• Title/Summary/Keyword: rock-soil

Search Result 1,074, Processing Time 0.027 seconds

Blow-out pressure of tunnels excavated in Hoek-Brown rock masses

  • Alireza Seghateh Mojtahedi;Meysam Imani;Ahmad Fahimifar
    • Geomechanics and Engineering
    • /
    • v.37 no.4
    • /
    • pp.323-339
    • /
    • 2024
  • If the pressure exerted on the face of a tunnel excavated by TBM exceeds a threshold, it leads to failure of the soil or rock masses ahead of the tunnel face, which results in heaving the ground surface. In the current research, the upper bound method of limit analysis was employed to calculate the blow-out pressure of tunnels excavated in rock masses obeying the Hoek-Brown nonlinear criterion. The results of the proposed method were compared with three-dimensional finite element models, as well as the available methods in the literature. The results show that when σci, mi, and GSI increase, the blow-out pressure increases as well. By doubling the tunnel diameter, the blow-out pressure reduces up to 54.6%. Also, by doubling the height of the tunnel cover and the surcharge pressure exerted on the ground surface above the tunnel, the blow-out pressure increased up to 74.9% and 5.4%, respectively. With 35% increase in the unit weight of the rock mass surrounding the tunnel, the blow-out pressure increases in the range of 14.8% to 19.6%. The results of the present study were provided in simple design graphs that can easily be used in practical applications in order to obtain the blow-out pressure.

Evaluation and Prediction of Failure Hazard Area by the Characteristics of Forest Watershed (산림유역 특성에 의한 붕괴 위험지역의 평가 및 예지)

  • Jeong, Won-Ok;Ma, Ho-Seop
    • Korean Journal of Environment and Ecology
    • /
    • v.20 no.4
    • /
    • pp.415-424
    • /
    • 2006
  • This study was carried out to analyze the characteristics of forest watershed factors by using the quantification theory(I) for evaluation and prediction of the failure hazard area. Present $sediment(m^3/yr/ha)$ of erosion control dams were investigated in 95 sites of erosion control dam constructed during 1986 to 1999 in Gyeongnam province. The results obtained from this study were summarized as follows; General condition of class I(Very hazard area) were as follow; Igneous rock in parent rock, coniferous in forest type, below 20year in stand age, below 30cm in soil depth, SCL in soil texture, $31{\sim}40%$ in gravel contents, $S{\sim}E$ in aspect, $2,501{\sim}3,600m$ in length of main stream, $26{\sim}30$ in number of total streams, $6,601{\sim}10,000m$ in length of total streams, over 3 in stream order, over 16 in number of first streams order and over $31^{\circ}$ of slope gradient. General condition of class IIl(hazard area) were as follow; Metamorphic rock in parent rock, hardwood in forest type, over $21{\sim}24year$ in stand age, $31{\sim}40cm$ in soil depth, SiCL or SCL in soil texture, $11{\sim}20%$ in gravel contents, $S{\sim}W$ in aspect, $1,501{\sim}2,600m$ in length of main stream, $6{\sim}10$ in number of total streams, $3,501{\sim}5,500m$ in length of total streams, 2 in stream order, $6{\sim}10$ in number of first streams order and over $31^{\circ}$ of slope gradient. General condition of class III(Un hazard area) were as follow; Sedimentary rock in parent rock, mixed in forest type, over 25year in stand age, $41{\sim}50cm$ in soil depth, SiCL in soil texture, below 10% in gravel contents, $N{\sim}W$ in aspect, below 500m in length of main stream, below 5 in number of total streams, below 1,000m in length of total treams, below 1 in stream order, below 2 in number of first streams order and below $25^{\circ}$ of slope gradient. The prediction method of suitable for failure hazard area divided into class I, II, and III for the convenience of use. The score of class I evaluated as a very hazard area was over 4.8052. A score of class II was 4.8051 to 2.5602, it was evaluated as a hazard area, and class III was below 2.5601, it was evaluated as a un hazard area.

Treatment Characteristics of Soil Clothing Contact Oxidation Process using Bio-media (생물담체를 충진한 토양피복 산화접촉공정의 하수처리특성)

  • Kim, Hong-Jae;Kang, Jae-Hee;Lee, Ki-Seok;Motoki, Kubo;Kang, Chang-Min;Chung, Seon-Yong
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.27 no.4
    • /
    • pp.414-419
    • /
    • 2005
  • This study was performed to compare the treatment efficiencies of two media, newly developed Bio-rock and conventional gravel, in soil clothing contact oxidation process. The composition of synthetic wastewater were $COD_{Cr}$ $150{\sim}370\;mg/L$, $BOD_5$ $150{\sim}270\;mg/L$, T-N $20{\sim}60\;mg/L$, T-P $5{\sim}25\;mg/L$, pH 7 and 2 mL/L of trace element solution. The experiment using two reactors was comparatively conducted for the flow rate of 40 L/d for 13 months, respectively. Initially Bio-rock reactor was increased to pH 12 due to $Ca(OH)_2$ with hydration of cement, but gravel reactor was dropped to pH 4 due to the degradation of organic material and nitrification. This significant pH variation deteriorated the growth and activity of microorganism. But the high pH of Bio-rock seems favorite to ammonia stripping and precipitation of phosphate. Such pH variation of Bio-rock and gravel reactors were finally stabilized to pH 8 and pH 6, respectively. The removal efficiencies of organic compounds from Bio-rock reactor were 96% of $COD_{Cr}$, 98% of $BOD_5$, 80% of T-N and 85% of T-P which stably coping against variation of influent concentration. But those of gravel reactor were 96% of $COD_{Cr}$, 96% of $BOD_5$, 42% of T-N and 40% of T-P, respectively. The Bio-rock was 2 times higher than T-N and T-P in treatment efficiency. And electron-microscopic examination showed that Bio-rock was more favorable to microbial adherence than gravel. The microbial populations were $5.2{\times}10^6\;CFU/mL$ of Bio-rock reactor compared to $2.6{\times}10^6\;CFU/mL$ in gravel reactor. In result Bio-rock was favor to microbial adherence and high treatment efficiency in spite of variation of influent concentration which had the advantages in saving running time and reducing site requirement.

Study(II) on Development of Charts and Formulae Predicting Allowable Axial Bearing Capacity for Prebored PHC Pile Socketed into Weathered Rock through Sandy Soil Layer - Improvement Measures of Current Design Method by Analyzing Current Design Data for Prebored PHC Piles - (사질토층을 지나 풍화암에 소켓된 매입 PHC말뚝에서 지반의 허용압축지지력 산정도표 및 산정공식 개발에 관한 연구(II) - 설계 사례 분석을 통한 매입 PHC말뚝의 설계 개선 방향 -)

  • Yea, Geu Guwen;Yun, Dae Hee;Yun, Do Kyun;Choi, Yongkyu
    • Journal of the Korean Geotechnical Society
    • /
    • v.35 no.8
    • /
    • pp.31-42
    • /
    • 2019
  • A total of 73 pile design data for prebored PHC piles was analyzed to study the current design method. Based on the design data, a ratio of skin friction to total capacity from the pile design data was about 20~53%. Such low ratio of skin friction to total capacity tends to underestimate skin friction. Considering this tendency, the current design method should be improved. Also, an average design efficiency of PHC pile capacity was 70% and an average design efficiency for bearing capacity of soil or weathered rock was 80%, which shows slightly higher value than the former. This is probably due to the fact that the allowable bearing capacity is estimated to be equal to or slightly higher than the design load. Hence, the allowable bearing capacity should be estimated to be higher than the long-term allowable compressive force of the PHC pile. In the current design method, skin friction is calculated to be about 2.2 times lower than end bearing. The current design method for prebored PHC piles applied foreign design methods without any verification of applicability to the domestic soil or rock condition. Therefore, the current design method for prebored PHC piles should be improved.

Studies on Short Term Hardening Method of Tree Seedlings for Afforestation of Cut-Rock Slope (암반절개사면 녹화용 강건묘목의 속성육묘법에 관한 연구)

  • Hong, Sung-Gak;Kim, Jong-Jin
    • Korean Journal of Environmental Agriculture
    • /
    • v.17 no.4
    • /
    • pp.358-361
    • /
    • 1998
  • This study was carried out to develop a short term hardening method of tree seedlings of Rhus chinensis Mill., Evodia daniellii Hemsley and Parthenocissus tricuspidata(Sieb. et Zucc.) Planck for afforestation on a concave and a crack of cut-rock slope. The seedlings were grown in a cylinder shaped pot made of polyvinyl net with the soil media of peatmoss, vermiculite, clay, compost, fertilizer, and absorbant(40:25:19:15:1:0.1, v:v). They were cultivated in a greenhouse for four months and in field condition for two months. During the last three months of the growing period the seedlings were hardened by periodic desiccation and irrigation in 4 to 10 days interval. The hardened seedlings showed lower leaf water potential, higher leaf osmotic pressure, and lower T/R ratio than those before the hardening. The hardened seedlings survived well on the soil medium in the concave of cut-rock slope.

  • PDF

Determination of the coefficient of variation of parameters for the reliability design of shield tunnel segment lining (쉴드 터널 세그먼트 라이닝의 신뢰성 설계를 위한 변수의 변동계수 결정)

  • Byun, Yoseph;Kim, Do;Lee, Seongwon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.6
    • /
    • pp.875-885
    • /
    • 2019
  • This paper is aimed to suggest the coefficient of variation of the total load on the segment lining and the coefficient of variation of earth pressure in reliability based design of shield tunnel. For this purpose, the statistical characteristics of weathered soil and weathered rock were calculated by analyzing the site survey data of the domestic urban section. The coefficient of variation could be estimated by applying these values to Terzaghi's theory using MCS technique. As a result, the coefficient of variation of rock load for weathered soil and weathered rock was 0.08~0.14. The coefficient of variation for the total load acting on the tunnel was LC1 = 0.38, LC2 = 0.33, and LC3 = 0.37. The proposed coefficients of variation can be used in the reliability-based design of shield tunnel segments.

Development and Its Application of a Discrete Fracture Flow Model for the Analysis of Gas-Water Transient Flow in Fractured Rock Masses Around Storage Cavern (지하저장공동 주변 불연속 암반에서의 가스-물 천이유동해석을 위한 개별균열 유동모델의 개발 및 응용)

  • 나승훈;성원모
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.11a
    • /
    • pp.705-712
    • /
    • 2000
  • The fluid generally flows through fractures in crystalline rocks where most of underground storage facilities are constructed because of their low hydraulic conductivities. The fractured rock is better to be conceptualized with a discrete fracture concept, rather continuum approach. In the aspect of fluid flow in underground, the simultaneous flow of groundwater and gas should be considered in the cases of generation and leakage of gas in nuclear waste disposal facilities, air sparging process and soil vapor extraction for eliminating contaminants in soil or rock pore, and pneumatic fracturing for the improvement of permeability of rock mass. For the purpose of appropriate analysis of groundwater-gas flow, this study presents an unsteady-state multi-phase FEM fracture network simulator. Numerical simulation has been also conducted to investigate the hydraulic head distribution and air tightness around Ulsan LPG storage cavern. The recorded hydraulic head at the observation well Y was -5 to -10 m. From the results obtained by the developed model, it shows that the discrete fracture model yielded hydraulic head of -10 m, whereas great discrepancy with the field data was observed in the case of equivalent continuum modeling. The air tightness of individual fractures around cavern was examined according to two different operating pressures and as a result, only several numbers of fractures neighboring the cavern did not satisfy the criteria of air tightness at 882 kPa of cavern pressure. In the meantime, when operating pressure is 710.5 kPa, the most areas did not satisfy air tightness criteria. Finally, in the case of gas leaking from cavern to the surrounding rocks, the resulted hydraulic head and flowing pattern was changed and, therefore, gas was leaked out from the cavern ceiling and groundwater was flowed into the cavern through the walls.

  • PDF

Solubilization of Insoluble Phosphates by Aspergillus sp. PS-104 Isolated from Soil (토양에서 분리한 Aspergillus sp. PS-104 균주에 의한 난용성 인산염 분해)

  • Kang, Sun-Chul;Shin, Seung-Yong
    • Korean Journal of Environmental Agriculture
    • /
    • v.26 no.1
    • /
    • pp.36-41
    • /
    • 2007
  • Phosphate-solubilizing microorganisms were isolated from soil around Kyungnam and Kyungbook regions using potato dextrose agar-calcium phosphate medium. A fungus with the greatest phosphate-solubilizing activity was selected and identified to Aspergillus sp. PS-104, based on the morphological characteristics of conidiophore and conidia; unbranching type of conidiophore, terminally swelling of conidiophore and septate of mycelium, in malt extract agar and potato dextrose agar media. The optimum temperature and initial pH to solubilize rock phosphate in potato dextrose broth-rock phosphate medium were $30^{\circ}C$ and pH 7.0, respectively. In these optimum conditions, phosphate-solubilizing activities of Aspergillus sp. PS-104 against four twos of insoluble phosphate, tricalcium phosphate, aluminium phosphate, hydroxyapatite and rock phosphate, were quantitatively determined. As result, the maximum phosphate-solubilizing activity was obtained with tricalcium-phosphate (1,900 ppm) while minimum activity was obtained with hydroxyapatite (320 ppm). Futhermore, phosphate-solubilizing activity of Aspergillus sp. PS-104 was found higher when treated with nitrates as compared to the ammonium salts as a nitrogen sources.

Relations between Initial Displacement Rate and Final Displacement of Arch Settlement and Convergence of a Shallow Tunnel (저심도 터널의 천단침하 및 내공변위의 초기변위속도와 최종변위의 관계)

  • Kim, Cheehwan
    • Tunnel and Underground Space
    • /
    • v.23 no.2
    • /
    • pp.110-119
    • /
    • 2013
  • It is generalized to measure the arch settlement and convergence during tunnel construction for monitoring its mechanical stability. The initial convergence rate a day is defined from the first convergence measurement and the final convergence defined as the convergence measured lastly. The initial and the final tunnel arch settlement are defined like the preceding convergence. In the study, the relations between the initial and final displacements of a shallow tunnel are analyzed. The measurements were performed in the tunnel of subway 906 construction site in Seoul. The overburden is 10-20 m and the tunnel goes through weathered soil/rock. The width and height of the tunnel are about 11.5 m, 10m, respectively. So this is a shallow tunnel in weak rock. The length of tunnel is about 1,820 m and the tunnel was constructed in 2 stages, dividing upper and lower half. The numbers of measurement locations of arch settlement and convergence are 184 and 258, respectively. As a result, the initial displacement rate and the final displacement are comparatively larger in the section of weathered soil.

The Response of a Single Pile and Pile Groups to Tunnelling Performed in Weathered Rock (풍화암에서 실시된 터널굴착으로 인한 단독말뚝 및 군말뚝의 거동)

  • Lee, Cheol Ju
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.5C
    • /
    • pp.199-210
    • /
    • 2012
  • The effects of tunnelling in weak weathered rock on the behaviour of a pre-existing single pile and pile groups ($3{\times}3$ and $5{\times}5$ pile groups) above a tunnel have been studied by carrying out three-dimensional (3D) elasto-plastic numerical analyses. Numerical modelling of such effects considers the response of the single pile and pile groups in terms of tunnelling-induced ground and pile settlement as well as changes of the shear transfer mechanism at the pile-soil interface due to tunnelling. Due to changes in the relative shear displacement between the pile and the soil at the pile-soil interface with tunnel advancement, the shear stresses and axial pile force distributions along the pile change drastically. Based on the computed results, upward shear stresses are induced up to about Z/L=0.775 from the pile top, while downward shear stresses are mobilised below Z/L=0.775, resulting in a reduction in the axial pile force distribution with depth equivalent to a net increase in the tensile force on the pile. A maximum tensile force of about $0.36P_a$ developed on the single pile solely due to tunnelling, where $P_a$ is the service axial pile loading prior to tunnelling. The degree of interface shear strength mobilisation at the pile-soil interface was found to be a key factor governing pile-soil-tunnelling interaction. Overall it has been found that the larger the number of piles, the greater is the effect of tunnelling on the piles in terms of pile settlement, while changes of the axial pile forces for the piles in the groups are smaller than for a single pile due to the shielding effect. The reduction of apparent allowable pile capacity due to tunnelling-induced pile head settlement was significant, in particular for piles inside the groups.