In competitive electricity markets, maintenance schedule is submitted by generation companies (GENCOs) and transmission companies (TRANSCOs), and coordinated by Independent System Operator (ISO) with the adequacy criterion. This paper presents an alternative coordination procedure by ISO on the maintenance schedule. In this paper, it is focused on modeling a coordination algorithm by ISO for the maintenance schedule based on the Simulated Annealing algorithm. The proposed model employs the minimum information such as generator capacity, forced outage rate and generator maintenance schedules. The objective function of this model represents minimization of adjustment on schedules submitted by GENCOs.
This paper experimentally validates the efficacy of scheduling method that satisfies the performance requirement of periodic data in the Foundation Fieldbus. The scheduling method allocates periodic data traffic to a bandwidth-limited fieldbus medium. The scheduling method generates schedule list that records schedule starting time and schedule period of each periodic data. This study developed an experimental model of a Foundation Fieldbus network system. Using the experimental model, this study showed that the scheduling method can be easily implemented in a practical Foundation Fieldbus network system. The results obtained from the experimental evaluation showed that the scheduling method restricts the delay of periodic data to a pre-specified bound.
Minhyuk Jung;Hyun-soo Lea;Moonseo Park;Bogyeong Lee
국제학술발표논문집
/
The 5th International Conference on Construction Engineering and Project Management
/
pp.397-402
/
2013
In super-tall building construction projects, schedule risk factors which vertically change and are not found in the low and middle-rise building construction influence duration of a project by vertical attribute; and it makes hard to estimate activity or overall duration of a construction project. However, the existing duration estimating methods, that are based on quantity and productivity assuming activities of the same work item have the same risk and duration regardless of operation space, are not able to consider the schedule risk factors which change by the altitude of operation space. Therefore, in order to advance accuracy of duration estimation of super-tall building projects, the degree of changes of these risk factors according to altitude should be analyzed and incorporated into a duration estimating method. This research proposes a simulation model using Monte Carlo method for estimating activity duration incorporating schedule risk factors by weather conditions in a super-tall building. The research process is as follows. Firstly, the schedule risk factors in super-tall building are identified through literature and expert reviews, and occurrence of non-working days at high altitude by weather condition is identified as one of the critical schedule risk factors. Secondly, a calculating method of the vertical distributions of the weather factors such as temperature and wind speed is analyzed through literature reviews. Then, a probability distribution of the weather factors is developed using the weather database of the past decade. Thirdly, a simulation model and algorithms for estimating non-working days and duration of each activity is developed using Monte-Carlo method. Finally, sensitivity analysis and a case study are carried out for the validation of the proposed model.
This study was conducted to develop a model of a fee schedule for nursing services.'Regardless of the demand for skilled and professional nursing service today, the Korean health insurance system does not furnish a chapter for the nursing service fee schedule. A nation-wide survey of hospital nursing service fee schedules was to provide practical and realistic data about how the variety of nursing services are being charged. From September 1990 to April 1991, data from the fee schedule used by twenty hospitals located in eight large cities which are designated large medical regions in the Korea Health Care and Patient Referral System were collected. Nursing services and the fees charged for them were analyzed. The nursing services were subjected to a secondary analysis with referrence to reports on “nursing services to be charged in Korea”. The total number of nursing services recommended by the literatures was 177 : finally 141 types of nursing services were selected by investigator as chargable nursing services. In addition, data on managerial characteristics of the hospitals were collected to discover influential variables for a nursing fee schedule model. Under the assumption that all the managerial characteristics of the hospitals influenced the fee schedule, the following model was tested : Fee of nursing services (C) = f(A₁, A₂, A₃, A₄, A/sub 5/, A/sub 6/, A/sub 7/, A/sub 8/,) When, A₁ = number of nurses A₂ = the first salary of a nurse educated in a four year A₃ = scale of nursing management division A₄ = location of the hospital A/sub 5/ = the type of hospital management (profit / non-profit) A/sub 6/ = number of hospital beds A/sub 7/ = years of hospital operation A/sub 8/ = number and kinds of clinical divisions The results showed that the model should be built as follows : C = f (A₁, A/sub 4/, A/sub 5/) Each nursing service was applied to the fee schedule with consideration for the professional level and time-taken to provide the services. Detailed fee schedules were presented in the related tables. Of the 141 kinds of nursing services, 24.8% were chargeble to the Korea Health Insurance, 32.6% of the nursing services were being paid directly by the patienty. The rest of nursing services (42.6%) were not being charged to any source. It was recommened that the Korea Health Insurance Reimbursement system should add a classification system for nursing services that can be used in the national health care program. Further study is needed about how to include 32.6% of the nursing services now being paid for directly by the patients in the health insurance system.
The manufacturing companies under Make-To-Order (MTO) production environment face highly variable requirements of the customers. It makes them difficult to establish preemptive production strategy through inventory management and demand forecasting. Therefore, the ability to establish an optimal production schedule that incorporates the various requirements of the customers is emphasized as the key success factor. In this study, we suggest a process of designing the simulation model for establishing production schedule and apply this model to the case of a flat glass processing company. The flat glass manufacturing industry is under MTO production environment. Academic research of flat glass industry is focused on minimizing the waste in the cutting process. In addition, in the practical view, the flat glass manufacturing companies tend to establish the production schedule based on the intuition of production manager and it results in failure of meeting the due date. Based on these findings, the case study aims to present the process of drawing up a production schedule through simulation modeling. The actual data of Korean flat glass processing company were used to make a monthly production schedule. To do this, five scenarios based on dispatching rules are considered and each scenario is evaluated by three key performance indicators for delivery compliance. We used B2MML (Business To Manufacturing Markup Language) schema for integrating manufacturing systems and simulations are carried out by using SIMIO simulation software. The results provide the basis for determining a suitable production schedule from the production manager's perspective.
According to flying hours, aircraft engines require regular overhaul for preventive maintenance. Because of hostile defense environment of Republic of Korea, the aircraft of republic of Korea Air Force(ROKAF) have been operated at the maximum level of availability and have similar overhaul schedule in several months. The concentration of overhaul schedule in a short period demands additional spare engines far exceeding the spare engines for corrective maintenance. If ROKAF decides to purchase extra engines for the preventive maintenance, the extra engines will be used only for the preventive maintenance and will be excess inventory for the most of aircraft life ccle. Also, the procurement of extra engines is significant investment for ROKAF. To help ROKAF schedule the preventive maintenance without significant spending, this study develops a dynamic programming model that is solvable using an integer programming algorithm. The model provides the number of engines that should be overhauled for a month for multiple periods under given constraints. ROKAF actually used this model to solve a T-59 engine overhaul problem and saved about three billion won at one time. ROKAF plans to use this model continuously for T-59 and other weapon systems. Thus, saving for long term will be significant to ROKAF. Finally, with minor modification, this model can be applied to deciding the minimum number of spare engines for preventive maintenance.
This paper deals with the development of a software module for production planning and scheduling activities of an actual die-production management system. Scheduling problems, such as master schedule and detailed schedule, are the focal point of the whole article and they are considered in terms of operation procedures. Schedule-explosion module and load levelling module are the essential components of schedule management. The scheduling module allocates the resources, determines the process priority and the planned start and completion dates of processes. Rescheduling can be done to manipulate unforeseen situations that schedule is delayed owing to inducing defectives, machine breakdowns and lumpy demands. This study indicates a practical model for the die-producation management and helps to apply it for jobs in the real situation.
Church archives are the evidential instruments to remember church activity and important information aggregate which has administrative, legal, financial, historical, faithful value as the collective memory of church community. So it must be managed necessarily and the management orders are based on the Bible. The western churches which have a correct understanding about the importance of church records and management order have taken multilateral endeavor to create, manage church archives systematically. On the other hand, korean churches don't have the records management systems. Therefore, Records created in individual church are mostly managed unsystematically and exist as 'backlogs', finally, they are destructed without reasonable formalities. In those problems, the purpose of this study is to offer the way of records classification and disposition instrument with recognition that records management should be done from the time of creation or previous to it. As a concrete device for them, I tried to embody the function-based classification method and disposal schedule. I prefer the function-based classification and disposal schedule to the organization and function-based classification to present stable classification and disposal schedule, as we can say the best feature of the modern organization is multilateral and also churches have same aspect. For this study, I applied DIRKS(Designing and Implementing Recordkeeping Systems) manual which National Archives of Australia provide and guidelines in ICA/IRMT series to construct the theory of the function-based classification in individual churches. Through them, it was possible to present a model for preliminary investigation, analysis of business activity, records survey, disposal schedule. And I took an example of 'Myong Sung Presbyterian Church' which belong to 'The Presbyterian church in Korea'. I explained in detail codifying process and results of preliminary investigation in 'Myong Sung Presbyterian Church', analysis of business activity based on it, process of presenting the function-based classification and disposal schedule got from all those steps. For establishing disposal schedule, I planned 'General Disposal Schedule' and 'Agency Disposal Schedule' which categorized 'general function' and 'agency function' of an agency, according to DIRKS in Australia and ICA/IRMT. And for estimation of disposal date I had a thorough grasp of important records category presented in 'Constitution of General Assembly', interview to know the importance of tasks, and added examples of disposal schedule in western church archives. This study has significance that it was intended to embody 'the function-based classification' and 'disposal schedule' suitable for individual church, applying DIRKS in Australia and ICA/IRMT on absence of the theory or example which tried to present the function-based classification and disposal schedule for individual church. Also it is meaningful to present a model that can classify and disposal real records according to the function in individual church which has no recognition or way about records management.
In competitive electricity markets, maintenance schedule is submitted by Genco's and Transco's, and coordinated by ISO with the adequacy criterion. This paper presents an alternative coordination procedure by ISO on the maintenance schedule.
최근 건설 프로젝트가 대형화, 복잡화, 전문화되면서 다양한 참여자들 사이에서 발생하는 방대한 양의 정보 활용이 중요해 지고 있다. 발생되는 다양한 정보 중 일정정보는 건설프로젝트의 중심적인 정보이다. 건설현장 관련 참여자간 일정정보교환 미흡은 공기지연, 품질하자와 같은 건설생산성 저해 요인을 유발한다. 현재, 건설 산업에서는 건축물의 전 생애 주기 동안 필요한 데이터를 생산하고 관리하는 BIM(Building Information Modeling)에 대한 관심이 높아지고 있다. 본 연구는 BIM을 기반으로 건설공사의 일정정보를 체계적으로 관리 할 수 있는 일정관리 정보 체계를 구축하는 것이다. 이를 위해 BIM적용 일정관리 업무 프로세스를 구축하였으며, 일정정보를 구축하기 위한 작업분류체계를 도출 하였다. 또한 일정정보 구축에 필요한 속성 중 BIM모델에서 추출 할 수 있는 정보를 도출하고, 일정관리에 필요한 속성정보와 연계하여 일정을 생성 하고 공사 진행 시점별 일정관리를 위한 필요 정보를 제시한다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.