• Title/Summary/Keyword: safety life cycle

Search Result 459, Processing Time 0.032 seconds

A Study on Building Maintenance Institutionalization by Comparing with the Foreign Countries' Cases (국내외 건축물의 유지관리 운영실태의 비교분석에 의한 건축물 유지관리 제도화 방안 연구)

  • Yoon, Hyo Jin
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.6D
    • /
    • pp.857-865
    • /
    • 2011
  • Under the 'Sustainability Paradigm', the building maintenance system is getting more important because more efficient maintenance means more sustainable building. This paper aims at improving present building maintenance system by comparing with the foreign developed countries' systems. The comparing countries are selected according to the level of building maintenance. As the results, 4 countries including USA, England, Germany, and Japan become the benchmark. The results show that building maintenance regulations are various by social, economic, and cultural characteristics. In addition, though building maintenance policy must be established, first of all, the related regulations and policy targets are prepared before the enforcement of maintenance regulation. The results provide some policy implications: 1. Building maintenance must be controled under the condition that a building can guarantee the safety of people and function of it. 2. Building maintenance system should contribute to the desirable urban environment and architectural culture.

Ventilation System Strategy for a Prospective Korean Radioactive Waste Repository (한국형 방사성 폐기물 처분장을 위한 환기시스뎀 전략)

  • Kim Jin;Kwon Sang-Ki
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.3 no.2
    • /
    • pp.135-148
    • /
    • 2005
  • In the stage of conceptual design for the construction and operation of the geologic repository for radioactive wastes, it is important to consider a repository ventilation system which serves the repository working environment, hygiene & safety of the public at large, and will allow safe maintenance like moisture content elimination in repository for the duration of the repositories life, construction/operation/closure, also allowing safe waste transportation and emplacement. This paper describes the possible ventilation system design criteria and requirements for the prospective Korean radioactive waste repositories with emphasis on the underground rock cavity disposal method in the both cases of low & medium-level and high-level wastes. It was found that the most important concept is separate ventilation systems for the construction (development) and waste emplacement (storage) activities. In addition, ventilation network system modeling, natural ventilation, ventilation monitoring systems & real time ventilation simulation, and fire simulation & emergency system in the repository are briefly discussed.

  • PDF

Experimental Study of Cooling Performance Comparison of a 18650 Li-ion Unit Battery Module (Air Cooling vs. PCM-based Cooling) (18650 리튬-이온 단일 배터리 모듈의 냉각 성능 비교에 관한 실험적 연구(공기 냉각과 PCM 기반 냉각))

  • BAEK, SEOUNGSU;YU, SIWON;KIM, HAN-SANG
    • Transactions of the Korean hydrogen and new energy society
    • /
    • v.29 no.2
    • /
    • pp.212-218
    • /
    • 2018
  • Li-ion battery system is regarded as one of the most potent power sources for electrified power-trains. For the Li-ion battery system to be widely adopted in automotive applications, the performance, safety, and cycle life issues need to be properly addressed. These issues are closely related to the thermal management of battery system. Especially, the effective cooling module design is the core part for the novel battery thermal management system development. In this paper, an experimental approach was carried out as a basic part of comprehensive battery thermal management research. The main goal of this paper is to present a comparison of two cooling systems (air cooling and phase change material (PCM) based cooling) of the unit 18650 battery module. The temperature rise with different battery discharge rate (c-rate) was mainly investigated and analyzed for two types of battery cooling systems. It is expected that this study can properly contribute to providing basic insights into the design of robust battery thermal management system for vehicular applications.

A Study on the Construction Methods of Sealer of Injection Type for Leakage Maintenance for Water Leakage and Cracks in Concrete (콘크리트 누수균열의 유지관리를 위한 누수보수용 주입형 실링재 시공방법 연구)

  • Kwon Shi-Won;Oh Mi-Hyun;Kwak Kyu-Sung;Oh Sang-Keun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.6 no.1 s.19
    • /
    • pp.87-91
    • /
    • 2006
  • Since water leakage and cracks are not the source of serious problems such as long-term lowering of performance and durability of a stricture, including damages to operating facilities of a structure, damages to internal finishing materials, exhibition, and goods, and pollution of residential environment, they might have led to development of positive coping skills; however, an instant loss of lives or property due to earthquake, explosion, typhoon, or a fire was indeed neglected. In these days, repair materials for leakage cannot help but being taken in temporary way without any noticeable countermeasure. This kind of repair is socially criticized many times that is defective construction even if this costs a lot. It was not arrange the standard for construction methods of sealer of injection type for leakage maintenance, even it has been used various type of construction methods for leakage part. In conclusion, we suggest that the construction methods of sealer of injection type for leakage maintenance for leakage to establish the leakage repairing technology as increase of structure demand. Therefore, it would be possible to provide a stage-by-stage solution by developing systematic research activities among the industry, schools, and research institutes to spread maintenance management techniques globally through technical solution to water leakage and cracks, acquisition of structural safety with prolonged durability for life cycle, reduction of water leakage repair expense s, and so on.

A Study about BIM Execution Plan for Specialty Contractors at Construction Phase - focused on Specialty Contractors in Reinforced Concrete Works - (시공단계에 참여하는 전문건설업체를 위한 시공 BIM 수행계획 구축 - 철근콘크리트 업체를 중심으로 -)

  • Lee, Joo-Sung;Ham, Nam-Hyuk;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.5 no.3
    • /
    • pp.19-32
    • /
    • 2015
  • For decades, the productivity issue has been a primary concern for the all stake-holders who participate in domestic construction industry. Especially, between a whole life cycle of building, the construction phase's productivity problem makes or break the entire project. In this respect, the general construction company, who accept the order and construct the building(so called General Contractor), should consider various strategies, such as schedule management, cost management, quality management, inner-crew management, etc., for the productivity improvement., and almost of these management methods have been studied for a long time. But, the researches and studies about the specialty contractor, who construct the building directly in construction site were not sufficiently complete yet. This research begins as an idea which tries to apply the BIM(Building Information Modeling) into the tasks of Specialty contractors for their productivity improvement. And for the effective application of construction BIM to specialty contractors, establish of the BIM project execution plan for them, not the fragmentary adoption of BIM. Therefore, in this paper, we develop the BIM project execution plan for the reinforced concrete companies who conduct the framework construction which located on CP(Critical Path) Especially, we model the "Construction BIM Use List for the RC Work", "BIM Application Master Process" and "BIM Application Detailed Process", and general contractor who use these BIM uses list and process models can manage various specialty contractors about schedule, cost, earned value, quality, safety and environment management systematically.

Research on Personal Information Safety Condition and Improvements in Welfare Center for the Disabled (장애인복지관 개인정보보호 실태와 개선 방안)

  • Kim, Sung-Jin;Kweon, Jae-Sook
    • The Journal of the Korea Contents Association
    • /
    • v.10 no.11
    • /
    • pp.262-274
    • /
    • 2010
  • In Welfare Center for the disabled, under the Government's information acceleration plan, the computer system has been developed starting from work standardization in 2001 but it has been emphasized only on the technical and customer convenience side leaving out preparation for the side effects of them. Therefore this article will seek the necessity of personal information protection, legal basis in the Welfare Center for the disabled. Additionally after analyzing current status for the personal security of Welfare Center for the disabled, establishing an alternative plan for personal security policy's way could be addressed. Increasing education for awareness stress of personal information security, and preparing institutional protection apparatus from applying life cycle of personal information would be an alternative plan for personal information protection for Welfare Center for the disabled. Also frequent monitoring of accessing personal information from the computerized system should be achieved. It is impossible to recover damage caused by leak of personal information although post actions are progressed. From this essay, awareness of personal information protection should be newly revised for both the Social Welfare Organization and the Disabled welfare center, and also technical, institutional strategy's action should be arranged.

Reliability Optimization of Urban Transit Brake System For Efficient Maintenance (효율적 유지보수를 위한 도시철도 전동차 브레이크의 시스템 신뢰도 최적화)

  • Bae, Chul-Ho;Kim, Hyun-Jun;Lee, Jung-Hwan;Kim, Se-Hoon;Lee, Ho-Yong;Suh, Myung-Won
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.31 no.1 s.256
    • /
    • pp.26-35
    • /
    • 2007
  • The vehicle of urban transit is a complex system that consists of various electric, electronic, and mechanical equipments, and the maintenance cost of this complex and large-scale system generally occupies sixty percent of the LCC (Life Cycle Cost). For reasonable establishing of maintenance strategies, safety security and cost limitation must be considered at the same time. The concept of system reliability has been introduced and optimized as the key of reasonable maintenance strategies. For optimization, three preceding studies were accomplished; standardizing a maintenance classification, constructing RBD (Reliability Block Diagram) of VVVF (Variable Voltage Variable Frequency) urban transit, and developing a web based reliability evaluation system. Historical maintenance data in terms of reliability index can be derived from the web based reliability evaluation system. In this paper, we propose applying inverse problem analysis method and hybrid neuro-genetic algorithm to system reliability optimization for using historical maintenance data in database of web based system. Feed-forward multi-layer neural networks trained by back propagation are used to find out the relationship between several component reliability (input) and system reliability (output) of structural system. The inverse problem can be formulated by using neural network. One of the neural network training algorithms, the back propagation algorithm, can attain stable and quick convergence during training process. Genetic algorithm is used to find the minimum square error.

Current Status of Ocean Satellite Remote Sensing Data and Its Distribution (해양의 인공위성 자료 현황과 배포 소개)

  • Yang, Chan-Su
    • Proceedings of KOSOMES biannual meeting
    • /
    • 2007.11a
    • /
    • pp.51-55
    • /
    • 2007
  • As for satellite programs, the multipurpose satellite 1(KOMPSAT-1) was successfully launched on Dec. 21, 1999 and operated for three years. It is still properly operated even though its life cycle was ended. The development of KOMPSAT-2 (Korea Multipurpose Satellite-2) is near completion and the development of KOMPSAT-3, KOMPSAT-5 and COMS (Communication, Ocean, Meterological Satellite) are proceeding swiftly. In KORDI(Korea Ocean Research and Development Institute), the KOSC (Korea Ocean Satellite Center) construction project is being prepared for acquisition, processing and distribution of sensor data via L-band from GOCI(Geostationary Ocean Color Imager) instrument which is loaded on COMS(Communication, Ocean and Meteorological Satellite); it will be launched in 2000. Ansan(the headquarter of KORDD has been selected for the location of KOSC between 5 proposed sites, because it has the best condition to receive radio wave. The data acquisition system is classified antenna and RF. Antenna is designed to be ${\emptyset}$ 9m cassegrain antenna which has 19.35 $G/T(dB/^{\circ}K)$ at 1.67GHz, RF module, is divided into LNA(Low noise amplifier) and down converter, those are designed to send only horizontal polarization to modem The existing building is re-designed and classified for the KOSC operation concept; computing room, board of electricity, data processing room, operation room Hardware and network facilities have been designed to adapt for efficiency of each functions. The distribution system which is one of the most important systems will be constructed mainly on the internet, and it is also being considered constructing outer data distribution system as a web hosting service for to offering received data to user under an hour.

  • PDF

Developing Product Liability Response Strategies of SMEs using PEST-SWOT-AHP analysis (PEST-SWOT-AHP 분석을 이용한 중소제조기업의 제조물책임 대응전략 수립)

  • Seo, JunHyeok;Bae, SungMin
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.39 no.2
    • /
    • pp.11-18
    • /
    • 2016
  • Product liability (PL), which began enforcement in 2002, refers to the legal responsibility of the manufacturers or sellers (wholesales or retailers) for the property damage or bodily harm caused by their product. With a strong enforcement of the Product Liability (PL) Act, companies are required to structure and operate a response system to defend or prevent product accidents efficiently, but small and medium enterprises (SMEs) are unable to respond more aggressively due to limitation of management resources. In this manner, it is important to develop response strategies for SMEs to efficiently cope with the PL Act. In this paper, the PEST (Political, Economic, Social, and Technological) analysis is performed to reveal the impact of the PL Act on SMEs in macro-economic point of view. To formulate SME's PL response strategy, SWOT analysis is performed to categorize each factors from PEST analysis and AHP is applied to identify the intensities of SWOT factors. The prioritized SWOT factor, results of PEST-SWOT-AHP analysis, are used to formulate SME's PL response strategies. The study results are briefly summarized as follows. To reduce product defects, it is necessary for SMEs to formulate PL response strategies for each phase of the product life cycle by continuously collecting and analyzing PL cases in the same industry or for similar products. In addition, SMEs should invest more technological effort to ensure product safety. Further, SMEs should spread PL awareness to all staff members by training internal PL experts. Moreover, a SME should enroll in PL insurance and spread this information to its customers so that they become aware that the company is proactively conforming to the PL law.

The Study for Establishing the Criteria of Measurement Items in the Monitoring System for the Steel-Box Girder Bridge by FEM Analysis (구조해석에 의한 강상자형교 상시계측시스템 계측항목별 관리기준치 설정 연구)

  • Joo, Bong-Chul;Park, Ki-Tae;You, Young-Jun;Lee, Chin-Hyung;Hwang, Yoon-Koog
    • Journal of Korean Society of societal Security
    • /
    • v.2 no.4
    • /
    • pp.35-41
    • /
    • 2009
  • If any bridge has the monitoring system, the bridge manager can check the history of bridge behavior and the progress of the damage more exactly. When the unexpected event (ex: earthquake and flood) happens, the manager can check the safety condition of the bridge and make the pertinent action for bridge management which is reduction of vehicle speed or traffic control through the system. Additionary the manager can make the well-timed repair or reinforcement through the system, so he can save the management cost or the life cycle cost. This study presents the method of setting the criteria by FEM analysis in bridge monitoring system, and the standard progress for setting the criteria about measurement items of monitoring system for the steel box type bridge.

  • PDF