• Title/Summary/Keyword: safety manager calculation

Search Result 6, Processing Time 0.023 seconds

Improving Qualification of Safety Manager at Construction Site (건설현장 안전관리자의 자격기준에 관한 연구)

  • Gal, Won-Mo;Son, Ki-Sang;Jeong, Se-Gyun;Choi, Jea-Nam
    • Journal of the Korea Safety Management & Science
    • /
    • v.11 no.2
    • /
    • pp.111-115
    • /
    • 2009
  • As shown in the accident analysis from 2007, it has been found that causes of accidents on large-scale projects are different from those found in general construction projects. A 300-question survey regarding systematic and practical aspects of safety problems at construction sites was distributed to ten (10) different companies. Participants were to respond subjectively, so that the results could be used to assemble the first formal questionnaire survey. They were collected and compiled by an advisory committee for this study. The resulting surveys were then sent to the division chiefs of the top 100 construction companies in Korea, in order to improve the response rate. The Department of Safety & Health Direction, and the :Ministry of Labor, ROK sent the same sheets to medium and small construction companies that placed within 101-200th of all Korea construction companies. The above safety engineers were classified into four (4) levels, from 1st to 4th, followed by the project dollar amount and risk level. Formulae were developed to assign safety engineers to construction sites by engineer level, the project dollar amount, and the project risk level. Conclusions are summarized as follows: 1) Reviewing the assignment system of experienced safety engineers to large scaled projects - The more experienced the engineers assigned to a project, the higher the level of accident prevention. 2) Enforcing the assignment of advanced level safety engineers to large-scaled sites - At least one advanced-level safety engineer should be assigned to construction sites with projects valued at $15million USD (15,000,000,000). 3) For assigning safety engineers by risk level - Twenty models have been developed to calculate the number of safety engineers to be assigned by risk level. In the future, risk level for each job should be established by the government (as is now the practice in Germany).

A Low-Power Mutual Authentication Protocol in Ubiquitous Sensor Networks (유비쿼티스 센서 네트웨크에서의 저전력 상호인증 프로토클)

  • Cho Young-Bok;Jung Youn-Su;Kim Dong-Myung;Lee Sang-Ho
    • Journal of the Korea Society of Computer and Information
    • /
    • v.10 no.2 s.34
    • /
    • pp.187-197
    • /
    • 2005
  • All sensors in Ubiquitous sensor network have to communicate with limited battery If we adopt current authentication, there are difficulties to keep sensor network because heavy calculation in each sensor needs more power and lifetime of sensor could be short relatively because of the effect. This paper suggests network structure which is using RM(RegisterManarer) and AM(AuthenticationManager) to solve power Problem on authentication, and su99ests mutual-authentication protocol with low Power which supports a session key by mutual-authentication. RM and AM manage algorithm with fast calculation to keep the safety by doing key generation. encryption/decryption. authentication instead of each sensor node . Processing time to authenticate sensor node is 2.96$\%$ fast in the same subnet, and 12.91$\%$ fast in different subnet. Therefore. the suggested way Provides expanded lifetime of censor node and is more effective as sensor network size is bigger and bigger.

  • PDF

A Study on the Calculation of the proper number of the SPMS safety managers and safety management ratio when introducing SPMS (전문 안전 순찰 관리시스템(SPMS) 도입 시 건설 현장의 적정 SPMS 안전 관리자 수 및 안전 관리비 요율 산정에 관한 연구)

  • Yoon, Yeo-Chan;Chung, Kwang-Seop;Kim, Ji-Hoon;Kim, Sung-Min
    • Journal of the Korea Safety Management & Science
    • /
    • v.17 no.3
    • /
    • pp.45-52
    • /
    • 2015
  • Depending on the growth of the construction industry, size of construction sites are becoming enlarged, and construction work is becoming diversified as well. However, this increases risks of safety accidents. In order to alleviate this problem, some large construction companies have implemented a Safety Patrol Management System (SPMS) in order to reduce accidents on construction sites. Aimed at the construction sites where SPMS has been applied, the purpose of this research is to calculate the proper number of SPMS safety mangers by comparing and contrasting the number of safety managers per person for each site with different sizes and the converted accident ratio. In addition, we also aim to calculate the adequate amount of SPMS safety management costs compared to the total amount of construction expenses required once SPMS is introduced.

A Study on the Optimization of Offsite Consequence Analysis by Plume Segmentation and Multi-Threading (플룸분할 및 멀티스레딩을 통한 소외사고영향 분석시간 최적화 연구)

  • Seunghwan, Kim;Sung-yeop, Kim
    • Journal of the Korean Society of Safety
    • /
    • v.37 no.6
    • /
    • pp.166-173
    • /
    • 2022
  • A variety of input parameters are taken into consideration while performing a Level 3 PSA. Some parameters related to plume segments, spatial grids, and particle size distribution have flexible input formats. Fine modeling performed by splitting a number of segments or grids may enhance the accuracy of analysis but is time-consuming. Analysis speed is highly important because a considerably large number of calculations is required to handle Level 2 PSA scenarios for a single-unit or multi-unit Level 3 PSA. This study developed a sensitivity analysis supporting interface called MACCSsense to compare the results of the trials of plume segmentation with the results of the base case to determine its impact (in terms of time and accuracy) and to support the development of a modeling approach, which saves calculation time and improves accuracy. MACCSense is an automation tool that uses a large amount of plume segmentation analysis results obtained from MUST Converter and Mr. Manager developed by KAERI to generate a sensitivity report that includes impact (time and accuracy) by comparing them with the base-case result. In this study, various plume segmentation approaches were investigated, and both the accuracy and speed of offsite consequence analysis were evaluated using MACCS as a consequence analysis tool. A simultaneous evaluation revealed that execution time can be reduced using multi-threading. In addition, this study can serve as a framework for the development of a modeling strategy for plume segmentation in order to perform accurate and fast offsite consequence analyses.

Establishment of Efficient Organization for Coordination Center on Clinical Research in Traditional Korean Medicine (한의학임상협연연구의 필요성과 효율적인 조직체계의 구축)

  • Ko Seong-Gyu;Jun Chan-Yong;Park Jong-Hyeong;Han Chang-Ho;Jung Woo-Sang;Moon Sang-Kwan;Cho Ki-Ho;Kim Young-Suk;Bae Hyung-Sup
    • The Journal of Korean Medicine
    • /
    • v.27 no.1 s.65
    • /
    • pp.196-203
    • /
    • 2006
  • Objectives : The aim of this study is to investigate how does the methods of treatment and diagnosis of Traditional Korean Medicine(TKM) get the evidence of efficacy and safety and what type of efficient body and appropriate facility of the coordination center for clinical trial in TKM. Methods : We have got the information of clinical trial center or clinical collaboration center by site invitation, search of paper and reports and internet exploration for the domestic or foreign site. Results : Coordination center for clinical trial usually involves every steps of clinical trials, such as development of Case Report From (CRF), design of study, calculation of sample size, randomization, maintenance of blinding, monitoring and audit of the resource document, data and CRF, data entry, quality control of data, analysis and report. Conclusions : The body needs several aresa of experts, which are epidemiologists, biostatisticians, research nurses for coordination, data manager and programmer, and administrator. This body would be enhance and help he clinical researches including clinical trials in TKM.

  • PDF

A Planning Framework of BIM-based Work-Type Packaging for Educational Facility Maintenance (교육시설 유지관리 BIM 기반 공종 패키지 플래닝 프레임워크)

  • Bae, Chang-Joon;Park, Sang-Hun;Yoon, Sun-Jae;Lee, Mi-Young;Koo, Kyo-jin
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.12
    • /
    • pp.200-210
    • /
    • 2020
  • The maintenance of educational facilities was assembled in 12 project classifications of the Educational Improvement Program. The priorities were decided by the evaluation scores derived from the condition investigation, and maintenance works were budgeted in the order of priorities. These priorities were a schedule for conducting maintenance and an important criterion for obtaining a construction order. Several restrictions in the condition investigation exist, which derives budgets and conducts maintenance separately based on the priorities. An educational facility manager has a restriction in quantity take-off, which results in an incorrect budget. Discomfort would occur in an educational environment, and a period of infringing safety would increase. This study proposes applying a BIM in the condition investigation and the planning framework for work-type packaging. A BIM supports a budget calculation and derives evaluation scores by linking a repair and an inspection result. The work-type packaging algorithm divides a budget allocation range and derives the result of a grouped work-types applied in an equivalent space and element. As a result of applying cases, it could shorten the duration by approximately 37.4%. Its usability in selecting a grouped work-type was evaluated through an assessment with workers.