• Title/Summary/Keyword: runoff hydrograph

Search Result 273, Processing Time 0.024 seconds

Review on Application Tolerance of Unit Hydrograph for Calculating Flood Runoff Hydrograph (홍수 유출 수문곡선 산출에 단위유량도 적용 오차의 정도 검토)

  • Yoo, Ju-Hwan;Yoon, Yeo-Jin
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2010.05a
    • /
    • pp.346-349
    • /
    • 2010
  • In this study several unit hydrographs by rainfall storms are derived and moving averaged unit hydrograph is extracted from them based on the rainfall-runoff data in a small basin 8.5 $km^2$ wide. And peak discharges and peak times of the unit hydrographs are investigated and reviewed. And then a representative unit hydrograph of the moving averaged one is applied to the linear convolution integration for obtaining the flood discharge hydrograph and peak discharge and time of its result are researched and inspected. Variance in application of the representative unit hydrograph in a basin on assumption of linearity is appeared and this is given as a counterevidence about that the runoff response from rainfall on a basin has nonlinear characteristics. And As a result of application of derived representative unit hydrograph the errors in peak discharge and time are investigated.

  • PDF

A study on the flood runoff analysis with TANK MODEL (탱크 모델에 의한 홍수(洪水) 유출량(流出量) 해석(解析)에 관(關)한 연구(硏究))

  • Hong, Chang-sun;Choi, Han-kuy
    • Journal of Industrial Technology
    • /
    • v.3
    • /
    • pp.95-101
    • /
    • 1983
  • This study aims at the determination of the coefficienties of runoff and infiltration affecting runoff. The rating curve is more available than the peak flood runoff to determine flood control plan of flood control reservoir and the volume of hydroelectric power plant, or to make multipurpose dam. In hydrologic analysis and design, it is necessary to develop relations between precipitation and runoff, possible using some of the factors affecting runoff as parameters. In order to calculate the runoff discharge, the runoff process constituting elements are divided to the surface runoff, the subsurface runoff and the groundwater runoff. By comparing the computed hydrograph with the measured hydrograph, determinned the watershed TANK Model constant Varying the tank model constant for approximating the computed hydrograph to the measured hydrograph.

  • PDF

Assessing Unit Hydrograph Parameters and Peak Runoff Responses from Storm Rainfall Events: A Case Study in Hancheon Basin of Jeju Island

  • Kar, Kanak Kanti;Yang, Sung-Kee;Lee, Jun-Ho
    • Journal of Environmental Science International
    • /
    • v.24 no.4
    • /
    • pp.437-447
    • /
    • 2015
  • Estimation of runoff peak is needed to assess water availability, in order to support the multifaceted water uses and functions, hence to underscore the modalities for efficient water utilization. The magnitude of storm rainfall acts as a primary input for basin level runoff computation. The rainfall-runoff linkage plays a pivotal role in water resource system management and feasibility level planning for resource distribution. Considering this importance, a case study has been carried out in the Hancheon basin of Jeju Island where distinctive hydrological characteristics are investigated for continuous storm rainfall and high permeable geological features. The study aims to estimate unit hydrograph parameters, peak runoff and peak time of storm rainfalls based on Clark unit hydrograph method. For analyzing observed runoff, five storm rainfall events were selected randomly from recent years' rainfall and HEC-hydrologic modeling system (HMS) model was used for rainfall-runoff data processing. The simulation results showed that the peak runoff varies from 164 to 548 m3/sec and peak time (onset) varies from 8 to 27 hours. A comprehensive relationship between Clark unit hydrograph parameters (time of concentration and storage coefficient) has also been derived in this study. The optimized values of the two parameters were verified by the analysis of variance (ANOVA) and runoff comparison performance were analyzed by root mean square error (RMSE) and Nash-Sutcliffe efficiency (NSE) estimation. After statistical analysis of the Clark parameters significance level was found in 5% and runoff performances were found as 3.97 RMSE and 0.99 NSE, respectively. The calibration and validation results indicated strong coherence of unit hydrograph model responses to the actual situation of historical storm runoff events.

A Determination of Design Flood for a small Basin by Unit Hydrograph Method (단위유량도법에 의한 소유역의 계획홍수량 결정)

  • 윤용남;침순보
    • Water for future
    • /
    • v.9 no.2
    • /
    • pp.76-86
    • /
    • 1976
  • The 30-year design flood hydrograph for the Musim Representative Basin, one of the study basins of the International Hydrological Program, is synthesized by the method of unit hydrograph. The theory of unit hydrograph has been well known for a long time. However, the synthesis of flood hydrograph by this method for a basin with insufficient hydrologic data is not an easy task and hence, assumptions and engineering judgement must be exercized. In this paper, the problems often encountered in applying the unit hydrograph method are exposed and solved in detail based on the theory and rational judgement. The probability rainfall for Cheonju Station is transposed to the Musim Basin since it has not been analyzed due to short period of rainfall record. The duration of design rainfall was estimated based on the time of concentration for the watershed. The effective rainfall was determined from the design rainfall using the SCS method which is commonly used for a small basin. The spatial distribution of significant storms was expressed as a dimensionless rainfall mass curve and hence, it was possible to determine the hyetograph of effective design storm. To synthesize the direct runoff hydrograph the 15-min. unit hydrograph was derived by the S-Curve method from the 1-hr unit hydrograph which was obtained from the observed rainfall and runoff data, and then it was applied to the design hyetograph. The exsisting maximum groundwater depletion curve was derived by the base flow seperation. Hence, the design flood hydrograph was obtained by superimposing the groundwater depletion curve to the computed direct runoff hydrograph resulting from the design storm.

  • PDF

Determination of Flood Hydrograph by Remote Sensing Techniques in a Small Watershed (원격탐사 기법에 의한 소유역의 홍수 수문곡선 결정)

  • 남현옥;박경윤;조성익
    • Korean Journal of Remote Sensing
    • /
    • v.5 no.1
    • /
    • pp.13-27
    • /
    • 1989
  • In recent years satellite data have been increasingly used for the analysis of floodprone areas. This study was carried out to demonstrate the usefulness of repetitive satellite imagery in monitoring flood levels of the Pyungchang watershed. Runoff characteristics parameters were analyzed by Soil Conservation Service(SCS) Runoff Curve Number(RCN) based on Landsat imagery and Digital Terrain Model data. The RCN average within the watershed was calculated from RCN estimates for all the pixels(picture elements) and adjusted by antecedent precipitation conditions. The direct runoff hydrograph was derived from the unit hydrograph using SCS dimensionless unit hydrograph and effective rainfalls estimated by the SCS method. In comparsion of the direct runoff hydrograph with the measured rating curve their peak times differ by one hour and peak discharges differ by 5.9 percents of the discharge from each other. It was shown that repetitive satellite image could be very useful in timely estimating watershed runoffs and evaluating ever-changing surface conditions of a river basin.

A Comparative Study of Unit Hydrograph Models for Flood Runoff Estimation for the Streamflow Stations in Namgang-Dam Watershed (남강댐유역 내 주요 하천관측지점의 홍수유출량 추정을 위한 단위도 모형 비교연구)

  • Kim, Sung-Min;Kim, Sung-Jae;Kim, Sang-Min
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.54 no.3
    • /
    • pp.65-74
    • /
    • 2012
  • In this study, three different unit hydrograph methods (NRCS, Snyder and Clark) in the HEC-HMS were compared to find better fit with the observed data in the Namgang-Dam watershed. The Sancheong, Shinan, and Changchon in Namgang-Dam watershed were selected as the study watersheds. The input data for HEC-HMS were calculated land use, digital elevation map, stream, and watershed map provided by WAter Management Information System (WAMIS). Sixty six storms from 2004 to 2011 were selected for model calibration and validation. Three unit hydrograph methods were compared with the observed data in terms of simulated runoff volume, and peak runoff for the selected storms. The results showed that the coefficient of determination ($R^2$) for the peak runoff was 0.8295~0.9999 and root mean square error (RMSE) was 0.029~0.086 mm/day for calibration stages. In the model validation, $R^2$ for the peak runoff was 0.9061~0.9916 and RMSE was 0.030~0.088 mm/day which were more accurate than calibrated data. Analysis of variance showed that there was no significant difference among the three unit hydrograph methods.

A Study on the Derivation of the Unit Hydrograph using Multiple Regression Model (다중회귀모형으로 추정된 모수에 의한 최적단위유량도의 유도에 관한 연구)

  • 이종남;김채원;황창현
    • Water for future
    • /
    • v.25 no.1
    • /
    • pp.93-100
    • /
    • 1992
  • A study on the Derivation of the Unit Hydrograph using Multiple Regression Moe이. The purpose of this study is to deriver an optimal unit hydrograph suing the multiple regression model, particularly when only small amount of data is available. The presence of multicollinearity among the input data can cause serious oscillations in the derivation of the unit hydrograph. In this case, the oscillations in the unit hydrograph ordinate are eliminated by combining the data. The data used in this study are based upon the collection and arrangement of rainfall-runoff data(1977-1989) at the Soyang-river Dam site. When the matrix X is the rainfall series, the condition number and the reciprocal of the minimum eigenvalue of XTX are calculated by the Jacobi an method, and are compared with the oscillation in the unit hydrograph. The optimal unit hydrograph is derived by combining the numerous rainfall-runoff data. The conclusions are as follows; 1)The oscillations in the derived unit hydrograph are reduced by combining the data from each flood event. 2) The reciprocals of the minimum eigen\value of XTX, 1/k and the condition number CN are increased when the oscillations are active in the derived unit hydrograph. 3)The parameter estimates are validated by extending the model to the Soyang river Dam site with elimination of the autocorrelation in the disturbances. Finally, this paper illustrates the application of the multiple regression model to drive an optimal unit hydrograph dealing with the multicollinearity and the autocorrelation which cause some problems.

  • PDF

A Comparative Study of Unit Hydrograph Models for Flood Runoff Simulation at a Small Watershed (농업소유역의 홍수유출량 추정을 위한 단위도 모형 비교연구)

  • Seong, Choung-Hyun;Kim, Sang-Min;Park, Seung-Woo
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.50 no.3
    • /
    • pp.17-27
    • /
    • 2008
  • In this study, three different unit hydrograph methods (Snyder, SCS, Clark) in the HEC-HMS were compared to find better fit with the observed data in the small agricultural watershed. Baran watershed, having $3.85km^2$ in size, was selected as a study watershed. The watershed input data for HEC-HMS were retrieved using HEC-GeoHMS which was developed to assist making GIS input data for HEC-HMS. Rainfall and water flow data were monitored since 1996 for the study watershed. Fifty five storms from 1996 to 2003 were selected for model calibration and verification. Three unit hydrograph methods were compared with the observed data in terms of simulated peak runoff, peak time and total direct runoff for the selected storms. The results showed that the coefficient of determination ($R^2$) for the observed peak runoff was $0.8666{\sim}0.8736$ and root mean square error, RMSE, was $5.25{\sim}6.37\;m^3/s$ for calibration stages. In the model verification, $R^2$ for the observed peak runoff was $0.8588{\sim}0.8638$ and RMSE was $9.57{\sim}11.80\;m^3/s$, which were slightly less accurate than the calibrated data. The simulated flood hydrographs were well agreed with the observed data. SCS unit hydrograph method showed best fit, but there was no significant difference among the three unit hydrograph methods.

Development of Runoff Hydrograph Model for the Derivation of Optimal Design Flood of Agricultural Hydraulic Structures(1) (농업수리구조물의 적정설계홍수량 유도를 위한 유출수문곡선모형의 개발(I))

  • 이순혁;박명근;맹승진
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.37 no.3_4
    • /
    • pp.34-47
    • /
    • 1995
  • It is experienced fact as a regular annual event that the structure to he designed on unreasonable flood for the agricultural structures including reservoirs have been brought not only loss of lives, but also enormous property damage. For the solution of this problem at issue, this study was conducted to develop an optimal runoff hydrograph model by comparison of the peak flows and time to peak between observed and simulated flows derived by linear time-invariant and linear time-variant models under the condition of having a short duration of heavy rainfall with uniform rainfall intensity at nine small watersheds which are within the range of 55.9 to 140.7 square kilometers in area in Han, Geum, Nagdong and Yeongsan Rivers. The results obtained through this study can be summarized as follows. 1. Storage constants and Gamma function arguments were calculated within the range of 1.2 to 6.42 and of 1.28 to 8.05 respectively by the moment method as the parameters for the analysis of runoff hydrograph based on linear time-invariant model. 2. Parameters for both linear time-invariant and linear time-variant models were calibrated with nine gaged watershed data, using a trial and error method. The resulting parameters including Gamma function argument, N and storage constant, K for linear time-invariant model were related statistically to watershed characteristic variables such as area, slope, length of main stream and the centroid length of the basin. 3. Average relative errors of the simulated peak discharge of calibrated runoff hydrographs by using linear time-variant and linear time-invariant models were shown to be 0.75 and 5.42 percent respectively to the peak of observed runoff hydrographs. Correlation coefficients for the statistical analysis in the same condition were shown to be 0.999 and 0.978 with a high significance respectively. Therefore, it can be concluded that the accuracy of a linear time-variant model is approaching more closely to the observed runoff hydrograph than that of a linear time-invariant model in the applied watersheds. 4. Average relative errors of the time to peak of calibrated runoff hydrographs by using linear time-variant and linear time-invariant models were shown to be 16.44 and 19.89 percent respectively to the time to peak of observed runoff hydrographs. Correlation coefficients in the same condition were also shown to be 0.999 and 0.886 with a high significance respectively. 5. It can be seen that the shape of simulated hydrograph based on a linear time- variant model is getting closer to the observed runoff hydrograph than that of a linear time-invariant model in the applied watersheds. 6. Two different models were verified with different rainfall-runoff events from data for the calibration by relative error and correlation analysis. Consequently, it can be generally concluded that verification results for the peak discharge and time to peak of simulated runoff hydrographs were in good agreement with those of calibrated runoff hydrographs.

  • PDF

A Study on Hydrologic Analysis and Some Effects of Urbanization on Design Flow of Urban Storm Drainage Systems (1) (도시 하수도망의 수문학적인 평가와 설계확률유량의 점대화 성향에 관한 연구(제1보))

  • 강관원;서병하;윤용남
    • Water for future
    • /
    • v.14 no.4
    • /
    • pp.27-34
    • /
    • 1981
  • The design flow of the urban strom drainage systems has been assessed largely on a basis of empirical relations between rainfall and runoff, and the rational formula has been widely used for the cities in our country. In order to estimate it more accurately, the urban runoff simulation model based on the RRl method has been developed and applied to the sample basin in this study. The rainfall hyetograph of the design stromfor the design flow has been obtained by the determination of the total rainfall and the temporal distributions of that rainfall. The total rainfall has been assessed from the empirical formula of rainfall intensity and the temporal distribution of that rainfall determined on the basis of Huff's method from the historical rainfall data of the basin. The virtual inflow hydrograph to each inlet of the basin has been constructed by computing the series of discharges in each time increment, using design strom hyetograph and time-area diagram. The actual runoff hydrograph at the basin outlet has been computed from the virtual inflow hydrographs by developing a relations between discharge and storage for the watershed. The discharge data for verification of the simulated runoff hydrograph are not available in the sample basin and so the sensitivity analysis of the simulation model has not been possible. The peak discharge for the design of drainage systems has been estimated from the computed runoff hydrograph at the basin outlet and compared to thatl obtained form the rational formula.

  • PDF