• Title/Summary/Keyword: scheduling management

Search Result 1,293, Processing Time 0.021 seconds

Optimal Project Duration Estimation Through Enhanced Resource Leveling Technique (개선된 자원 평준화 기법을 활용한 적정 공기산정에 관한 연구)

  • Yoon Yung-Sang;Kim Kyung-Hwan;Kim Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.575-578
    • /
    • 2004
  • Since a construction project is a series of works that utilizes resources to accomplish the project goal for a given time period, efficient resource management is a prerequisite for the success of the project. Two major areas of resource management are resource constrained scheduling focusing on the limited resource availability and resource leveling focusing on smoothing resource usage pattern on the fixed project completion time. It is not available, however, to apply both techniques to a project at the same time. This paper proposes a model to enhance the minimum moment algorithm of resource leveling, aiming to find an efficient usage of resources and an appropriate project completion time. A survey is performed to evaluate the major five factors using the AHP.

  • PDF

Design and Operation of Value Stream Mapping (VSM 설계와 운영방안)

  • Choi, Sung-Woon;Lee, Chang-Ho
    • Journal of the Korea Safety Management & Science
    • /
    • v.8 no.6
    • /
    • pp.149-157
    • /
    • 2006
  • This paper suggests the design and operation of value stream mapping(VSM) applied to project management, such as R&D, IT Investment. First this study represents design methodology of VSM process using SIPOC(Supplier, Input, Process, Output, Costumer). Second, this paper considers the identification and improvement plan about non-added value time for VSM using FPC(Flow Process Chart) and PERT/CPM. Last, this paper proposes VSM scheduling method using PERT/CPM and CCPM(Critical Chain Project Management)

Development of Optimal Bus Scheduling Algorithm with Multi-constraints (다중제약을 고려한 최적 버스운행계획 알고리즘 개발)

  • Lee, Ho-Sang;Park, Jong-Heon;Jo, Seong-Hun;Yun, Byeong-Jo
    • Journal of Korean Society of Transportation
    • /
    • v.24 no.7 s.93
    • /
    • pp.129-138
    • /
    • 2006
  • After Seoul has introduced semi-public bus management system(public management-private operation), the Seoul Metro Government needs a scientific management tool for optimal scheduling for bus routes, to reduce unnecessary operations and provide demand responsive service. As a product of this effort, this paper proposes a heuristic model that could minimize total passenger waiting time under the constraints, such as number of vehicles, working conditions, max load point, minimax headway. etc. For verifying the validity of the proposed model, it is applied to an existing bus route. It results that headways in rush hours become decreased and the passenger waiting time could be decreased. In conclusion. it is thought that the Proposed model contributes to efficiency of bus operation.

Forest Management Planning by Linear Programming - Timber Harvest Scheduling of a Korean Pine stand - (Linear Programming에 의한 삼림경영계획(森林經營計劃) - 잣나무임분(林分)의 삼림수확계획(森林收穫計劃)을 중심으로 -)

  • Woo, Jong Choon
    • Journal of Korean Society of Forest Science
    • /
    • v.80 no.4
    • /
    • pp.427-435
    • /
    • 1991
  • Linear programming(LP) is a well-known method in optimizing timber harvest schedules. This paper describes a linear programming formulation of korean pine stands for timber harvest scheduling problems. Simulation technique and LP were applied to optimize the time and space distribution of the sustained yield for the 10-year forest management planning horizon. Growthfunction of korean pine stands in study area was derived with the yield table. This growthfunction was contained to the simulation model in estimating of changing stand volume conditions for the planning horizon. These estimated values were served as the basic data of LP model, and LP model was formulated with the maximum of periodical harvest volume calculated by the classical yield regulation method (Paulsen-Hundeshagen formula) and the maximum of periodical harvest area calculated for the normal age distribution. The timber harvest schedule was established periodically for each subcompartment of korean pine stands in experiment forest of College of Forestry in Kangweon National University with the here developed LP model.

  • PDF

Risk Management System based on Grid Computing for the Improvement of System Efficiency (시스템 효율성 증대를 위한 그리드 컴퓨팅 기반의 위험 관리 시스템)

  • Jung, Jae-Hun;Kim, Sin-Ryeong;Kim, Young-Gon
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.16 no.1
    • /
    • pp.283-290
    • /
    • 2016
  • As the development of recent science and technology, high-performance computing resources is needed to solve complex problems. To reach these requirements, it has been actively studied about grid computing that consist of a huge system which bind a heterogeneous high performance computing resources into on which are geographically dispersed. However, The current research situation which are the process to obtain the best results in the limited resources and the scheduling policy to accurately predict the total execution time of the real-time task are very poor. In this paper, in order to overcome these problems, we suggested a grid computing-based risk management system which derived from the system structure and the process for improving the efficiency of the system, grid computing-based working methodology, risk policy module which can manage efficiently the problem of the work of resources(Agent), scheduling technique and allocation method which can re-allocate the resource allocation and the resources in problem, and monitoring which can manage resources(Agent).

An Inspection/Maintenance Job Scheduling Management Method by Using Location Information based on Wi-Fi AP Connection History (Wi-Fi AP 접속 기록 기반 위치 정보를 이용한 점검/유지보수 작업 스케줄 관리 방법)

  • Gu, Bongen
    • Journal of Platform Technology
    • /
    • v.9 no.4
    • /
    • pp.51-59
    • /
    • 2021
  • In this paper, we propose a location-based service that the user's location is known by connection history to WI-FI AP installed in a facility known its location previously. The location-based service proposed in this paper manages job processing states of technicians who inspect and maintain the facility like elevator by using worker's location and arrival time information. The job scheduling management method proposed in this paper is based on previously scheduled arrival time and actual arrival time to a target facility. And we experimentally implemented the inspection and maintenance system of an elevator to show the feasibility of job schedule management based on location and arrival time information acquired from Wi-Fi AP connection history. Our experimental implementation shows that our proposed method is usefulness in the field of the inspection and maintenance of a facility.

An Inspection/Maintenance Job Scheduling Management Method by Using Location Information based on Wi-Fi AP Connection History (Wi-Fi AP 접속 기록 기반 위치 정보를 이용한 점검/유지보수 작업 스케줄 관리 방법)

  • Gu, Bongen
    • Journal of Platform Technology
    • /
    • v.10 no.1
    • /
    • pp.11-19
    • /
    • 2022
  • In this paper, we propose a location-based service that the user's location is known by connection history to WI-FI AP installed in a facility known its location previously. The location-based service proposed in this paper manages job processing states of technicians who inspect and maintain the facility like elevator by using worker's location and arrival time information. The job scheduling management method proposed in this paper is based on previously scheduled arrival time and actual arrival time to a target facility. And we experimentally implemented the inspection and maintenance system of an elevator to show the feasibility of job schedule management based on location and arrival time information acquired from Wi-Fi AP connection history. Our experimental implementation shows that our proposed method is usefulness in the field of the inspection and maintenance of a facility.

Scheduling Risk Management at the Preconstruction Phase (공사 착공 전 단계의 공정리스크 대응방안)

  • Park Ji-Hoon;Kim Sun-Kuk;Han Choong-He
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.457-461
    • /
    • 2004
  • The insufficient management o( the risk of preconstruction phase causes the risk of construction phase so it makes bad effects such as the extension of construction time and raising of cost. Therefore, the management of the risk of preconstruction phase is being considered as an important element of success of project and the competitive power of construction companies. This study Is to suggest solution methods for each progress after examining reasons of the risk for the management of the risk of preconstruction phase 1'he progress is limited as earth work, RC work, steel work and curtain wall work. Through the introduction of Knowledge Management system, work flow is made by specialist of each part. The reasons of the risk of progress are chosen through the analysis of work flow and I suggest detailed solutions such as person in charge, the starting point of progress and the information of requirements according to the grade of importance about elements of the risk

  • PDF

Predicting Construction Project Cost using Sensitivity Analysis in Stochastic Project Scheduling Simulation (SPSS) (확률 통계적 일정 시뮬레이선 - 민감도 분석을 이용한 최종 공사비 예측)

  • Lee Dong-Eun;Park Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.4 s.26
    • /
    • pp.80-90
    • /
    • 2005
  • Activity durations retain probabilistic and stochastic natures due to diverse factors causing the delay or acceleration of activity completion. These natures make the final project duration to be a random variable. These factors are the major source of financial risk. Extending the Stochastic Project Scheduling Simulation system (SPSS) developed in previous research; this research presents a method to estimate how the final project duration behaves when activity durations change randomly. The final project cost is estimated by considering the fluctuation of indirect cost, which occurs due to the delay or acceleration of activity completion, along with direct cost assigned to an activity. The final project cost is estimated by considering how indirect cost behaves when activity duration change. The method quantifies the amount of contingency to cover the expected delay of project delivery. It is based on the quantitative analysis to obtain the descriptive statistics from the simulation outputs (final project durations). Existing deterministic scheduling method apply an arbitrary figures to the amount of delay contingency with uncertainty. However, the stochastic method developed in this research allows computing the amount of delay contingency with certainty and certain degree of confidence. An example project is used to illustrate the quantitative analysis method using simulation. When the statistical location and shape of probability distribution functions defining activity durations change, how the final project duration and cost behave are ascertained using automated sensitivity analysis method