• Title/Summary/Keyword: safety Inspection

Search Result 1,994, Processing Time 0.029 seconds

Inspection and Sampling for Bulk Materials (집합체의 검사와 샘플링)

  • Choi, Sung-Woon
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2007.11a
    • /
    • pp.305-309
    • /
    • 2007
  • This study introduces acceptance sampling plans and procedures for the inspection of bulk materials. This paper also presents statistical aspects of sampling bulk materials such as general principles and sampling of particulate materials.

  • PDF

An improvement plan for a workplace monitoring system through random selection of workplaces and unnoticed measurement inspection (사업장 무작위 선정 및 불시측정 방식을 통한 작업환경측정제도 신뢰성 제고 방안)

  • Jeong, Jee Yeon;Kang, Tae Sun;Lee, Seung Gill;Park, Hae Dong;Kim, Ki Youn
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.27 no.2
    • /
    • pp.105-114
    • /
    • 2017
  • Objectives: The Ministry of Employment and Labor's enforcement programs, such as workplace monitoring inspection, are one of the major public efforts to protect worker's health. Therefore, a more effective inspection method is required for workplace monitoring, which is helpful for controlling health hazards in the workplace. Methods: For this study, we investigated the related safety and health laws, regulations, and inspection guidelines from the USA, Japan, and Korea. We also analyzed the provisions of industrial safety and health acts, which are related to enhancing the reliability of workplace monitoring. We applied the process of opinion convergence through an experts meeting for our research. Results: We proposed an efficient inspection scheme for workplace monitoring that includes how to select companies(mainly randomized inspections by using a workplace measurement database and workers' compensation insurance database), how to proceed with the inspection process(mainly unannounced visits), and who should carry out this project. Conclusions: We conclude that our proposal for the inspection of workplace monitoring could be a very effective tool for reducing the numbers of companies that do not undertake workplace monitoring and could produce reliable monitoring results.

An Analysis on the Effect of Pressure System Installation on the Pipeline to Identify Pressurized Water and Self-inspection Ease in Apartment Building (아파트에 설치하는 옥내소화전 압력계 설치가 배관의 가압수 식별 및 자체점검 용이성 간의 영향 분석)

  • Son, Joo-Dal;Kong, Ha-Sung
    • Journal of the Korea Safety Management & Science
    • /
    • v.22 no.1
    • /
    • pp.33-44
    • /
    • 2020
  • This study analyzed how the installation of a pressure gauge in the indoor fire hydrant of an apartment building affected identifying pressurized water in the pipe, making it easier to conduct internal inspection on the fire suppression system, and ensuring reliability of fire suppression. The following are the study's results: First, identifying pressurized water in the indoor firefighting pipe had a positive effect on the installation of a pressure gauge in the indoor fire hydrant. This implies that a higher level of identification of pressurized water in the indoor firefighting pipe had a positive impact on improving the installation and use of a pressure gauge in the indoor fire hydrant. Second, making it easier for the fire safety officer to inspect the fire suppression system had a positive effect on the installation of a pressure gauge in the indoor fire hydrant. This suggests that if it becomes easier for the apartment building's stakeholder to conduct internal inspection or the firefighting facility manager to carry out inspection on the fire suppression system, it would have a positive effect on the installation of a pressure gauge in the indoor fire hydrant. Finally, ensuring reliability in fire suppression had a positive effect on the installation of a pressure gauge in the indoor fire hydrant. This implies that if it becomes easier to identify pressurized water in the indoor firefighting pipe, for the fire safety officer to conduct internal inspection, or for the firefighting facility manager to carry out inspection in accordance with the fire suppression system's internal inspection requirements, it would increase reliability in fire suppression, making it more necessary to install a pressure gauge in the indoor fire hydrant.

Cable-supported Bridge Safety Inspection Blind Spot Elimination Technology using Drones (드론을 활용한 케이블지지교량 안전점검 사각지대 해소 기술)

  • Sungjin Lee;Bongchul Joo;Jungho Kim
    • Journal of Korean Society of Disaster and Security
    • /
    • v.15 no.4
    • /
    • pp.31-38
    • /
    • 2022
  • In the case of special bridges whose superstructure is supported by cables, there are many blind spots that are difficult to access without special equipment and personnel. As a result, there are difficulties in the safety inspection of special bridges. The purpose of this study is to review the inspection blind spots of cable-supported bridges such as cable-stayed bridges and suspension bridges, and to study ways to eliminate blind spots using drones. To this end, the cables, stiffened girder, and pylons of the cable-stayed bridge located in the sea were inspected using drones. Through this study, it was confirmed that external safety inspection of special bridges that are difficult for inspectors to access is possible using drones. In particular, drone inspection to check the external condition and damage of the pylon, which is a blind spot for inspection of special bridges, is a very effective safety inspection method.

A Structural Design of Aviation Safety Inspection Checklist for Safety Information Analysis and Safety Risk Assessment (안전정보분석 및 안전위험평가를 위한 항공안전감독 점검표 구조 설계)

  • Choi, Dongwook;Choi, Soonji;Choi, Young J.
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.24 no.2
    • /
    • pp.59-67
    • /
    • 2016
  • The checklist currently used for Aviation safety inspection performed by ASIs consists of inspection groups and multiple items, it does not have structured hierarchy system which required to efficiently process aviation safety analysis. On this study, through mapping taxonomy of HFACS onto current checklist to secure structured hierarchy system and present a specification on systematic frequency and severity to perform safety risk assessment of detected hazard.

Effects of Regular Inspection Facility Standards Improvement on Particulate Matter (PM10) Emissions (정기검사 시설기준 개선이 입자상물질(PM10) 배출에 미치는 영향)

  • Choi, Soungkyu;Kim, Yongdal;Lee, Jaeyoung;Kim, Hogyeong;Noh, Kiseong;Park, Jungsoo
    • Journal of Auto-vehicle Safety Association
    • /
    • v.11 no.1
    • /
    • pp.36-39
    • /
    • 2019
  • The particulate matter that was emitted always come up by atmospheric environmental problem. Running on the road vehicles must have regular inspection at regular period and make sure the emissions of exhaust gases exceed the legal standards. Emission test for the atmospheric environment, but it is not free from the particulate matter. Currently, emission test of vehicle inspection is divided into regular inspection and close inspection. Regular inspection and close inspection differ not only the method of emission test, but also the facility standards that must have for this inspection. According to the "Regulations on the Implementation of Comprehensive vehicle Inspection, etc.", close inspection must have trapping device that is trap particulate matter by emission test to vehicle. However, regular inspection is different. Regular inspection do not specify any criteria for trapping facilities. Therefore, this study is confirm how to prevent the emission of particulate matter to the atmosphere during the year when mandatory trapping facilities are required to trapped particulate matter in the regular inspection.

Corrosion Assessment by Using Risk-Based Inspection Method for Petrochemical Plant - Practical Experience

  • Choi, Song-Chun;Song, Ki-Hun
    • Corrosion Science and Technology
    • /
    • v.8 no.3
    • /
    • pp.119-125
    • /
    • 2009
  • Corrosion assessment has a number of uses but the use considered here is as a precursor to Risk-Based Inspection (RBI) planning. Systematic methods consisting of technical modules of RBI program were used to assess the effect of specific corrosion mechanism on the probability of failure in equipments of petrochemical plants. Especially in part of the damage and corrosion assessment, screening step involved evaluating the combinations of process conditions and construction materials for each equipment item in order to determine which damage mechanisms are potentially active. For general internal corrosion, either API 510 or API 570 was applied as the damage rate in the calculation to determine the remaining life and inspection frequency. In some cases, a measured rate of corrosion may not be available. The technical modules of RBI program employ default values for corrosion, typically derived from published data or from experience with similar processes, for use until inspection results are available. This paper describes the case study of corrosion and damage assessment by using RBI methodology in petrochemical plant. Specifically, this paper reports the methodology and the results of its application to the petrochemical units using the $KGS-RBI^{TM}$ program, developed by the Korea Gas Safety Corporation to suit Korean situation in conformity with API 581 Codes.

A Research Study on Seoul Region School Nutritionists' Perception of HACCP System, CCP Control Standards & Performance Conditions and Sanitation & Safety Inspection - Focusing on CCP 1 & CCP 2 - (서울지역 학교 영양(교)사의 HACCP 시스템 CCP 관리기준 수행실태 및 위생·안전점검에 대한 인식 조사 연구 - CCP 1과 CCP 2를 중심으로 -)

  • Kim, Gyoung-Mi;Lee, Ae-Rang
    • The Korean Journal of Food And Nutrition
    • /
    • v.27 no.3
    • /
    • pp.447-457
    • /
    • 2014
  • A research was conducted on Seoul regional elementary, middle, and high school nutritionists to study about their perception of HACCP control standards & performance conditions and sanitation & safety inspection, to seek for more efficient methods of school meals' sanitation system settlement. All surveys were distributed and collected via email. A total of 305 survey papers were collected, and out of these, 300 school results were analyzed. As for CCP 1 performance conditions, 43.3% of the nutritionist put emphasis on temperature control for cooking duration and 71.0% said that they manage both temperature and PHF food control. In CCP 2 stage, 65.8% of the nutritionists maintained the food's temperature, and 56.7% documented the recordings after cooking. A total of 79.3% of the schools scored above 90 points on school meal sanitation & safety inspection, 3.72 points on necessity for revisions, 3.38 points on objectivity, and 3.34 points on reliability. As for these results, a clear CCP control criteria as well as training must be set. Also, because the necessity of revision for sanitation & safety inspection is higher than reliability and objectivity, appropriate complementary measures must be taken.

Development of RBI Procedures and Implementation of a Software Based on API Code (II) - Semi-Quantitative Approach (API 기준에 근거한 RBI 절차 개발 및 소프트웨어의 구현 (II) -준정량적 접근법-)

  • Song, Jung-Soo;Shim, Sang-Hoon;Kwon, Jung-Rock;Yoon, Kee-Bong
    • Journal of the Korean Society of Safety
    • /
    • v.17 no.4
    • /
    • pp.110-118
    • /
    • 2002
  • During the last ten years, the need has been increase for reducing maintenance cost for aged equipments are ensuring safety, efficiency and profitability of petrochemical and refinery plants. American Petroleum institute(API) developed a code, API 581 for proposing standard procedures of risk based inspection. Even though the API 581 code covers general RBI procedures, there must be some limitations. In this study, a semi-quantitative assessment algorithm for RBI based on the API 581 code was reconstructed for developing an RBI software. The user-friendly realRBI software is developed with a module for evaluation semi-quantitative risk category using the potential consequence factor and the likelihood factor. Also, inspection planning module for inspection time and inspection method for equipments are included.

A study on the improvement plans of precision safety inspection and precision safety diagnosis in tunnel structure (터널구조물 정밀안전점검 및 정밀안전진단 개선방안 고찰)

  • Lee, Gyu-Phil;Kim, Jeong-Heum
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.2
    • /
    • pp.183-192
    • /
    • 2022
  • Function and performance degradation in tunnel structure can cause road's function loss, proactive maintenance is needed to prevent the initial damage from progressing to intensified damage. Inspection and diagnosis are implemented in accordance with regulations, but it does not fully reflect maintenance processes such as inspection and diagnosis, planning rehabilitation and carrying out. It was carried out for 5,540 cases inspection and diagnosis result in 1,728 tunnels was analyzed to suggest rational maintenance plan in this study.