• Title/Summary/Keyword: scheduling management

Search Result 1,280, Processing Time 0.028 seconds

BIM-BASED PLANNING OF TEMPORARY FACILITIES FOR CONCRETE CONSTRUCTION

  • Kyungki Kim;Jochen Teizer
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.1-6
    • /
    • 2013
  • Concrete construction requires utilization of many temporary facilities such as formwork, shoring, and scaffolding. Appropriate use of these temporary facilities greatly impacts the quality, cost, schedule, and safety of concrete construction. The current practice in design and planning of temporary facilities is often manual, error-prone, and re-active based on construction site layout, status, and progress in the field. Early design and planning of temporary facilities for concrete construction using Building Information Modeling (BIM) technology offers a potential solution. Although some commercially-available software exists that assists in the generation of temporary facility designs, the construction industry lacks tools that support detailed planning and design of many other temporary facilities. This research presents our early work in automating the design and planning of temporary facilities utilizing BIM. Algorithms were developed to automatically assess geometric conditions of work space to detect required temporary facilities and design them. The proposed methodology was implemented in a test model. By automatically incorporating temporary facilities into BIM, more realistic construction models can be created with less effort and errors. Temporary facilities-loaded models can finally be used for communication, bill of materials, scheduling, etc. and as a benchmark for field installation of temporary formwork, shoring, and scaffolding systems.

  • PDF

Analysis and Estimation of Reservoir Sedimentation Using Remote Sensing and GIS

  • Sungmin Cho
    • International Journal of Internet, Broadcasting and Communication
    • /
    • v.15 no.4
    • /
    • pp.199-204
    • /
    • 2023
  • Periodic assessment of reservoir capacity is essential for better water resources management and planning for the future water use. Reservoirs and water storage structures raised on the rivers are subjected to sedimentation and he sedimentation is caused by deposition of eroded sediment particles carried by the streams. Knowledge of reservoir sedimentation is important to estimate avaliable storage capacity for optimum reservoir operation and scheduling water release. In recent years, remote sensing and GIS techniques have emerged as an important tool in carrying out reservoir capacity analysis and water management. The reduction in storage capacity as compared to the original capacity at the time of reservoir impounding is indicative of sediment deposition. In this study, the application of GIS and remote sensing techniques were applied to assess the sediment deposition, losses in the reservoir storage and the revised cumulative capacity. Satellite images covering Pyodongdong reservoir were analyzed using Erdas Imagine and ArcGIS softwares.Cumulative capacities at different levels were also calculated and we estimated that the revised live storage was 84.2Mft3 in 2021 and 64.3Mft3 in 2022 while the original capacity was 22.8 and 53.6Mft3 in 2021 and 2022.

Resolving Cycle Extension Overhead Multimedia Data Retrieval

  • Won, Youjip;Cho, Kyungsun
    • Transactions on Control, Automation and Systems Engineering
    • /
    • v.4 no.2
    • /
    • pp.164-168
    • /
    • 2002
  • In this article, we present the novel approach of avoiding temporal insufficiency of data blocks, jitter, which occurs due to the commencement of new session. We propose to make the sufficient amount of data blocks available on memory such that the ongoing session can survive the cycle extension. This technique is called ″pre-buffering″. We examine two different approaches in pre-buffering: (i) loads all required data blocks prior to starting playback and (ii) incrementally accumulates the data blocks in each cycle. We develop an elaborate model to determine the appropriate amount of data blocks necessary to survive the cycle extension and to compute startup latency involved in loading these data blocks. The simulation result shows that limiting the disk bandwidth utilization to 60% can greatly improve the startup latency as well as the buffer requirement for individual streams.

Mathematical Model of Aquaculture Facility Utilization (양식장 이용에 대한 수학적 모형)

  • Eh, Youn-Yang
    • Journal of Fisheries and Marine Sciences Education
    • /
    • v.26 no.2
    • /
    • pp.444-454
    • /
    • 2014
  • The range of optimization problem in aquaculture is very wide, resulting from the range of species, mode of operation. Quite a few studies focus marine net-cages, but studies on land based culture farm are few or no. This paper considers a allocation problem to meet production planning in land based aquaculture system. A water pool allocation model in land based aquaculture system was developed. The solution finds the value of decision variable to minimize yearly production costs that sums up the water pool usage cost and sorting cost. The model inputs were (1) the fish growth rate (2) critical standing corp (3) number of water pool (4) number of fish. The model outputs were (5) number of water pool in growing phase (6) cost of cultivation (6) optimal facility allocation(number of water pool for each growing phase). To solve the problem, an efficient heuristic algorithm based on a greedy manner is developed. Branch and bound and heuristic is evaluated through numerical examples.

Embedded Operating Systems;Windows CE, Embedded Linux, pSOS, uC/OS

  • Park, Kwang-Hyun;Jeon, Jae-Wook
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2003.10a
    • /
    • pp.1976-1981
    • /
    • 2003
  • Except a desktop computer and workstation, an embedded system is a system containing microprocessors. While a desktop computer and a workstation are designed for a general purpose, an embedded system is designed for a dedicated purpose. Thus, an embedded system must meet some constraints such as low power consumption, low cost, small size, real-time, or user-defined ones. A simple and low cost embedded system may be able to be designed without using embedded operating systems (OS). However, considered design time and effort, some embedded system had better be designed with using embedded OS. Under given constraints and purpose of some embedded systems, one embedded OS can save more time, cost, and effort in designing those embedded systems than others. This paper compares four embedded OSs, Windows CE, Embedded Linux, pSOS, and uC/OS. It analyzes several issues of embedded OS such as process scheduling, inter-process communication (IPC), memory management, and network support. Also, it describes the product of each embedded OS.

  • PDF

Self-Organized Resource Allocation for Femtocell Network to Mitigate Downlink Interference

  • Sable, Smita;Bae, Jinsoo;Lee, Kyung-Geun
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.40 no.12
    • /
    • pp.2410-2418
    • /
    • 2015
  • In this paper, we consider the femto users and their mutual interference as graph elements, nodes and weighted edges, respectively. The total bandwidth is divided into a number of resource blocks (RBs) and these are assigned to the femto user equipment (FUEs) using a graph coloring algorithm. In addition, resources blocks are assigned to the femto users to avoid inter-cell interference. The proposed scheme is compared with the traditional scheduling schemes in terms of throughput and fairness and performance improvement is achieved by exploiting the graph coloring scheme.

Freight and Fleet Optimization Models under CVO Environment (CVO 환경을 고려한 차량 및 화물 운송 최적 모델)

  • Choe Gyeong-Hyeon;Pyeon Je-Beom;Gwak Ho-Man
    • Proceedings of the Society of Korea Industrial and System Engineering Conference
    • /
    • 2002.05a
    • /
    • pp.209-215
    • /
    • 2002
  • In this paper, we propose a freight and fleet optimization model under CVO environment. The model is a kind of multi commodity network flow model based on Vehicle Routing Problem(VRP) and Vehicle Scheduling Problem(VSP), and considering operations and purposes of CVO. The main purpose of CVO is the freight and fleet management to reduce logistics cost and to Improve in vehicle safety. Thus, the objective of this model is to minimize routing cost of all the vehicle and to find the location of commodities which have origin and destination. We also present some computing test results.

  • PDF

Voltage Scaling for Reduced Energy Consumption in Real-Time Systems Using Variable Voltage Processor (가변 전압 프로세서를 사용하는 실시간 시스템에서 소비 전력감소를 위한 전압조절)

  • Lee, Yong-Jun;Kim, Yong-Seok
    • Proceedings of the KIEE Conference
    • /
    • 2004.11c
    • /
    • pp.438-440
    • /
    • 2004
  • Energy consumption has become an increasingly important consideration in designing real-time embedded systems. In this paper, we propose a voltage scaling method to reduce energy consumption in fixed priority real-time systems using variable voltage processors. The Hyperperiod of tasks is divided into dimains. The most suitable voltage of each domain is determined off-line and stored in a table. During task execution, the voltage of processor is adjusted according to the information of the table. A simulation result shows that the proposed method can reduce 80% of power consumption in comparison to no power management. The difference to the optimal EDF based method is only 5%.

  • PDF

An Empirical Study of Production Scheduling Model Establishment by LP Technique (LP기법에 의한 생산계획 모형수립의 실증적 연구)

  • 최원용
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.19 no.40
    • /
    • pp.203-217
    • /
    • 1996
  • This thesis describes a quantitative decision-making of production planning system. A mathmatical model of Linear Programming is used set up a production scheuling under the assumption. As the emphasis is laid on the applicability of the developed model, the linrar programming is applied to establish the production schedule for "F" furniture company which produces kitchin cabinet and OA furniture, The optimal solution is obtained by using the LP package, QBS. By the solution reduced to 14% of work force compared with the real data during all of the planning horizon. And it is also possible to reduce the work-force of the lowest level of employee by 10% for the reasonable management. There are some limitations in computerized data processing, which is only considering the economic costs without considering any external environment of case enterprise. As a result, it is shown that the LP model is very useful method of make aggregate production schedule. schedule.

  • PDF

Performance Comparison of Discrete Particle Swarm Optimizations in Sequencing Problems (순서화 문제에서 01산적 Particle Swarm Optimization들의 성능 비교)

  • Yim, D.S.
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.33 no.4
    • /
    • pp.58-68
    • /
    • 2010
  • Particle Swarm Optimization (PSO) which has been well known to solve continuous problems can be applied to discrete combinatorial problems. Several DPSO (Discrete Particle Swarm Optimization) algorithms have been proposed to solve discrete problems such as traveling salesman, vehicle routing, and flow shop scheduling problems. They are different in representation of position and velocity vectors, operation mechanisms for updating vectors. In this paper, the performance of 5 DPSOs is analyzed by applying to traditional Traveling Salesman Problems. The experiment shows that DPSOs are comparable or superior to a genetic algorithm (GA). Also, hybrid PSO combined with local optimization (i.e., 2-OPT) provides much improved solutions. Since DPSO requires more computation time compared with GA, however, the performance of hybrid DPSO is not better than hybrid GA.