Simulation Modeling for Production Scheduling under Make-To-Order Production Environment : Focusing on the Flat Glass Production Environment (주문생산 방식의 생산계획 수립을 위한 시뮬레이션 모델 설계 : 판유리 제조 공정을 중심으로)

  • Choi, Yong-Hee;Hwang, Seung-June
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.42 no.1
    • /
    • pp.64-73
    • /
    • 2019
  • The manufacturing companies under Make-To-Order (MTO) production environment face highly variable requirements of the customers. It makes them difficult to establish preemptive production strategy through inventory management and demand forecasting. Therefore, the ability to establish an optimal production schedule that incorporates the various requirements of the customers is emphasized as the key success factor. In this study, we suggest a process of designing the simulation model for establishing production schedule and apply this model to the case of a flat glass processing company. The flat glass manufacturing industry is under MTO production environment. Academic research of flat glass industry is focused on minimizing the waste in the cutting process. In addition, in the practical view, the flat glass manufacturing companies tend to establish the production schedule based on the intuition of production manager and it results in failure of meeting the due date. Based on these findings, the case study aims to present the process of drawing up a production schedule through simulation modeling. The actual data of Korean flat glass processing company were used to make a monthly production schedule. To do this, five scenarios based on dispatching rules are considered and each scenario is evaluated by three key performance indicators for delivery compliance. We used B2MML (Business To Manufacturing Markup Language) schema for integrating manufacturing systems and simulations are carried out by using SIMIO simulation software. The results provide the basis for determining a suitable production schedule from the production manager's perspective.

An Optimization Model for O&M Planning of Floating Offshore Wind Farm using Mixed Integer Linear Programming

  • Sang, Min-Gyu;Lee, Nam-Kyoung;Shin, Yong-Hyuk;Lee, Chulung;Oh, Young-Jin
    • Journal of the Korea Society of Computer and Information
    • /
    • v.26 no.12
    • /
    • pp.255-264
    • /
    • 2021
  • In this paper, we propose operations and maintenance (O&M) planning approach for floating offshore wind farm using the mathematical optimization. To be specific, we present a MILP (Mixed Integer Linear Programming that suggests the composition of vessels, technicians, and maintenance works on a weekly basis. We reflect accessibility to wind turbines based on weather data and loss of power generation using the Jensen wake model to identify downtime cost that vary from time to time. This paper also includes a description of two-stage approach for maintenance planning & detailed scheduling and numeric analysis of the number of vessels and technicians on the O&M cost. Finally, the MILP model could be utilized in order to establish the suitable and effective maintenance planning reflecting domestic situation.

Electronic Data Interchange Framework for Financial Management System

  • Aldowesh, Nora;Alfaleh, Aljawharah;Alhejazi, Manal;Baghdadi, Heyam;Atta-ur-Rahman, Atta-ur-Rahman
    • International Journal of Computer Science & Network Security
    • /
    • v.22 no.6
    • /
    • pp.275-287
    • /
    • 2022
  • As a result, for the increasing expansion by the university faculties in the field of postgraduate studies, The Deanship of Graduate Studies at the university has been established in 1430 AH/2009 CE to specifically address the needs of the current and prospective graduate population to supervise postgraduate studies programs in coordination with the concerned faculties. This comes as a result for the university being certain of the importance of providing postgraduate studies opportunities that follow the bachelor's degree to qualify our ambitious youth appropriately. The University offers 72 different Graduate programs, awarding doctoral and master's degrees along with fellowships and diplomas in various disciplines like health, engineering, science, literary, and educational. Currently, the financial model for admission and students' payment is manual and paper based. This paper proposes to provide a user interface for Financial Management in Deanship of Graduate studies The basic purpose of the system was to minimize human interference and reduce mistakes placed by human interference, also to have efficient and a fast performance, and perform Electronic Data Interchange (EDI) for various tasks such as billing and scheduling details.

A Study on Power Trading Methods for in a Hydrogen Residential Model (수소주거모델의 전력 거래 참여 방안 고찰)

  • KISEOK JEONG;TAEYOUNG JYUNG
    • Transactions of the Korean hydrogen and new energy society
    • /
    • v.34 no.2
    • /
    • pp.91-99
    • /
    • 2023
  • Participation in power trading using surplus power is considered a business model active in the domestic energy trade market, but it is limited only if the legal requirements according to the type, capacity, and use of the facilities to be applied for are satisfied. The hydrogen residential demonstration model presented in this paper includes solar power, energy storage system (ESS), fuel cell, and water electrolysis facilities in electrical facilities for private use with low-voltage power receiving system. The concept of operations strategy for this model focuses on securing the energy self-sufficiency ratio of the entire system, securing economic feasibility through the optimal operation module installed in the energy management system (EMS), and securing the stability of the internal power balancing issue during the stand-alone mode. An electric facility configuration method of a hydrogen residential complex demonstrated to achieve this operational goal has a structure in which individual energy sources are electrically connected to the main bus, and ESS is also directly connected to the main bus instead of a renewable connection type to perform charging/discharging operation for energy balancing management in the complex. If surplus power exists after scheduling, participation in power trading through reverse transmission parallel operation can be considered to solve the energy balancing problem and ensure profitability. Consequentially, this paper reviews the legal regulations on participation in electric power trading using surplus power from hydrogen residential models that can produce and consume power, gas, and thermal energy including hybrid distributed power sources, and suggests action plans.

Study of Reliability Analysis Based Power Generation Facilities Maintenance System - Focused on Continuous Ship Unloader - (신뢰성 분석 기반 발전설비 점검계획 수립 시스템 연구- 석탄 하역기를 중심으로 -)

  • Hwang Seong Hwan;Kim Yu Rim;Kang Sung Woo
    • Journal of Korean Society for Quality Management
    • /
    • v.51 no.2
    • /
    • pp.315-327
    • /
    • 2023
  • Purpose: Recently, research has continued to predict the time of failure of the facility through measurement data obtained by attaching a sensor to the facility. However, depending on the facility, it may be difficult to attach a sensor. The purpose of this study is to propose a power generation maintenance plan system based on failure record data obtained from Continuous Ship Unloader, one of the facilities that is difficult to attach sensors. Methods: This study uses data collected from 2012 to 2022 from the 'CSU-1B' model among Continuous Ship Unloader operated by Korea Midland Power Co., LTD. By fitting fault record data to the Weibull distribution, appropriate maintenance cycles and ranges for each target facility subsystem are derived. In addition, maintenance group between subsystems is selected through Euclidean distance, a metric often used for time series data similarity. Through this, a system for establishing an maintenance plan for power generation facilities is proposed. Results: The results of this study are as follows. For the 17 subsystems of the Continuous Ship Unloader, proper maintenance cycles and ranges were determined, and a total of four maintenance groups were chosen. This resulted in the creation of an power generation maintenance plan system and the establishment of an maintenance plan. Conclusion: This study is a case study of power generation facilities. We proposed a maintenance plan system for Continuous Ship Unloader among power generation facilities.

A Prototype of Distributed Simulation for Facility Restoration Operation Analysis through Incorporation of Immediate Damage Assessment

  • Hwang, Sungjoo;Choi, MinJi;Starbuck, Richmond;Lee, SangHyun;Park, Moonseo
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.339-343
    • /
    • 2015
  • To rapidly recover ceased functionality of a facility after a catastrophic seismic event, critical decisions on facility repair works are made within a limited period of time. However, prolonged damage assessment of facilities, due to massive damage in the surrounding region and the complicated damage judgment procedures, may impede restoration planning. To assist reliable structural damage estimation without a deep knowledge and rapid interactive analysis among facility damage and restoration operations during the approximate restoration project planning phase, we developed a prototype of distributed facility restoration simulations through the use of high-level architecture (HLA) (IEEE 1516). The simulation prototype, in which three different simulations (including a seismic data retrieval technique, a structural response simulator, and a restoration simulation module) interact with each other, enables immediate damage estimation by promptly detecting earthquake intensity and the restoration operation analysis according to estimated damage. By conducting case simulations and experiments, research outcomes provide key insights into post-disaster restoration planning, including the extent to which facility damage varies according to disaster severity, facility location, and structures. Additional insights arise regarding the extent to which different facility damage patterns impact a project's performance, especially when facility damage is hard to estimate by observation. In particular, an understanding of required type and amount of repair activities (e.g., demolition works, structural reinforcement, frame installation, or finishing works) is expected to support project managers in approximate work scheduling or resource procurement plans.

  • PDF

A hybrid genetic algorithm for the optimal transporter management plan in a shipyard

  • Jun-Ho Park;Yung-Keun Kwon
    • Journal of the Korea Society of Computer and Information
    • /
    • v.28 no.12
    • /
    • pp.49-56
    • /
    • 2023
  • In this study, we propose a genetic algorithm (GA) to optimize the allocation and operation order of transporters. The solution in the GA is represented by a set of lists each of which the operation order of the corresponding transporter. In addition, it was implemented in the form of a hybrid genetic algorithm combining effective local search operations for performance improvement. The local search reduces the number of operating transporters by moving blocks from a transporter with a low workload into that with a high workload. To evaluate the effectiveness of the proposed algorithm, it was compared with Multi-Start and a pure genetic algorithm through a simulation environment similar in scale to an actual shipyard. For the largest problem, compared to them, the number of transporters was reduced by 40% and 34%, and the total task time was reduced by 27% and 17%, respectively.

A methodology for an effective utilization of construction equipment for highway construction projects (도로공사 공정계획을 위한 공정 로직 및 건설장비 효율화 방안)

  • Song, Hojeong;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.6
    • /
    • pp.26-34
    • /
    • 2014
  • Highway construction is a combination of linear, repetitive, and highly equipment intensive operations. Various types of construction equipment are deployed to ensure undisrupted performance of construction, and thus productivity improvement and cost-saving can be achieved through well-thought-out planning. The selection of construction equipment is dependent upon construction sequence, site conditions, and construction methods. In the process of planning, management should consider various types of construction methods per each type of construction operation. Also, management should map out proper construction equipment operation plan that takes the construction duration and cost measures into consideration. However, limited availability of historic data from the similar types of operations has been a stumbling block to proper construction planning, making the operations performed based upon experience and intuition guided by rules-of-thumb. As a consequence, the planing phase rarely provided an adequate validity in the implementation phase. The researchers developed a process logic for each construction type that management can utilize from early phase of highway construction planning process. Moreover, derived the construction equipment combination optimized for efficiency by using the process simulation technique. The developed method is expected to be useful for the decision-making process that aims to evaluate efficiency of various process plans and to ensure optimal selection of construction equipment for highway construction projects.

Large-scale Virtual Power Plant Management Method Considering Variable and Sensitive Loads (가변 및 민감성 부하를 고려한 대단위 가상 발전소 운영 방법)

  • Park, Yong Kuk;Lee, Min Goo;Jung, Kyung Kwon;Lee, Yong-Gu
    • Journal of the Institute of Electronics and Information Engineers
    • /
    • v.52 no.5
    • /
    • pp.225-234
    • /
    • 2015
  • Nowadays a Virtual Power Plant (VPP) represents an aggregation of distributed energy resource such as Distributed Generation (DG), Combined Heat and Power generation (CHP), Energy Storage Systems (ESS) and load in order to operate as a single power plant by using Information and Communication Technologies, ICT. The VPP has been developed and verified based on a single virtual plant platform which is connected with a number of various distributed energy resources. As the VPP's distributed energy resources increase, so does the number of data from distributed energy. Moreover, it is obviously inefficient in the aspects of technique and cost that a virtual plant platform operates in a centralized manner over widespread region. In this paper the concept of the large-scale VPP which can reduce a error probability of system's load and increase the robustness of data exchange among distributed energy resources will be proposed. In addition, it can directly control and supervise energy resource by making small size's virtual platform which can make a optimal resource scheduling to consider of variable and sensitive load in the large-scale VPP. It makes certain the result is verified by simulation.

A development of an Optimization-Based Flight Scheduler and Its Simulation-Based Application to Real Airports (최적화 기법 기반의 항공기 스케줄러 개발 및 실제 공항의 수치적 모사)

  • Ryu, MinSeok;Song, Jae-Hoon;Choi, Seongim
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.41 no.9
    • /
    • pp.681-688
    • /
    • 2013
  • Several problems caused by inevitable increment of airplane have been issued. The most effective solution to solve the issues is considered as establishing appropriate Air Traffic Management (ATM) that reduces aircraft's delay at an airport and intensify the airport's capacity. The purpose of this paper is to produce the optimum aircraft schedules that maximize the aircraft throughput by smooth air traffic flow near terminal area of an airport In this paper, mathematical formulations of the scheduling problem are firstly specified. Based on the mathematical modelling, an Optimization-Based Flight Scheduler that provides the optimum flight schedules for arriving aircraft is developed by introducing the Mixed Integer Linear Programming(MILP) and the Genetic Algorithms(GA). With this scheduler, we calculated the optimum schedules to compare to real schedule data from an Incheon Airport. As a result, it is validated that aircraft throughput produced by the optimum schedule is much better than that of the schedule from the Incheon airport. The optimization-based flight scheduler is expected to deal with problems due to the aircraft saturation in near future.