• Title/Summary/Keyword: safety equipment

Search Result 2,915, Processing Time 0.037 seconds

Basic Study to Establish Marine Activity Criteria Based on the Seakeeping Performance of Less Than 10-tons Fishing Vessels(I) (내항성능 기반 10톤 미만 어선의 해양활동 기준 마련 기초 연구(I))

  • Choi, Gwang-Young;Song, Chae-Uk;Park, Young-Soo;Park, Jun-Bum
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.28 no.6
    • /
    • pp.965-972
    • /
    • 2022
  • This is a basic study to establish marine activity criteria based on the seakeeping performance of less than 10-tons fishing vessels. These vessels account for approximately 95% of Korea's currently registered fishing vessels, and accidents and loss of life are also occurring during marine activities such as navigation, and fishing. Accordingly, the Ministry of Oceans and Fisheries has set a regulation of vessel traf ic control to restrict the operation of fishing vessels when the high seas watch takes effect, but it is applied equally without criteria according to the ship ton level and wave height; therefore, many differences may exist in ship fluctuations. Because the fluctuation of the ship owing to the wave height can be a factor in marine accidents by reducing the sense of boarding and performance of equipment, the seakeeping performance must be reviewed during waves to secure safe marine activities such as navigation and fishing. However, the review for the fishing vessel of established marine activity criteria based on the seakeeping performance is insufficient. Accordingly, the seakeeping performance was evaluated for a 10-ton class (G/T 9.77 tons) fishing vessel in Korea, and the level of marine activity according to the significant wave height and ship speed was interpreted by applying the operation and survival of the established seakeeping performance criteria. The analysis results indicated that the roll of the ship exceeded the operation criteria from 0.4m and the survival criteria from 2.2m. The pitch of the ship exceeded the operation criteria from 1.7m and did not exceed the survival criteria until 3.0m. However, the rolling exceeding the survival criteria from 2.2m may not be safe. Therefore, fishing vessels with less than 10-tons can leave before the high seas watch takes effect. However, they did not satisfy the criteria for evaluating the performance of the sea in relation to marine activities. Although this study was limitedly evaluated for 10-ton fishing vessels, it is expected to be of great help in preparing marine activity criteria.

Heavy concrete shielding properties for carbon therapy

  • Jin-Long Wang;Jiade J Lu;Da-Jun Ding;Wen-Hua Jiang;Ya-Dong Li;Rui Qiu;Hui Zhang;Xiao-Zhong Wang;Huo-Sheng Ruan;Yan-Bing Teng;Xiao-Guang Wu;Yun Zheng;Zi-Hao Zhao;Kai-Zhong Liao;Huan-Cheng Mai;Xiao-Dong Wang;Ke Peng;Wei Wang;Zhan Tang;Zhao-Yan Yu;Zhen Wu;Hong-Hu Song;Shuo-Yang Wei;Sen-Lin Mao;Jun Xu;Jing Tao;Min-Qiang Zhang;Xi-Qiang Xue;Ming Wang
    • Nuclear Engineering and Technology
    • /
    • v.55 no.6
    • /
    • pp.2335-2347
    • /
    • 2023
  • As medical facilities are usually built at urban areas, special concrete aggregates and evaluation methods are needed to optimize the design of concrete walls by balancing density, thickness, material composition, cost, and other factors. Carbon treatment rooms require a high radiation shielding requirement, as the neutron yield from carbon therapy is much higher than the neutron yield of protons. In this case study, the maximum carbon energy is 430 MeV/u and the maximum current is 0.27 nA from a hybrid particle therapy system. Hospital or facility construction should consider this requirement to design a special heavy concrete. In this work, magnetite is adopted as the major aggregate. Density is determined mainly by the major aggregate content of magnetite, and a heavy concrete test block was constructed for structural tests. The compressive strength is 35.7 MPa. The density ranges from 3.65 g/cm3 to 4.14 g/cm3, and the iron mass content ranges from 53.78% to 60.38% from the 12 cored sample measurements. It was found that there is a linear relationship between density and iron content, and mixing impurities should be the major reason leading to the nonuniform element and density distribution. The effect of this nonuniformity on radiation shielding properties for a carbon treatment room is investigated by three groups of Monte Carlo simulations. Higher density dominates to reduce shielding thickness. However, a higher content of high-Z elements will weaken the shielding strength, especially at a lower dose rate threshold and vice versa. The weakened side effect of a high iron content on the shielding property is obvious at 2.5 µSv=h. Therefore, we should not blindly pursue high Z content in engineering. If the thickness is constrained to 2 m, then the density can be reduced to 3.3 g/cm3, which will save cost by reducing the magnetite composition with 50.44% iron content. If a higher density of 3.9 g/cm3 with 57.65% iron content is selected for construction, then the thickness of the wall can be reduced to 174.2 cm, which will save space for equipment installation.

Development of Supplemental Equipment to Reduce Movement During Fusion Image Acquisition (융합영상(Fusion image)에서 움직임을 줄이기 위한 보정기구의 개발)

  • Cho, Yong Gwi;Pyo, Sung Jae;Kim, Bong Su;Shin, Chae Ho;Cho, Jin Woo;Kim, Chang Ho
    • The Korean Journal of Nuclear Medicine Technology
    • /
    • v.17 no.2
    • /
    • pp.84-89
    • /
    • 2013
  • Purpose: Patients' movement during long image acquisition time for the fusion image of PET-CT (Positron Emission Tomography-Computed Tomography) results in unconformity, and greatly affects the quality of the image and diagnosis. The arm support fixtures provided by medical device companies are not manufactured considering the convenience and safety of the patients; the arm and head movements (horizontal and vertical) during PET/CT scan cause defects in the brain fundus images and often require retaking. Therefore, this study aims to develop patient-compensation device that would minimize the head and arm movements during PET/CT scan, providing comfort and safety, and to reduce retaking. Materials and Methods: From June to July 2012, 20 patients who had no movement-related problems and another 20 patients who had difficulties in raising arms due to shoulder pain were recruited among the ones who visited nuclear medicine department for PET Torso scan. By using Patient Holding System (PHS), different range of motion (ROM) in the arm ($25^{\circ}$, $27^{\circ}$, $29^{\circ}$, $31^{\circ}$, $33^{\circ}$, $35^{\circ}$) was applied to find the most comfortable angle and posture. The manufacturing company was investigated for the permeability of the support material, and the comfort level of applying bands (velcro type) to fix the patient's head and arms was evaluated. To find out the retake frequency due to movements, the amount of retake cases pre/post patient-compensation were analyzed using the PET Torso scan data collected between January to December 2012. Results: Among the patients without movement disorder, 18 answered that PHS and $29^{\circ}$ arm ROM were the most comfortable, and 2 answered $27^{\circ}$ and $31^{\circ}$, respectively. Among the patients with shoulder pain, 15 picked $31^{\circ}$ as the most comfortable angle, 2 picked $33^{\circ}$, and 3 picked $35^{\circ}$. For this study, the handle was manufactured to be adjustable for vertical movements. The material permeability of the patient-compensation device has been verified, and PHS and the compensation device were band-fixed (velcro type) to prevent device movements. A furrow was cut for head fixation to minimize the head and neck movements, fixing bands were attached for the head, wrist, forearm, and upper arm to limit movements. The retake frequency of PET Torso scan due to patient movements was 11.06% (191 cases/1,808 patients) before using the movement control device, and 2.65% (48 cases/1,732 patients) after using the device; 8.41% of the frequency was reduced. Conclusion: Recent change and innovation in the medical environment are making expensive medical image scans, and providing differentiated services for the customers is essential. To secure patient comfort and safety during PET/CT scans, ergonomic patient-compensation devices need to be provided. Therefore, this study manufactured a patientcompensation device with vertically adjustable ergonomic ROM according to the patient's body shape and condition during PET Torso scan. The defects in the basal ganglia images due to arm movements were reduced, and retaking was decreased.

  • PDF

Analysis of Critical Control Points through Field Assessment of Sanitation Management Practices in Foodservice Establishments (현장실사를 통한 급식유헝별 위생관리실태 분석)

  • Kwak Tong-Kyung;Lee Kyung-Mi;Chang Hye-Ja;Kang Yong-Jae;Hong Wan-Soo;Moon Hye-Kyung
    • Korean journal of food and cookery science
    • /
    • v.21 no.3 s.87
    • /
    • pp.290-300
    • /
    • 2005
  • Increased sanitation management of foodservice establishments is required because most of the reported foodborne-disease outbreaks were in the foodservice industry. The purpose of this study was to determine the important control points for good sanitation. In this study, we inspected twenty foodservice establishments in Seoul, Kyunggi, Kyungnam with a self-developed monitoring tool. These foodservice establishments included secondary schools, universities, and industries. Six of them had appointed as the HACCP-certified establishments from the Korea Food and Drug Administration. The inspection was conducted from June to August in 2002. The inspection tool consisted of nine dimensions and sixty-five items. The dimensions were 'personal sanitation', 'supply of raw food', 'food storage', 'handling of raw food and ready-to-eat', 'cleaning and sterilization', 'waste control', 'pest control', and 'control of establishment and equipment' The highest possible score of this inspection tool is 105 points. Statistical data analysis was completed using the SPSS Package(11.0) for descriptive analysis Kruskal-Wallis. The score for the secondary schools (83.6 points) was higher than for the others and number of in compliance item was 50.9 on average. Therefore, we concluded that the secondary schools' sanitation condition was good. The foodservice establishments acquired HACCP certification was 89.7 points, which was significantly higher than that of establishments not applying foodservices in total score. Instituting the HACCP system in a foodservice is very effective for sanitation management. Many out of the compliance observations were found in the dimensions of 'waste control', 'control of establishment and equipment', and 'supply of raw food' 'Clean condition of refrigerator' item was $65\%$ out of the compliance that was the highest percent in this study. 'Notify and observance of heating/reheating temperature' was $45\%$ out of compliance. Items which were over $30\%$ out of compliance were 'sterilization of knifes and chopping boards in cooking', 'education of workers', 'maintain refrigerator temperature blow $5^{\circ}C$', and 'countermeasure of infection workers' In the results, most of the foodservice establishments were poorly managed in temperature control and cross-contamination. The important control points revealed in this study were preventing contamination, cooking temperature compliance, management of raw food and refrigerator. Therefore foodservice establishments should pay attention to education and training about important control points. The systematic sanitation management monitoring tool developed in this study can be effectively applied for conducting self-inspection and improving the sanitary conditions of their own foodservice operations.

Review of 2015 Major Medical Decisions (2015년 주요 의료판결 분석)

  • Yoo, Hyun Jung;Lee, Dong Pil;Lee, Jung Sun;Jeong, Hye Seung;Park, Tae Shin
    • The Korean Society of Law and Medicine
    • /
    • v.17 no.1
    • /
    • pp.299-346
    • /
    • 2016
  • There were also various decisions made in medical area in 2015. In the case that an inmate in a sanatorium was injured due to the reason which can be attributable to the sanatorium and the social welfare foundation that operates the sanatorium request treatment of the patient, the court set the standard of fixation of a party in medical contract. In the case that the family of the patient who was declared brain dead required withdrawal of meaningless life sustaining treatment but the hospital rejected and continued the treatment, the court made a decision regarding chargeable fee for such treatment. When it comes to the eye brightening operation which received measure of suspension from the Ministry of Health and Welfare for the first time in February, 2011, because of uncertainty of its safety, the court did not accept the illegality of such operation itself, however, ordered compensation of the whole damage based on the violation of liability for explanation, which is the omission of explanation about the fact that the cost-effectiveness is not sure as it is still in clinical test stage. There were numerous cases that courts actively acknowledged malpractices; in the cases of paresis syndrome after back surgery, quite a few malpractices during the surgery were acknowledged by the court and in the case of nosocomial infection, hospital's negligence to cause such nosocomial infection was acknowledged by the court. There was a decision which acknowledged malpractice by distinguishing the duty of installation of emergency equipment according to the Emergency Medical Service Act and duty of emergency measure in emergency situations, and a decision which acknowledged negligence of a hospital if the hospital did not take appropriate measures, although it was a very rare disease. In connection with the scope of compensation for damage, there were decisions which comply with substantive truth such as; a court applied different labor ability loss rate as the labor ability loss rate decreased after result of reappraisal of physical ability in appeal compared to the one in the first trial, and a court acknowledged lower labor ability loss rate than the result of appraisal of physical ability considering the condition of a patient, etc. In the event of any damage caused by malpractice, in regard to whether there is a limitation on liability in fee charge after such medical malpractice, the court rejected the hospital's claim for setoff saying that if the hospital only continued treatments to cure the patient or prevent aggravation of disease, the hospital cannot charge Medical bills to the patient. In regard to the provision of the Medical Law that prohibit medical advertisement which was not reviewed preliminarily and punish the violation of such, a decision of unconstitutionality was made as it is a precensorship by an administrative agency as the deliberative bodies such as Korean Medical Association, etc. cannot be denied to be considered as administrative bodies. When it comes to the issue whether PRP treatment, which is commonly performed clinically, should be considered as legally determined uninsured treatment, the court made it clear that legally determined uninsured treatment should not be decided by theoretical possibility or actual implementation but should be acknowledged its medical safety and effectiveness and included in medical care or legally determined uninsured treatment. Moreover, court acknowledged the illegality of investigation method or process in the administrative litigation regarding evaluation of suitability of sanatorium, however, denied the compensation liability or restitution of unjust enrichment of the Health Insurance Review & Assessment Service and the National Health Insurance Corporation as the evaluation agents did not cause such violation intentionally or negligently. We hope there will be more decisions which are closer to substantive truth through clear legal principles in respect of variously arisen issues in the future.

  • PDF

A Study on Integrated Logistic Support (통합병참지원에 관한 연구)

  • 나명환;김종걸;이낙영;권영일;홍연웅;전영록
    • Proceedings of the Korean Reliability Society Conference
    • /
    • 2001.06a
    • /
    • pp.277-278
    • /
    • 2001
  • The successful operation of a product In service depends upon the effective provision of logistic support in order to achieve and maintain the required levels of performance and customer satisfaction. Logistic support encompasses the activities and facilities required to maintain a product (hardware and software) in service. Logistic support covers maintenance, manpower and personnel, training, spares, technical documentation and packaging handling, storage and transportation and support facilities.The cost of logistic support is often a major contributor to the Life Cycle Cost (LCC) of a product and increasingly customers are making purchase decisions based on lifecycle cost rather than initial purchase price alone. Logistic support considerations can therefore have a major impact on product sales by ensuring that the product can be easily maintained at a reasonable cost and that all the necessary facilities have been provided to fully support the product in the field so that it meets the required availability. Quantification of support costs allows the manufacturer to estimate the support cost elements and evaluate possible warranty costs. This reduces risk and allows support costs to be set at competitive rates.Integrated Logistic Support (ILS) is a management method by which all the logistic support services required by a customer can be brought together in a structured way and In harmony with a product. In essence the application of ILS:- causes logistic support considerations to be integrated into product design;- develops logistic support arrangements that are consistently related to the design and to each other;- provides the necessary logistic support at the beginning and during customer use at optimum cost.The method by which ILS achieves much of the above is through the application of Logistic Support Analysis (LSA). This is a series of support analysis tasks that are performed throughout the design process in order to ensure that the product can be supported efficiently In accordance with the requirements of the customer.The successful application of ILS will result in a number of customer and supplier benefits. These should include some or all of the following:- greater product uptime;- fewer product modifications due to supportability deficiencies and hence less supplier rework;- better adherence to production schedules in process plants through reduced maintenance, better support;- lower supplier product costs;- Bower customer support costs;- better visibility of support costs;- reduced product LCC;- a better and more saleable product;- Improved safety;- increased overall customer satisfaction;- increased product purchases;- potential for purchase or upgrade of the product sooner through customer savings on support of current product.ILS should be an integral part of the total management process with an on-going improvement activity using monitoring of achieved performance to tailor existing support and influence future design activities. For many years, ILS was predominantly applied to military procurement, primarily using standards generated by the US Government Department of Defense (DoD). The military standards refer to specialized government infrastructures and are too complex for commercial application. The methods and benefits of ILS, however, have potential for much wider application in commercial and civilian use. The concept of ILS is simple and depends on a structured procedure that assures that logistic aspects are fully considered throughout the design and development phases of a product, in close cooperation with the designers. The ability to effectively support the product is given equal weight to performance and is fully considered in relation to its cost.The application of ILS provides improvements in availability, maintenance support and longterm 3ogistic cost savings. Logistic costs are significant through the life of a system and can often amount to many times the initial purchase cost of the system.This study provides guidance on the minimum activities necessary to Implement effective ILS for a wide range of commercial suppliers. The guide supplements IEC60106-4, Guide on maintainability of equipment Part 4: Section Eight maintenance and maintenance support planning, which emphasizes the maintenance aspects of the support requirements and refers to other existing standards where appropriate. The use of Reliability and Maintainability studies is also mentioned in this study, as R&M is an important interface area to ILS.

  • PDF

A Study of Guide System for Cerebrovascular Intervention (뇌혈관 중재시술 지원 가이드 시스템에 관한 연구)

  • Lee, Sung-Gwon;Jeong, Chang-Won;Yoon, Kwon-Ha;Joo, Su-Chong
    • Journal of Internet Computing and Services
    • /
    • v.17 no.1
    • /
    • pp.101-107
    • /
    • 2016
  • Due to the recent advancement in digital imaging technology, development of intervention equipment has become generalize. Video arbitration procedure is a process to insert a tiny catheter and a guide wire in the body, so in order to enhance the effectiveness and safety of this treatment, the high-quality of x-ray of image should be used. However, the increasing of radiation has become the problem. Therefore, the studies to improve the performance of x-ray detectors are being actively processed. Moreover, this intervention is based on the reference of the angiographic imaging and 3D medical image processing. In this paper, we propose a guidance system to support this intervention. Through this intervention, it can solve the problem of the existing 2D medical images based vessel that has a formation of cerebrovascular disease, and guide the real-time tracking and optimal route to the target lesion by intervention catheter and guide wire tool. As a result, the system was completely composed for medical image acquisition unit and image processing unit as well as a display device. The experimental environment, guide services which are provided by the proposed system Brain Phantom (complete intracranial model with aneurysms, ref H+N-S-A-010) was taken with x-ray and testing. To generate a reference image based on the Laplacian algorithm for the image processing which derived from the cerebral blood vessel model was applied to DICOM by Volume ray casting technique. $A^*$ algorithm was used to provide the catheter with a guide wire tracking path. Finally, the result does show the location of the catheter and guide wire providing in the proposed system especially, it is expected to provide a useful guide for future intervention service.

Closure of Atrial Septal Defects through a Video-assisted Mini-thoracotomy (흉강경하 최소절개를 이용한 심방중격결손의 폐쇄)

  • Min, Ho-Ki;Yang, Ji-Hyuk;Jun, Tae-Gook;Park, Pyo-Won;Choi, Seon-Uoo;Park, Seung-Woo;Min, Sun-Kyung;Lee, Jae-Jin
    • Journal of Chest Surgery
    • /
    • v.41 no.5
    • /
    • pp.568-572
    • /
    • 2008
  • Background: Minimally invasive surgery is currently popular, but this has been applied very sparingly to cardiac surgery because of some limitations. Our study evaluated the safety and efficacy of atrial septal defect (ASD) closure through a video-assisted mini-thoracotomy. Material and Method: Fifteen patients were analyzed. Their mean age was $31{\pm}6$ years. The mean ASD size was $24{\pm}5mm$ and there were 3 cases of significant tricuspid regurgitation. The working window was made through the right 4th intercostal space via a $4{\sim}5cm$ inframammary skin incision, CPB was conducted with performing peripheral cannulation. After cardioplegic arrest, the ASDs were closed with a patch (n=11) or direct sutures (n=4), and the procedures were assisted by using a thoracoscope. There were 3 cases of tricuspid repair and 1 case of mitral valve repair. The mean CPB time and aortic occlusion time were $160{\pm}47\;and\;70{\pm}26 $minutes, respectively. Result: There was no mortality, but there were 3 minor complications (one pneumothorax, one wound dehiscence and one arrhythmia). The mean hospital stay was $5.9{\pm}1.8$ days. The mean follow-up duration was $10.7{\pm}6.4$ months. The follow-up echocardiogram noted no residual ASD or significant tricuspid regurgitation. Three patients suffered from pain or numbness. Conclusion: This study showed satisfactory clinical and cosmetic results. Although the operative time is still too long, more experience and specialized equipment would make this technique a good option for treating ASD.

A Study on Construction and Application of Nuclear Grade ESF ACS Simulator (원자력등급 ESF 공기정화계통 시뮬레이터 제작 및 활용에 관한 연구)

  • Lee, Sook-Kyung;Kim, Kwang-Sin;Sohn, Soon-Hwan;Song, Kyu-Min;Lee, Kei-Woo;Park, Jeong-Seo;Hong, Soon-Joon;Kang, Sun-Haeng
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.8 no.4
    • /
    • pp.319-327
    • /
    • 2010
  • A nuclear plant ESF ACS simulator was designed, built, and verified to perform experiment related to ESF ACS of nuclear power plants. The dimension of 3D CAD model was based on drawings of the main control room(MCR) of Yonggwang units 5 and 6. The CFD analysis was performed based on the measurement of the actual flow rate of ESF ACS. The air flowing in ACS was assumed to have $30^{\circ}C$ and uniform flow. The flow rate across the HEPA filter was estimated to be 1.83 m/s based on the MCR ACS flow rate of 12,986 CFM and HEPA filter area of 9 filters having effective area of $610{\times}610mm^2$ each. When MCR ACS was modeled, air flow blocking filter frames were considered for better simulation of the real ACS. In CFD analysis, the air flow rate in the lower part of the active carbon adsorber was simulated separately at higher than 7 m/s to reflect the measured value of 8 m/s. Through the CFD analyses of the ACSes of fuel building emergency ventilation system, emergency core cooling system equipment room ventilation cleanup system, it was confirmed that all three EFS ACSes can be simulated by controlling the flow rate of the simulator. After the CFD analysis, the simulator was built in nuclear grade and its reliability was verified through air flow distribution tests before it was used in main tests. The verification result showed that distribution of the internal flow was uniform except near the filter frames when medium filter was installed. The simulator was used in the tests to confirm the revised contents in Reg. Guide 1.52 (Rev. 3).

A Study on Improvement of Test Method of Nuclear Power Plant ESF ACS by applying Regulatory Guide 1.52 (Rev.3) (Reg. Guide 1.52(Rev.3)를 적용한 원전 ESF 공기정화계통 성능시험법 개선 연구)

  • Lee, Sook-Kyung;Kim, Kwang-Sin;Sohn, Soon-Hwan;Song, Kyu-Min;Lee, Kae-Woo;Park, Jeong-Seo;Cho, Byoung-Ho;Yoo, Byeang-Jea;Hong, Soon-Joon;Kang, Sun-Haeng
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.8 no.4
    • /
    • pp.311-318
    • /
    • 2010
  • U. S. NRC Regulation Guide 1.52 regulating ESF ACS in nuclear power plants has been revised to revision 3. To apply reduction of operability test time, allowance of alternative challenge agents for in-place leak test of HEPA filters, and upgrade of Methyl Iodide penetration acceptance criterion in activated carbon performance test suggested in Reg. Guide 1.52(Rev.3) on Yonggwang units 5 and 6 ESF ACSes, technical feasibility study was carried out with on-site experiments as well as experiments with a lab-scale model. It was confirmed that the moisture in the system returned to the level before the test in 1 or 4 days even though the moisture was removed during the operability test lasting more than 10 hours. Therefore, it is appropriate to perform monthly operability test in 15 minutes just long enough to check the operability of equipment. To change challenge material for in-place HEPA filter leak test, size of aerosol, production rate, and leak detection capability were compared for DOP and PAO. It was concluded that PAO can be substituted for DOP in nuclear power plants. The upgrade of Methyl Iodide penetration acceptance criterion from 0.175 % to 0.5 % in active carbon filter bed deeper than 4 inches was to conform to the change of activated carbon performance test method to ASTM D3803(1989). It was confirmed that Methyl Iodide penetration acceptance criterion of 0.5 % under $30^{\circ}C$, relative humidity 95 % condition was conservatively good enough for testing performance of active carbon insitu. The licence change of Yonggwang units 5 and 6 has been completed based on this study.