• Title/Summary/Keyword: scheduling management

Search Result 1,280, Processing Time 0.03 seconds

A Nurse Scheduling Support System (간호인력 배치 시스템)

  • Choi, Yong-Sun;Park, Jung-Ho;Park, Hyeoun-Ae;Cho, Hyun;Han, Hae-Ra
    • Journal of Korean Academy of Nursing Administration
    • /
    • v.2 no.2
    • /
    • pp.73-83
    • /
    • 1996
  • Scheduling for nursing personnel involves many factors and requirements. Therefore, manual scheduling requires much time and effort to produce an adequate schedule. This paper introduces a PC based nurse scheduling support system which was developed in Microsoft Access 2.0, an easy to use data base management tool. First step of this system is to determine necessary number of nursing personnel by medical law or by patient classification. Current Korean medical law stipulates that number of patients attended by a nurse is 2.5 for hospitalization. In addition, necessary nursing personnel by patient classification was determined four nurses for seven patients in this system based on the authors' preliminary study. And the second step is to assign daily duty type for each nurse at every nursing unit automatically. The introduced system fully utilizes the GUI environment of Microsoft Windows and even makes the computer-novice nurses feel comfortable in using the system. This system can help nursing administrators improve nurse scheduling in a way of quick and easy schedule generation for the future, and allow nurses more time for patient care.

  • PDF

A Study on Multi-criteria Trade-off Structure between Throughput and WIP Balancing for Semiconductor Scheduling (반도체/LCD 스케줄링의 다목적기준 간 트레이드 오프 구조에 대한 연구)

  • Kim, Kwanghee;Chung, Jaewoo
    • Korean Management Science Review
    • /
    • v.32 no.4
    • /
    • pp.69-80
    • /
    • 2015
  • The semiconductor industry is one of those in which the most intricate processes are involved and there are many critical factors that are controlled with precision in those processes. Naturally production scheduling in the semiconductor industry is also very complex and studied by the industry and academia for many years; however, still there are many issues left unclear in the problem. This paper proposes an multi-objective optimization-based scheduling method for semiconductor fabrication(fab). Two main objectives are throughput maximization and meeting target production quantities. The first objective aims to reduce production cost, especially the fixed cost incurred by a large investment constructing a new fab facility. The other is meeting customer orders on time and also helps a fab maintain stable throughput through controlled WIP balancing in the long run. The paper shows a trade-off structure between the two objectives through experimental studies, which provides industrial practitioners with useful references.

Customer Order Scheduling Problems with a Fixed Machine-Job Assignment

  • Yang, Jae-Hwan;Rho, Yoo-Mi
    • Management Science and Financial Engineering
    • /
    • v.11 no.2
    • /
    • pp.19-43
    • /
    • 2005
  • This paper considers a variation of the customer order scheduling problem, and the variation is the case where the machine-job assignment is fixed. We examine the parallel machine environment, and the objective is to minimize the sum of the completion times of the batches. While a machine can process only one job at a time, different machines can simultaneously process different jobs in a batch. The recognition version of this problem is known to be NP-complete in the strong sense even if there exist only two parallel machines. When there are an arbitrary number of parallel machines, we establish three lower bounds and develop a dynamic programming (DP) algorithm which runs in exponential time on the number of batches. We present two simple but intuitive heuristics, SB and GR, and find some special cases where SB and GR generate an optimal schedule. We also find worst case upper bounds on the relative error. For the case of the two parallel machines, we show that GR generates an optimal schedule when processing times of all batches are equal. Finally, the heuristics and the lower bounds are empirically evaluated.

Task Scheduling Technique for Energy Efficiency in Wireless Sensor Networks (무선 센서 네트워크 환경에서의 에너지 효율성을 고려한 태스크 스케줄링 기법)

  • Lee Jin-Ho;Choi Hoon;Baek Yun-Ju
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.31 no.9A
    • /
    • pp.884-891
    • /
    • 2006
  • A wireless sensor node is typically battery operated and energy constrained. Therefore it is critical to design efficient power management technique and scheduling technique. In this paper, we propose an OS-level power management technique for energy saving of wireless sensor node, it is called EA-SENTAS (Energy-Aware Sensor Node TAsk Scheduling). It can decrease the energy consumption of a wireless sensor node to use task scheduling technique that shut down components or use low power mode of each component when not needed. Simulation results show that EA-SENTAS saves energy up to 56 percent to compare with conventional duty cycle.

A Study of the Identify about Scheduling Process at Owner's Position (IDEF 방법론을 이용한 발주자 공정관리 프로세스 규명에 관한 연구)

  • Lee Tai Sik;Kim Young Hyun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.454-457
    • /
    • 2001
  • All of the partner must manage continually scheduling for the successful project in construction. Besides, that is not a important only contracter's managing but also owner's managing which is a very important about project finishing in time. Especially, in the case of mega project, the owner has to manage progress of scheduling to control contractor. And the case of progress to delay or to change, owner, contractor, and inspector must make a plan of recovery scheduling. This study proposes a construction process model from IDEF Methodology.

  • PDF

Scheduling of Real-time and Nonreal-time Traffics in IEEE 802.11 Wireless LAN (무선랜에서의 실시간 및 비실시간 트래픽 스케줄링)

  • Lee, Ju-Hee;Lee, Chae Y.
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.28 no.2
    • /
    • pp.75-89
    • /
    • 2003
  • Media Access Control (MAC) Protocol in IEEE 802.11 Wireless LAN standard supports two types of services, synchronous and asynchronous. Synchronous real-time traffic is served by Point Coordination Function (PCF) that implements polling access method. Asynchronous nonreal-time traffic is provided by Distributed Coordination Function (DCF) based on Carrier Sense Multiple Access with Collision Avoidance (CSMA/CA) protocol. Since real-time traffic is sensitive to delay, and nonreal-time traffic to error and throughput, proper traffic scheduling algorithm needs to be designed. But it is known that the standard IEEE 802.11 scheme is insufficient to serve real-time traffic. In this paper, real-time traffic scheduling and admission control algorithm is proposed. To satisfy the deadline violation probability of the real time traffic the downlink traffic is scheduled before the uplink by Earliest Due Date (EDD) rule. Admission of real-time connection is controlled to satisfy the minimum throughput of nonreal-time traffic which is estimated by exponential smoothing. Simulation is performed to have proper system capacity that satisfies the Quality of Service (QoS) requirement. Tradeoff between real-time and nonreal-time stations is demonstrated. The admission control and the EDD with downlink-first scheduling are illustrated to be effective for the real-time traffic in the wireless LAN.

A Study of Flight Scheduling Problem on Fighter Squadron (전투비행대대 비행스케줄링에 관한 연구)

  • Lee, Moongul;Seo, Sanghoon
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.39 no.2
    • /
    • pp.37-48
    • /
    • 2014
  • Fighter squadron flight scheduling is the integrated air operation plan that is an important role for improving pilot's flight skill and maintaining combat readiness by efficient using available all air resources including pilot, aircrafts, air-weapons, fuel and supporting facilities etc. Korea airforce, however, has a limit as to an effective flight operation due to manual flight scheduling with scheduler's own experience and intuition. Therefore, in our study, we propose the optimization model of flight scheduling based on mixed integer programming. This model includes several constraints of realistic and essential quantified data related with flight schedule and can assign appropriate pilots optimally which are distinctive three type's solutions : flight, alert and duty crew schedules. Proposed solution method can be improved pilot's capability and allocated further air resources systematically and efficiently. In addition, it can be reduced a workload of flight scheduler and minimized obstructed factors of flight safety. Finally, we demonstrate the experiment's results for the check of efficiency and validity of this model.

IMPROVING THE USABILITY OF STOCHASTIC SIMULATION BASED SCHEDULING SYSTEM

  • Tae-Hyun Bae;Ryul-Hee Kim;Kyu-Yeol Song;Dong-Eun Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.393-399
    • /
    • 2009
  • This paper introduces an automated tool named Advanced Stochastic Schedule Simulation System (AS4). The system automatically integrates CPM schedule data exported from Primavera Project Planner (P3) and historical activity duration data obtained from a project data warehouse, computes the best fit probability distribution functions (PDFs) of historical activity durations, assigns the PDFs identified to respective activities, computes the optimum number of simulation runs, simulates the schedule network for the optimum number of simulation runs, and estimates the best fit PDF of project completion times (PCTs). AS4 improves the reliability of simulation-based scheduling by effectively dealing with the uncertainties of the activities' durations, increases the usability of the schedule data obtained from commercial CPM software, and effectively handles the variability of the PCTs by finding the best fit PDF of PCTs. It is designed as an easy-to-use computer tool programmed in MATLAB. AS4 encourages the use of simulation-based scheduling because it is simple to use, it simplifies the tedious and burdensome process involved in finding the PDFs of the many activities' durations and in assigning the PDFs to the many activities of a new network under modeling, and it does away with the normality assumptions used by most simulation-based scheduling systems in modeling PCTs.

  • PDF

Cradle to Gate Emissions Modeling for Scheduling of Construction Projects

  • Sharma, Achintyamugdha;Deka, Priyanka;Jois, Goutam;Jois, Umesh;Tang, Pei
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.975-983
    • /
    • 2022
  • This paper presents an innovative way of integrating scheduling and project controls with the environmental impact of a construction project to track, monitor, and manage environmental emissions at the activity level. As a starting point, scheduling and project controls help monitor the status of a project to provide an assessment of the duration and sequence of activities. Additionally, project schedules can also reflect resource allocation and costs associated with various phases of a construction project. Owners, contractors and construction managers closely monitor tasks or activities on the critical path(s) and/or longest path(s) calculated through network based scheduling techniques. However, existing industry practices do not take into account environmental impact associated with each activity during the life cycle of a project. Although the environmental impact of a project may be tracked in various ways, that tracking is not tied to the project schedule and, as such, generally is not updated when schedules are revised. In this research, a Cradle to Gate approach is used to estimate environmental emissions associated with each activity of a sample project schedule. The research group has also investigated the potential determination of scenarios of lowest environmental emissions, just as project managers currently determine scenarios with lowest cost or time. This methodology can be scaled up for future work to develop a library of unit emissions associated with commonly used construction materials and equipment. This will be helpful for project owners, contractors, and construction managers to monitor, manage, and reduce the carbon footprint associated with various projects.

  • PDF

Optimal Scheduling based on Probabilitic Estimation of Construction Duration (확률적 공기산정에 의한 공정 합리화 방안)

  • Kim Sang-Joong;Lee Jae-Soeb
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.383-387
    • /
    • 2003
  • Construction project has many problem such as delay of the appointed date delivery, over budget, wether and site conditions. When several activities are influenced by the same factor, their duration may be delayed. This paper deals with the problem of construction duration estimating and schedule variation on the construction project. The theory of constraints technique for project management is referred to 'Critical Chain' technique. This paper shows optimal scheduling plan and time management technique, used probability construction duration estimating and scheduling buffer based on the critical chain project management.

  • PDF