• Title/Summary/Keyword: safety certification marking

Search Result 4, Processing Time 0.016 seconds

A Study on the Improvement of Safety Certification Marks Displayed on the Surface of Temporary Equipments at Construction Site (II) : Marking Method and Location (건설현장에 사용되는 가설기자재의 안전인증표시 개선방안 연구(II) : 표시방법 및 표시위치)

  • Jeong, Seong-Choon;Bong, Jin Kyun;Won, Jeong Hun
    • Journal of the Korean Society of Safety
    • /
    • v.33 no.1
    • /
    • pp.95-102
    • /
    • 2018
  • This study investigated the improvement of safety certification marking method and location marked on temporary equipments in order to guarantee the quality and safety of temporary equipments. The survey was performed for the stakeholder (manufacturers, lessors, and users) to find out the effective way that all stakeholder can agree each other. The main reason which users checked the safety certification making is that the mandatory safety certification marking can prevent the usage of poor and illegal temporary equipments. For the marking method, all stakeholder agreed that a depressed engraving method was an effective and usable displaying method. The opinions about the position of safety certification marking among the users, lessors, and manufacturers did not come into the agreement. The manufacturers preferred the marking position in which the engraving process is easy, but users wanted the conspicuous place such as vertical member. However, it is necessary to continuously study ways to adopt the position preferred by the users.

A Study on the Improvement of Safety Certification Marks Displayed on the surface of Temporary Equipments at Construction Site (I) : Stakeholder Cognition Analysis and Marking Contents (건설현장에 사용되는 가설기자재의 안전인증표시 개선방안 연구(I) : 이해관계자 인식 분석 및 표시내용)

  • Kim, Dong Won;Won, Jeong-Hun;Park, Yong Kyu;Lim, SeJong
    • Journal of the Korean Society of Safety
    • /
    • v.32 no.4
    • /
    • pp.59-65
    • /
    • 2017
  • This study examined the stakeholder cognition of the safety certification marking system by surveying manufacturers, lessors, and users. In addition, among various issues about safety certification marking systems, the improvement of safety certification marking contents was suggested in order to guarantee quality of temporary equipments. The results by statistical method show that it is necessary to increase of users' understanding about the safety certification marking system. In addition, the quality management system of temporary equipments should be introduced to control the actual condition that temporary equipments of various product companies are mixed in a site during removal and reuse processes. For detailed marking contents, it is recommended that a certification mark, an identification number, and the production year should be displayed and the manufacturer name could be selectively presented. Detail informations such as a safety certification number, a product company, a model type or name, a specification, a weight, a product number, and the location of a certification mark should be identified by the identification number.

CE Certification for Machinery Safety in Automated LCD Monitor Process (LCD 모니터 공정자동화 장비의 안전성에 대한 CE 인증)

  • Lee, Hwan-Deok;Jung, Won
    • Journal of Applied Reliability
    • /
    • v.11 no.4
    • /
    • pp.419-432
    • /
    • 2011
  • In order to distribute machinery to European Union, it is mandatory to get CE marking to ensure the machinery is safe and reliable. The EHSR(Essential Health and Safety Requirements) of the EC Machinery Directive requires the machinery to be designed and manufactured to prevent from any dangerous situation. This study presents a case of CE Certification in Back Cover Nut Insert Machine and introduces an improvement method of product safety and reliability. This study also presents how to eliminate the deficiencies in design and manufacturing, and the process of applying EHSR for CE Marking.

A Study on the Analysis of Current Situation and the Deduction of Improvement Measure Regarding the Scaffolding and the Related Components at Construction Site (건설 현장 가설기자재 운영현황 분석 및 개선 방안 도출 연구)

  • Jeong, Jin Woo;Kim, Yong Gon
    • Journal of the Korean Society of Safety
    • /
    • v.34 no.5
    • /
    • pp.63-71
    • /
    • 2019
  • Work Guideline of Construction Quality Management was revised in July 2017, and it has changed the perception of scaffolding in South Korea. The on site investigation and survey was performed on manufacturers, leasing companies, and quality inspection agencies regarding the compliance with the guideline for the scaffolding and the related components brought to the site. Moreover, the related guidelines and identified unsatisfactory quality management items were analyzed by each subject. As a result, the major factors that cause the problems were reasonably deducted. The related regulations to prohibit the delivery of faulty scaffolding components to the construction site in order to secure the safety of the temporary structure was suggested.