Proceedings of the Korean Operations and Management Science Society Conference
/
2002.05a
/
pp.418-425
/
2002
Bluetooth is an emerging technology expected to provide users with short range, low cost, pico-cellular wireless connectivity. The access to the medium for Bluetooth is based on a Master driven Time Division Duplexing (TDD) scheme. A slave transmits packets in the reverse slot only after the master polls the slave (or transmits a packet to the slave) in a forward slot. The master transmits packets to a slave in even slots while the slave transmits packets to the master in an odd slot. The way in which the master schedules packets transmission to slaves or polls them determines system performance. In this paper. we propose a traffic adaptive MAC scheduling scheme for Bluetooth. The proposed scheme adopts the ISAR (Intelligent Segmentation and Reassembly) policy, which adjusts the packet size to the traffic patterns, to adapt the polling frequency to the traffic conditions. Also for achieving fairness among master-slave connections our scheme includes a priority policy assinging prioritised service tlimes to each connection. By considering a scenario where a Bluetooth master is used as wireless access point to the Internet, we show that our scheme improve the system throughput and average queue delay with regard to a naive Round Robin (RR) scheme.
This study proposed subway construction information classification system based on civil engineering information classification system proposed by Korea Institute of Construction Technology. Also, Based on this criterion, This study established data modeling for NAS operating system Composed of construction information classification system - network - operation and presented an relational database integrated model. The data modeling method proposed in this study can be applied to other civil engineering facilities, so it can be operated as scientific NAS.
Wuttipornpun, Teeradej;Yenradee, Pisal;Beullens, Patrick;van Oudheusden, Dirk L.
Industrial Engineering and Management Systems
/
v.4
no.1
/
pp.23-35
/
2005
This paper aims to develop a practical finite capacity MRP (FCMRP) system based on the needs of an automotive parts manufacturing company in Thailand. The approach includes a linear goal programming model to determine the optimal start time of each operation to minimize the sum of penalty points incurred by exceeding the goals of total earliness, total tardiness, and average flow-time considering the finite capacity of all work centers and precedence of operations. Important factors of the proposed FCMRP system are penalty weights and dispatching rules. Effects of these factors on the performance measures are statistically analyzed based on a real situation of an auto-part factory. Statistical results show that the dispatching rules and penalty weights have significant effects on the performance measures. The proposed FCMRP system offers a good tradeoff between conflicting performance measures and results in the best weighted average performance measures when compared to conventional forward and forward-backward finite capacity scheduling systems.
Journal of the Korea Academia-Industrial cooperation Society
/
v.10
no.7
/
pp.1702-1710
/
2009
In this paper, we propose a problem space based search(PSBS) algorithm to solve parallel machine scheduling problem considering rework probabilities. For each pair of a machine and a job type, rework probability of each job on a machine can be known through historical data acquisition. Neighborhoods are generated by perturbing four problem data vectors (processing times, due dates, setup times, and rework probabilities) and evaluated through the efficient dispatching heuristic (EDDR). The proposed algorithm is measured by maximum lateness and the number of reworked jobs. We show that the PSBS algorithm is considerably improved from the result obtained by EDDR.
Jo, Dong-Wook;Kim, Jae-Kwon;Kim, Tae-Young;Oh, Hyun-Chang;Lee, Suk-Woo;Lee, Jong-Sik
Annual Conference of KIPS
/
2012.11a
/
pp.129-132
/
2012
클라우드 환경을 구성하는 자원을 능동적으로 사용 하기 위해서는 부하분산 정책이 필요하며 효율적으로 작업을 할당하고 공유할 수 있는 자원 관리 스케줄링이 필요하다. 또한 자원의 경제성을 유념하여 클라우드 서비스 제공자의 이익 창출과 자원 활용도의 개선을 실현해야하고 서비스 사용자의 만족도를 향상시켜야 한다. 본 논문에서는 계층형 부하분산 정책을 이용한 비용이익 기반 자원관리 스케줄링 모델(Cost-benefits Based Resource Management Scheduling Model using Hierarchical Load Balancing Policy)을 제안한다. 제안하는 모델은 계층형 부하분산 정책을 적용하여 자원을 통합, 관리함으로서 개선된 유지보수성을 제공하며, 서비스 제공자의 비용이익을 고려하여 각 자원들마다의 자원협상 메커니즘과 비용이익을 우선으로 하는 가격 결정 알고리즘을 제공하여 합리적인 자원 할당이 가능하다.
Journal of Korea Society of Digital Industry and Information Management
/
v.14
no.4
/
pp.1-7
/
2018
The floating sculptures in the form of ad-ballon commonly used ropes in order to hold on. Relatively air flow is much less indoor than outdoor. Users of buoyancy sculptures hope to be able to maintain their desired posture without being fixed. This study applied drone technology to buoyancy sculptures. The drones can be moved vertically and horizontally, and the posture can be maintained, so buoyancy sculptures are easy to apply. Therefore, we have studied the control system of buoyancy sculpture using drone technology. Also, a control system that can maintain the desired posture at a constant height was studied. The overall shape was a light fiber material and helium gas for zero buoyancy to support the sculpture. The system configuration was STM32F103CB from ARM. In addition, the gyro and acceleration, geomagnetic sensors and motors are composed of small and medium size BLDC motors. The scheduling of the control system in the configuration of the control device was carefully considered. Because the role of the whole component becomes very important. The communication between the components is divided into the sensor fusion and the interface communication with the whole controller. Each communication technology is designed to expand. This study was implemented to actively respond from the viewpoint of posture control using the drone technology.
Asia-Pacific Journal of Business Venturing and Entrepreneurship
/
v.7
no.4
/
pp.159-168
/
2012
The purpose of this study is to analyze the relationship of MOT and NPD performance in medium-sized manufacturing firms. To accomplish the purpose of the study, working hypotheses were established based on the literatures about the impacts of MOT factors on the NPD performance. The sample of this study is as follows : 12 electrical and electronics companies, 18 machine and engineering companies, 16 parts and materials companies. In order to verify hypotheses, the data were collected from team leader and manager of research center, R&D, and production department of these companies and the leader of R&D project team who all had experience in project or were participating in it in latest 3 years. The results of study were summarized as follows : First, in analysis on the reality of MOT factors in sample firms, will of top management level on the MOT was comparatively high but relatedness of business strategy and technology strategy, open R&D system, systematic time scheduling, management of R&D manpower, and developing and adapting PLM system were common level. Second, to improve NPD performance in medium-sized manufacturing firms, will of top management level on the MOT, relatedness of business strategy and technology strategy, open R&D system, systematic time scheduling, management of R&D manpower, and developing and adapting PLM system were intensively required.
Modern server systems are usually composed in the form of cluster systems in order to serve not only as many users but also as many kinds of applications as possible. The progression of the cluster system architecture leads in a middleware approach based on the Java framework. The middleware approach alleviates the efforts for the construction and the management of a server system but still preserves its performance and applications on the server. In this research, we introduce a new clustering scheme for the easy construction and maintenance of a cluster server system with the Java Management Extensions. We first demonstrate the construction and configuration process. Our experiment sets can verify that it is easy to construct, expand and manage a middleware based cluster system as well as the applications which reside on it. In addition, we can achieve reasonable performance on our service oriented clustered system with the help of state-of-the-art middleware. The experimental results of performance demonstration contain the availability of a server, and the effectiveness of load balancing and scheduling mechanisms. Especially, our service oriented scheduling mechanism was shown to successfully manage load imbalance under the normal load and cope with the overloaded situations, compared with other known scheduling mechanisms.
Proceedings of the Korea Committee for Ocean Resources and Engineering Conference
/
2004.05a
/
pp.96-100
/
2004
In the ship building industry various problems of erection is counterfeited due to formation of bottle necks in the block erection flow pattern This kind of problems cause accumulated problems in real-time erection right on the floor, When such a problem is approached, a support data of the entire erection sequence should be available, Here planning is done by reasoning about the future events in order to verify the existence of a reasonable series of actions to accomplish a goal. This technique helps in achieving benefits like handling search complications, in resolving goal conflicts and anticipation of bottleneck formation well in advance to take necessary countermeasures and boosts the decision support system, The data is being evaluated and an anticipatory function is to be developed This function is quite relevant in day to day planning operation. The system updates database with rearrangement of off-critical blocks in the erection sequence diagram, As a result of such a system, planners can foresee months ahead and can effectively make decisions regarding the control of loads on the man, machine and work flow pattern, culminating to an efficient load management. Such a foreseeing concept helps us in eliminating backtracking related adjustment which is less efficient compared to the look-ahead concept. An attempt is made to develop a computer program to update the database of block arrangement pattern based on heuristic formulation.
Journal of the Korea Institute of Building Construction
/
v.10
no.4
/
pp.31-39
/
2010
As the linear scheduling method has been used since the Empire State Building linear schedule in 1929, it is being applied in various fields, such as construction and manufacturing. When addressing concurrent critical paths occurring in a linear construction schedule, empirical researches have stressed resource management, which should be applied for optimizing workflow, ensuring flexible work productivity and continuous resource allocation. However, work relationships have been usually overlooked in making the linear schedule from an existing network schedule. Therefore, this research analyzes the previous researches related to the linear scheduling model, and then proposes a method that can be applied for adopting the relationships of a network schedule to the linear schedule. To this end, this research considers the work relationships occurring in changing a network schedule into a linear schedule, and then confirms the activities movement phenomenon of linear schedule due to workspace change, such as physical floors change. As a result, this research can be used as a basic research in order to develop a system generating a linear schedule from a network schedule.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.