• Title/Summary/Keyword: s/w test bed

Search Result 36, Processing Time 0.026 seconds

Development of a Grain Circulating Type Natural Air In-bin Dryer (I) - Development of dryer and analysis of drying performance (곡물 순환식의 상온통풍 건조기 개발(I) - 건조기 개발 및 벼의 건조성능 분석)

  • Yun, H. S.;Chung, H.;Cho, Y. G.;Park, W. K.
    • Journal of Biosystems Engineering
    • /
    • v.25 no.3
    • /
    • pp.227-232
    • /
    • 2000
  • A natural air in-bin grain dryer with a grain circulator was developed for on farm use. Natural air drying test for rough rice was carried out to evaluate drying rate, uniformity of moisture content distribution in grain bed and energy consumption. It took 10 days to dry 8 ton of paddy rice from 21.9%(w.b) of moisture contents to 16.7%(w.b), by prototype dryer and the average drying rate was 0.52%/day. The uniformity of moisture content after drying was superior to a conventional natural air dryer in which grains were not mixed during drying periods. The dryer performance evaluation index was 738.3kJ/(kg.water), which was more effective than that of grain circulation type hot air dryer(3,500∼5,000 kJ/kg.water)

  • PDF

A Study on the Prediction of the Effective Elastic Modulus of the Silicon Shock Programmer under Various Impact Velocities (충돌 속도에 따른 실리콘 충격 프로그래머의 유효 탄성 계수 예측에 관한 연구)

  • Yang, T.H.;Lee, Y.S.;Kim, Y.J.;Kim, T.H.;Shu, C.W.;Yang, M.S.;An, C.H.;Lee, G.S.
    • Journal of the Korean Society of Safety
    • /
    • v.29 no.1
    • /
    • pp.15-20
    • /
    • 2014
  • The silicon as the hyper-elastic material was used to design the shock programmer and dynamic characteristic of the shock programmer was studied. The shock programmer was a structure part that was mounted between the impactor and the test bed. The role of the shock programmer was to generate the acceleration time history by the objective of various impact tests. The effective elastic modulus of the silicon was varied under the velocity of the impactor. The effective elastic modulus of the silicon was estimated by the comparison with results between test and simulation.

A Study on Construction Site of Virtual Desktop Infrastructure (VDI) System Model for Cloud Computing BIM Service

  • Lee, K.H.;Kwon, S.W.;Shin, J.H.;Choi, G.S.;Moon, D.Y.
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.665-666
    • /
    • 2015
  • Recently BIM technology has been expanded for using in construction project. However its spread has been delayed than the initial expectations, due to the high-cost of BIM infrastructure development, the lack of regulations, the lack of process and so forth. In construction site phase, especially the analysis of current research trend about IT technologies, virtualization and BIM service, data exchange such as drawing, 3D model, object data, properties using cloud computing and virtual server system is defined as a most successful solution. The purpose of this study is enable the cloud computing BIM server to provide several main function such as edit a model, 3D model viewer and checker, mark-up, snapshot in high-performance quality by proper design of VDI system. Concurrent client connection performance is a main technical index of VDI. Through test-bed server client, developed VDI system's multi-connect control will be evaluated. The performance-test result of BIM server VDI will effect to development direction of cloud computing BIM service for commercialization.

  • PDF

Commissioning result of the KSTAR in-vessel cryo-pump

  • Chang, Y.B.;Lee, H.J.;Park, Y.M.;Lee, Y.J.;Kwag, S.W.;Song, N.H.;Park, D.S.;Joo, J.J.;Moon, K.M.;Kim, N.W.;Yang, H.L.;Oh, Y.K.
    • Progress in Superconductivity and Cryogenics
    • /
    • v.15 no.4
    • /
    • pp.53-58
    • /
    • 2013
  • KSTAR in-vessel cryo-pump has been installed in the vacuum vessel top and bottom side with up-down symmetry for the better plasma density control in the D-shape H-mode. The cryogenic helium lines of the in-vessel cryo-pump are located at the vertical positions from the vacuum vessel torus center 2,000 mm. The inductive electrical potential has been optimized to reduce risk of electrical breakdown during plasma disruption. In-vessel cryo-pump consists of three parts of coaxial circular shape components; cryo-panel, thermal shield and particle shield. The cryo-panel is cooled down to below 4.5 K. The cryo-panel and thermal shields were made by Inconel 625 tube for higher mechanical strength. The thermal shields and their cooling tubes were annealed in air environment to improve the thermal radiation emissivity on the surface. Surface of cryo-panel was electro-polished to minimize the thermal radiation heat load. The in-vessel cryo-pump was pre-assembled on a test bed in 180 degree segment base. The leak test was carried out after the thermal shock between room temperature to $LN_2$ one before installing them into vacuum vessel. Two segments were welded together in the vacuum vessel and final leak test was performed after the thermal shock. Commissioning of the in-vessel cryo-pump was carried out using a temporary liquid helium supply system.

A Digital Convergence Platform based on the MPEG-21 Multimedia Framework (MPEG-21기반 디지털 컨버젼스 플랫폼 기술)

  • Oh, Hwa-Yong;Kim, Dong-Hwan;Lee, Eun-Seo;Chang, Tae-Gyu
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.56 no.5
    • /
    • pp.987-989
    • /
    • 2007
  • This paper describes a digital convergence platform(DCP) which is implemented based on the MPEG-21 multimedia framework. DCP is a newly proposed solution in this research for the convergence service of future home multimedia environment. DCP is a common platform designed to have the feature of reconfigurability, by means of S/W. which supports to run diverse digital multimedia services. A distributed peer to peer service and transaction model is also a new feature realized in DCP using the MPEG-21 multimedia framework. A prototype DCP is implemented to verify its functions of multimedia service and transactions. The developed DCPs are networked with IP clustering storage systems for the distributed service of multimedia. Successful streaming services of the MPEG-2/4 video and audio are verified with the implemented test-bed system of DCP.

Development of Adaptive Home Power Peak-Cut Control System Using Power Line Communication (전력선통신을 이용한 소규모 주택용 맞춤형 전력피크 제어시스템 개발)

  • Kim, Sang-Dong;Park, Ji-Ho;Kim, Dong-Wan
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.65 no.1
    • /
    • pp.219-226
    • /
    • 2016
  • In this paper, adaptive home power peak-cut control system is developed using PLC. The developed scheme provides monitoring of power usage, power peak-cut control and additional function. In test bed, zone is presented by bedroom, living room, kitchen and bathroom. And individual load is presented by lighting, heater and fan in zone. In developed scheme, zone control is implemented by single PLC modem. And individual load control is implemented by key-map table. In addition, power peak-cut control system S/W, which can perform setting of power peak, power peak-cut control and monitoring of power usage.

Design A High Efficiency Auxiliary Power Supply with Wide Input Voltage Range for PV-PCS

  • Jin, Cheng-hao;Li, Shan-mei;Kim, Jin-tae
    • Proceedings of the KIPE Conference
    • /
    • 2012.07a
    • /
    • pp.343-344
    • /
    • 2012
  • In high power PV generation system, the solar cell normally generates wide output voltage depending on the insolation, cell's temperature and shade effect. This paper will propose a high efficiency converter allowing the wide input voltage to supply stable voltage with the controller and operation for the PV generation system. The proposed converter consists of two stages comprising SEPIC with a coupled inductor and LLC, which generates 24 V of output at the final output terminal. In this paper, a design method and experimental results with a test-bed of 50 W will be presented to validate the proposed converter.

  • PDF

Control of Hydraulic Excavator Using Self Tuning Fuzzy Sliding Mode Control (자기 동조형 퍼지 슬라이딩 모드 제어를 이용한 유압 굴삭기의 제어)

  • Kim Dongsik;Kim Dongwon;Park Gwi-Tae;Seo Sam-Jun
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.11 no.2
    • /
    • pp.160-166
    • /
    • 2005
  • In this paper, to overcome drawbacks of FLC a self tuning fuzzy sliding mode controller is proposed, which controls the position of excavator's attachment, which can be regarded as an ill-defined system. It is reported that fuzzy logic theory is especially useful in the control of ill-defined system. It is important in the design of a FLC to derive control rules in which the system's dynamic characteristics are taken into account. Control rules are usually established using trial and error methods. However, in the case where the dynamic characteristics vary with operating conditions, as in the operation of excavator attachment, it is difficult to find out control rules in which all the working condition parameters are considered. Experiments are carried out on a test bed which is built around a commercial Hyundai HX-60W hydraulic excavator. The experimental results show that both alleviation of chattering and performance are achieved. Fuzzy rules are easily obtained by using the proposed method and good performance in the following the desired trajectory is achieved. In summary, the proposed controller is very effective control method for the position control of the excavator's attachment.

Movement range and behavior characteristics of Pagrus major by acoustic telemetry in Byeonsan Peninsular, Korea (음향 텔레메트리에 의한 변산반도에서의 참돔(Pagrus major)의 이동 범위 및 행동 특성)

  • HEO, Gyeom;HEO, Min-A;KANG, Kyoungmi;HWANG, Doo-Jin;SHIN, Hyeon-Ok
    • Journal of the Korean Society of Fisheries and Ocean Technology
    • /
    • v.57 no.1
    • /
    • pp.34-44
    • /
    • 2021
  • In order to collect basic information of response behavior of red seabream (Pagrus major) during pilling, works for constructing wind power station in Byeonsan Peninsular, Korea were investigated. Four cultured red seabream CRB1 to CRB4 [total length (TL): 27.1 ± 1.0 cm; body weight: 359 ± 30 g] were tagged with an acoustic tag and used in experiment. CRB1 and CRB2 to CBR4 were released on the sea surface at same time around the constructing site of the wind power plant on September 22, 2017 and July 18, 2018, respectively. The tracking of the CRB1 to CRB2 and CRB3 to CRB4 were conducted for two hours, approximately, using VR100 receiver including a directional hydrophone and VR2W receivers array consisted of 19 presence/absence receivers (VR2W receivers), respectively. The underwater noise level before (no pile driving works) and during pile driving works was measured 116.0-118.0 dB (re 1��Pa) and a maximum of 160 dB (re 1��Pa), respectively. CRB1 moved about 6.0 km with average swimming speed of 80.2 ± 20.5 cm/s for 2.1 hours without pile driving work. The average water depth of the sea bed on the route of CRB1 was 9.1 ± 0.4 m. CRB2 moved about 7.3 km with the average swimming speed of 96.8 ± 27.1 cm/s for 2.1 hours with pile driving work. The water depth of the sea bed on the route of CRB2 was 11.9 ± 0.6 m. At results of the Rayleigh's z-test two fishes CRB1 and CRB2 showed significant directionality in the movement (p < 0.01). Movement mean angles of CRB1 and CRB2 were 92.7 and 251.8°, respectively. CRB2, CRB3 and CRB4 exhibited the escaping behavioral response from the noise of source during the pile driving work. The swimming speed of the CRB2 exposed on the heavy underwater noise stimuli due to the pile driving work was 1.21 times faster than that of the CRB1 exposed on the ambient underwater noise in the study site.

FISSION PRODUCT AND ACTINIDE RELEASE FROM THE DEBRIS BED TEST PHEBUS FPT4: SYNTHESIS OF THE POST TEST ANALYSES AND OF THE REVAPORISATION TESTING OF THE PLENUM SAMPLES

  • Bottomley P.D.W.;Gregoire A.C.;Carbol P.;Glatz J.P.;Knoche D.;Papaioannou D.;Solatie D.;Van Winckel S.;Gregoire G.;Jacquemain D.
    • Nuclear Engineering and Technology
    • /
    • v.38 no.2
    • /
    • pp.163-174
    • /
    • 2006
  • The $Ph{\acute{e}}bus$ FP project is an international reactor safety project. Its main objective is to study the release, transport and retention of fission products in a severe accident of a light water reactor (LWR). The FPT4 test was performed with a fuel debris bed geometry, to look at late phase core degradation and the releases of low volatile fission products and actinides. Post Test Analyses results indicate that releases of noble gases (Xe, Kr) and high-volatile fission products (Cs, I) were nearly complete and comparable to those obtained during $Ph{\acute{e}}bus$ tests performed with a fuel bundle geometry (FPT1, FPT2). Volatile fission products such as Mo, Te, Rb, Sb were released significantly as in previous tests. Ba integral release was greater than that observed during FPT1. Release of Ru was comparable to that observed during FPT1 and FPT2. As in other $Ph{\acute{e}}bus$ tests, the Ru distribution suggests Ru volatilization followed by fast redeposition in the fuelled section. The similar release fraction for all lanthanides and fuel elements suggests the released fuel particles deposited onto the plenum surfaces. A blockage by molten material induced a steam by-pass which may explain some of the low releases. The revaporisation testing under different atmospheres (pure steam, $H_2/N_2$ and steam /$H_2$) and up to $1000^{\circ}C$ was performed on samples from the first upper plenum. These showed high releases of Cs for all the atmospheres tested. However, different kinetics of revaporisation were observed depending on the gas composition and temperature. Besides Cs, significant revaporisations of other elements were observed: e.g. Ag under reducing conditions, Cd and Sn in steam-containing atmospheres. Revaporisation of small amounts of fuel was also observed in pure steam atmosphere.