Proceedings of the Safety Management and Science Conference
/
2007.11a
/
pp.305-309
/
2007
This study introduces acceptance sampling plans and procedures for the inspection of bulk materials. This paper also presents statistical aspects of sampling bulk materials such as general principles and sampling of particulate materials.
Jeong, Jee Yeon;Kang, Tae Sun;Lee, Seung Gill;Park, Hae Dong;Kim, Ki Youn
Journal of Korean Society of Occupational and Environmental Hygiene
/
v.27
no.2
/
pp.105-114
/
2017
Objectives: The Ministry of Employment and Labor's enforcement programs, such as workplace monitoring inspection, are one of the major public efforts to protect worker's health. Therefore, a more effective inspection method is required for workplace monitoring, which is helpful for controlling health hazards in the workplace. Methods: For this study, we investigated the related safety and health laws, regulations, and inspection guidelines from the USA, Japan, and Korea. We also analyzed the provisions of industrial safety and health acts, which are related to enhancing the reliability of workplace monitoring. We applied the process of opinion convergence through an experts meeting for our research. Results: We proposed an efficient inspection scheme for workplace monitoring that includes how to select companies(mainly randomized inspections by using a workplace measurement database and workers' compensation insurance database), how to proceed with the inspection process(mainly unannounced visits), and who should carry out this project. Conclusions: We conclude that our proposal for the inspection of workplace monitoring could be a very effective tool for reducing the numbers of companies that do not undertake workplace monitoring and could produce reliable monitoring results.
This study analyzed how the installation of a pressure gauge in the indoor fire hydrant of an apartment building affected identifying pressurized water in the pipe, making it easier to conduct internal inspection on the fire suppression system, and ensuring reliability of fire suppression. The following are the study's results: First, identifying pressurized water in the indoor firefighting pipe had a positive effect on the installation of a pressure gauge in the indoor fire hydrant. This implies that a higher level of identification of pressurized water in the indoor firefighting pipe had a positive impact on improving the installation and use of a pressure gauge in the indoor fire hydrant. Second, making it easier for the fire safety officer to inspect the fire suppression system had a positive effect on the installation of a pressure gauge in the indoor fire hydrant. This suggests that if it becomes easier for the apartment building's stakeholder to conduct internal inspection or the firefighting facility manager to carry out inspection on the fire suppression system, it would have a positive effect on the installation of a pressure gauge in the indoor fire hydrant. Finally, ensuring reliability in fire suppression had a positive effect on the installation of a pressure gauge in the indoor fire hydrant. This implies that if it becomes easier to identify pressurized water in the indoor firefighting pipe, for the fire safety officer to conduct internal inspection, or for the firefighting facility manager to carry out inspection in accordance with the fire suppression system's internal inspection requirements, it would increase reliability in fire suppression, making it more necessary to install a pressure gauge in the indoor fire hydrant.
Journal of Korean Society of Disaster and Security
/
v.15
no.4
/
pp.31-38
/
2022
In the case of special bridges whose superstructure is supported by cables, there are many blind spots that are difficult to access without special equipment and personnel. As a result, there are difficulties in the safety inspection of special bridges. The purpose of this study is to review the inspection blind spots of cable-supported bridges such as cable-stayed bridges and suspension bridges, and to study ways to eliminate blind spots using drones. To this end, the cables, stiffened girder, and pylons of the cable-stayed bridge located in the sea were inspected using drones. Through this study, it was confirmed that external safety inspection of special bridges that are difficult for inspectors to access is possible using drones. In particular, drone inspection to check the external condition and damage of the pylon, which is a blind spot for inspection of special bridges, is a very effective safety inspection method.
Journal of the Korean Society for Aviation and Aeronautics
/
v.24
no.2
/
pp.59-67
/
2016
The checklist currently used for Aviation safety inspection performed by ASIs consists of inspection groups and multiple items, it does not have structured hierarchy system which required to efficiently process aviation safety analysis. On this study, through mapping taxonomy of HFACS onto current checklist to secure structured hierarchy system and present a specification on systematic frequency and severity to perform safety risk assessment of detected hazard.
The particulate matter that was emitted always come up by atmospheric environmental problem. Running on the road vehicles must have regular inspection at regular period and make sure the emissions of exhaust gases exceed the legal standards. Emission test for the atmospheric environment, but it is not free from the particulate matter. Currently, emission test of vehicle inspection is divided into regular inspection and close inspection. Regular inspection and close inspection differ not only the method of emission test, but also the facility standards that must have for this inspection. According to the "Regulations on the Implementation of Comprehensive vehicle Inspection, etc.", close inspection must have trapping device that is trap particulate matter by emission test to vehicle. However, regular inspection is different. Regular inspection do not specify any criteria for trapping facilities. Therefore, this study is confirm how to prevent the emission of particulate matter to the atmosphere during the year when mandatory trapping facilities are required to trapped particulate matter in the regular inspection.
Corrosion assessment has a number of uses but the use considered here is as a precursor to Risk-Based Inspection (RBI) planning. Systematic methods consisting of technical modules of RBI program were used to assess the effect of specific corrosion mechanism on the probability of failure in equipments of petrochemical plants. Especially in part of the damage and corrosion assessment, screening step involved evaluating the combinations of process conditions and construction materials for each equipment item in order to determine which damage mechanisms are potentially active. For general internal corrosion, either API 510 or API 570 was applied as the damage rate in the calculation to determine the remaining life and inspection frequency. In some cases, a measured rate of corrosion may not be available. The technical modules of RBI program employ default values for corrosion, typically derived from published data or from experience with similar processes, for use until inspection results are available. This paper describes the case study of corrosion and damage assessment by using RBI methodology in petrochemical plant. Specifically, this paper reports the methodology and the results of its application to the petrochemical units using the $KGS-RBI^{TM}$ program, developed by the Korea Gas Safety Corporation to suit Korean situation in conformity with API 581 Codes.
A research was conducted on Seoul regional elementary, middle, and high school nutritionists to study about their perception of HACCP control standards & performance conditions and sanitation & safety inspection, to seek for more efficient methods of school meals' sanitation system settlement. All surveys were distributed and collected via email. A total of 305 survey papers were collected, and out of these, 300 school results were analyzed. As for CCP 1 performance conditions, 43.3% of the nutritionist put emphasis on temperature control for cooking duration and 71.0% said that they manage both temperature and PHF food control. In CCP 2 stage, 65.8% of the nutritionists maintained the food's temperature, and 56.7% documented the recordings after cooking. A total of 79.3% of the schools scored above 90 points on school meal sanitation & safety inspection, 3.72 points on necessity for revisions, 3.38 points on objectivity, and 3.34 points on reliability. As for these results, a clear CCP control criteria as well as training must be set. Also, because the necessity of revision for sanitation & safety inspection is higher than reliability and objectivity, appropriate complementary measures must be taken.
During the last ten years, the need has been increase for reducing maintenance cost for aged equipments are ensuring safety, efficiency and profitability of petrochemical and refinery plants. American Petroleum institute(API) developed a code, API 581 for proposing standard procedures of risk based inspection. Even though the API 581 code covers general RBI procedures, there must be some limitations. In this study, a semi-quantitative assessment algorithm for RBI based on the API 581 code was reconstructed for developing an RBI software. The user-friendly realRBI software is developed with a module for evaluation semi-quantitative risk category using the potential consequence factor and the likelihood factor. Also, inspection planning module for inspection time and inspection method for equipments are included.
Journal of Korean Tunnelling and Underground Space Association
/
v.24
no.2
/
pp.183-192
/
2022
Function and performance degradation in tunnel structure can cause road's function loss, proactive maintenance is needed to prevent the initial damage from progressing to intensified damage. Inspection and diagnosis are implemented in accordance with regulations, but it does not fully reflect maintenance processes such as inspection and diagnosis, planning rehabilitation and carrying out. It was carried out for 5,540 cases inspection and diagnosis result in 1,728 tunnels was analyzed to suggest rational maintenance plan in this study.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.