in domestic field due to the absence of systematic study, A simulation has been conducted in a Bridge construction project to validate the possibility of CCPM in order to complement PERT/CPM in construction field. The result of study shows that the CCPM could be effective to reduce the project time duration than existing PERT/CPM technique.

Causes of Delay in Construction Projects in Bangladesh

  • Islam, Mohammad Saiful;Trigunarsyah, Bambang;Hassanain, Mohammad;Assaf, Sadi
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.82-86
    • /
    • 2015
  • Construction delay is a common problem worldwide, which is considered as one of the main reasons for project failure. Bangladesh construction industry is no exception. This study investigated the main causes of delay in large building construction projects in Bangladesh. A questionnaire survey was conducted to determine the causes of delay from owners, consultants, and contractors of large building construction projects. About 70 respondents participated in the survey. Using the importance index analysis, the study identified 10 most important causes of delay from a list of 30 different causes. Ten most important causes were: (1) lack of experienced construction manager, (2) lowest bidder selection, (3) funding shortage by owner, (4) lack of proper management, (5) improper planning and scheduling, (6) lack of skilled workers, (7) site constraints, (8) contractors' cash flow problems during construction, (9) escalation of resources price, and (10) contractors' excessive workload. Furthermore, Kruskal-Wallis test indicates that there is no significant variation exists among the three group of respondents, ie owners, consultants and contractors.

  • PDF

PRODUCTIVITY PREDICTION MODEL BASED ON PRODUCTIVION INFLUENCING FACTORS: FOCUSED ON FORMWORK OF RESIDENTIAL BUILDING

  • Byungki Kwon;Hyun-soo Lee;Moonseo Park;Hyunsoo Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.58-65
    • /
    • 2011
  • Construction Productivity is one of the most important elements in construction management. It is used in construction process scheduling and cost management, which are significant sector in construction management. It is important to make appropriate schedule and monitor how works are done within schedule. But construction project contains uncertainty and inexactitude, modifying construction schedule is being an issue to manage construction works well. Even though prediction and monitoring of productivity can be principal activity, it is hard to predict productivity with manager's experience and a standard of estimate. A large number of factors influencing productivity, such as drawing, construction method, weather, labor, material, equipment, etc. But current calculation of productivity depends on empirical probability, not consider difference of each influencing factor. In this research, the aim is to present a productivity predicting regression model of form work, which includes effectiveness of influences factors. 5 variables existed inside form work are selected by interview and site research based on literature review of existed various productivity influencing factors. The effectiveness and correlation of productivity influencing factors are analyzed by statistical approach, and it is used to make productivity regression model. The finding of this research will improves monitoring and controlling of project schedule in construction phase.

  • PDF

Optimization of Estimating Duration of the Structural Frame for the High-rise Apartment Housing during the Winter season -Focusing on One Cycle Time Scheduling Mechanism of the Typical Floor- (동절기 아파트 골조공사의 적정공기 산정에 관한 연구 - 기준층 사이클 공정분석을 중심으로 -)

  • Bang Jong-Dae;Han Choong-Hee;Kim Sun-Kuk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.170-178
    • /
    • 2004
  • Public construction companies have strictly followed a rule that they should not work in the wet area such as structural frame for a certain period during the winter season. It is usually known that the non-working period during the winter causes increase of the project duration, and the project cost escalation. Also, it makes negative effects on national economy because it reduces workers income. Therefore, the site work for the structural frame should be performed even during the whiter season. But the site work for the structural frame during that period cannot proceeds in the same way as during other periods, and requires a different method for estimating project duration. Through an analysis of time scheduling mechanism, actual working days are obtained for 1 cycle of typical floors in the structural frame during these periods, and non-working days of 5 years average are calculated based on calendar day using data of 5 years weather forecasts for that season. This study proposes an optimized way of estimating project duration for 1 cycle of typical floors in the structural frame during these periods. This estimating method uses the combined actual working days and non-working days of 5 years' average, and the estimated results are confirmed by being compared with field data. This study is expected to be used in estimating the construction duration of the structural frame during the winter season.

A Study on the Scheduling Improvement for Periodic Real-time Taske on Middleware based on Linux(TMOSM/Linux) (리눅스 미들웨어(TMOSM/Linux)에서 주기성을 가진 실시간 태스크의 스케쥴링 향상에 관한 연구)

  • Park Ho-Joon;Lee Chang-Hoon
    • The KIPS Transactions:PartA
    • /
    • v.11A no.7 s.91
    • /
    • pp.483-488
    • /
    • 2004
  • For real-time applications, the underlying operating system (0S) should support timeliness guarantees of real-time tasks. However, most of current operating systems do not provide timely management facilities in an efficient way. There could be two approaches to support timely management facilities for real-time applications: (1) by modifying 0S kernel and (2) by Providing a middleware without modifying 0S. In our approach, we adopted the middleware approach based on the TMO (Time-triggerred Message-triggered Object) model which is a well-known real-tine object model. The middleware, named TMSOM (TMO Support Middleware) has been implemented on various OSes such as Linux and Windows XP/NT/98. In this paper, we mainly consider TMOSM implemented on Linux(TMOS/Linux). Although the real-time schedul-ing aIgorithm used in current TMOSM/Linux can produce an efficient real-time schedule, it can be improved for periodic real-time tasks by considering several factors. In this paper, we discuss those factors and propose an improved real-time scheduling algorithm for periodic real-time tasks, In order to simulate the performance of our algorithm, we measure timeliness guarantee rate for periodic real-time tasks. The result shows that the performance of our algorithm is superior to that of existing algorithm. Additionally, the proposed algorithm can improve system performance by making the structure of real-time middleware simpler.

A Knowledge-based Approach to Plant Construction Process Planning (지식 기반 플랜트 건설 공정 계획 시스템의 개발)

  • 김우주
    • Journal of Intelligence and Information Systems
    • /
    • v.7 no.1
    • /
    • pp.81-95
    • /
    • 2001
  • Plant construction projects usually take much higher uncertainty and risks than the projects from other domains. This implies the importance of plant construction project management should be more emphasized than the other domain. Especially, the overall successes of the projects often depend on the performance of process planning and scheduling performed at the initial stage of the project. However, most plant construction projects suffer great difficulties in establishing proper process planning and scheduling timely because of unstructureness and dynamicity of environment of the project itself In this paper, we propose a knowledge-based process planning and scheduling approach in a plant construction domain to cope this problem. First, we modulize process planning knowledge and present the knowledge representation scheme. Second, we propose an inferencing mechanism to build a process planning for plant construction based on the represented process planning knowledge. Since our approach automate the initial process planning, which was usually done by manual way, it can improve the correctness and also completeness of the process plan and schedule by reducing the time to plan and allowing simulations on the various situation. We also design and implement this our approach as a real working system, and it is successfully applied to real plant construction cases from a leading construction company in Korea. Based on this success, we expect our approach can be easily applied to the projects of other areas, while contributing to enhancement in productivity and quality of project management.

  • PDF

Applications of Mathematical Optimization Method for Chemical Industries (화학 산업에서 수학적 최적화 기법을 적용한 사례)

  • Kim, Eun-Yong;Heo, Soon-Ki;Lee, Kyu-Hwang;Lee, Hokyung
    • Korean Chemical Engineering Research
    • /
    • v.58 no.2
    • /
    • pp.209-223
    • /
    • 2020
  • Executions of SCM in a chemical company of which divisions produce petrochemicals, compounds, batteries, IT material and medicine directly affect their own profit. Execution level of SCM or optimization is very important. This work presents activities of SCM and optimization of inefficient issues in several industrial divisions using mathematical optimization method. The meaning is not only academic research but also making a useful tool which active partner deals with in his work. It is explained how to do beforehand and afterward optimization problem. The benefits are mentioned in the sections. The first of examples would be cover supply plan optimization, optimal profit business plan, and scheduling of a stretching process of polarizer based on minimizing raw material loss in polarizer production. The second example would be cover the optimization of production/packaging plans to maximize productivity of Poly Olefin processes, and the third example is minimization of transition loss in the production of battery electrodes. The fourth example would be cover scheduling of vessel approaching to berth. Because transportation of large portion of raw material and products of petrochemical industry is dealt with vessel, scheduling of vessel approaching to berth is important at the shore of large difference of tide. The final example would be scheduling problem to minimization of change over time of ABS semi products.

ASYMPTOTIC MAXIMUM PACKET SWITCH THROUGHPUT UNDER NONUNIFORM TRAFFIC

  • JEONG-HUN PARK
    • Management Science and Financial Engineering
    • /
    • v.4 no.2
    • /
    • pp.43-58
    • /
    • 1998
  • Packet switch is a key component in high speed digital networks. This paper investigates congestion phenomena in the packet switching with input buffers. For large value of switch size N, mathematical models have been developed to analyze asymptotic maximum switch throughput under nonuniform traffic. Simulation study has also been done for small values of finite N. The rapid convergence of the switch performance with finite switch size to asymptotic solutions implies that asymptotic analytical solutions approximate very closely to maximum throughputs for reasonably large but finite N. Numerical examples show that non-uniformity in traffic pattern could result in serious degradation in packet switch performance, while the maximum switch throughput is 0.586 when the traffic load is uniform over the output trunks. Window scheduling policy seems to work only when the traffic is relatively uniformly distributed. As traffic non-uniformity increases, the effect of window size on throughput is getting mediocre.

  • PDF

Design and Analysis of Motion Estimation Architecture Applicable to Low-power Energy Management Algorithm (저전력 에너지 관리 알고리즘 적용을 위한 하드웨어 움직임 추정기 구조 설계 및 특성 분석)

  • Kim Eung-Sup;Lee Chanho
    • Proceedings of the IEEK Conference
    • /
    • 2004.06b
    • /
    • pp.561-564
    • /
    • 2004
  • The motion estimation which requires huge computation consumes large power in a video encoder. Although a number of fast-search algorithms are proposed to reduce the power consumption, the smaller the computation, the worse the performance they have. In this paper, we propose an architecture that a low energy management scheme can be applied with several fast-search algorithm. In addition. we show that ECVH, a software scheduling scheme which dynamically changes the search algorithm, the operating frequency, and the supply voltage using the remaining slack time within given power-budget, can be applied to the architecture, and show that the power consumption can be reduced.

  • PDF