• Title/Summary/Keyword: roadbed

Search Result 234, Processing Time 0.019 seconds

A Study on the Determination of Indicators for the Risk Assessment of Ground Depression Using SAR Imageson (SAR 영상을 활용한 지반침하의 위험평가를 위한 지표결정에 대한 연구)

  • Lee, Hyojin;Yoon, Hongsic;Han, Hak
    • Journal of the Korean GEO-environmental Society
    • /
    • v.22 no.7
    • /
    • pp.13-20
    • /
    • 2021
  • The problem of subsidence of the roadbed near the Honam High Speed Railway, which opened in April 2015, continues to be raised, and the ground stability of the area near the Honam High Speed Railway may also be problematic. It is very important to select the factors that determine the indicators and indicators in producing the risk maps. Existing risk indicators are calculated as the final displacement volume based on the last observed date of the observed period, and time-series indicator displacement must be identified to analyze the cause of subsidence and the behavior of the indicator. Furthermore, for a wide range of regions, it is economically inefficient to conduct direct level measurements, so we wanted to observe surface displacement using SAR images. In this paper, time series indicator displacement was observed using PS-InSAR techniques, and risk was compared by rating each factor using the difference between final indicator displacement, cumulative indicator displacement, minimum displacement and maximum displacement as factors for determining risk indicators. As a result, the risk rating of the final displacement is different from that of each factor, and we propose adding factors from different perspectives in determining risk indicators. It is expected to be an important study in finding the cause of ground subsidence and finding solutions.

Analysis of the Finishing Failure in the Railway Station Platform and Deduction of Improvement Plans (철도역사 승강장 연단부 마감 탈락에 대한 원인 분석 및 개선 방안)

  • Ko, Sewon;Yu, Youngsu;Koo, Bonsang;Kim, Jihwan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.1
    • /
    • pp.46-53
    • /
    • 2022
  • The railway platform is an important facility closely related to the safety of passengers, trains, and images of railway facilities, and requires thorough facility management. However, the problem that the finishing material (plastering mortar) for the joint finishing of dissimilar materials (concrete+granite) falls off in the direction of the track at the platform podium is occurring multiple times across the country. Since these problems threaten the safety of train operation and the safety of passengers, immediate and continuous management is required. This study tried to derive improvement plans through the analysis of the drop-off problem of finishing materials occurring at the platform podium. The status of missing finishing materials for the platform podiums of about 200 railway stations and the related design and construction standards of the Korea National Railway were investigated. After that, the cause of the drop-off of the finishing material was analyzed, and as a result, it was found that the main cause was the boundary between the roadbed and the architectural process that occurred during construction. Subsequently, in connection with the derived causes and design, construction standards, (1) improvement of finishing materials or construction methods, (2) design of finishing materials that are easy to adjust height, (3) design of separate finishing methods, (4) improvement methods and durability were suggested.

Flora of Oesorak in Soraksan National Park (설악산 국립공원 외설악의 관속식물상)

  • Kim, Yong-Shik;Kang, Ki-Ho;Bae, Jun-Kyu;Shin, Hyun-Tak
    • Korean Journal of Environment and Ecology
    • /
    • v.10 no.2
    • /
    • pp.211-239
    • /
    • 1997
  • The flora of Oesorak in the Soraksan National Park including Chombongsan(Mountain) and Kwanmobong(Peak) were surveyed from February to August, 1996. These areas have very rich and diverse flora;620 taxa with 89 families, 321 genera, 526 species, 2 subspecies, 89 varieties and 3 forms in the Oesorak, 404 taxa with 251 genera, 350 species, 1 subspecies, 51 varieties and 2 forms in the Chombongsan(Mountain), 286 taxa with 206 genera, 233 species, 1 subspecies, 50 varieties and 2 forms in Kwanmobong(peak). The Oesorak had very distinct floristic characteristics such as the wild habitats of Asarum maculatum(Aristolochiaceae) and Ilex macropoda(Aquifoliaceae). In the phyorgeographical point of view, the six species such as Sapium japonicum (Euphorbiaceae), Euphorbia joldini(Euphorbiaceae), Ilex macropoda (Aquifoliaceae), Styrax japonica (Styracaceae), Carex sideros ticta (Cyperaceae) and Asarum maculatum (Aristolochiaceae) were naturalized into this region, while the 17 taxa such as Abies neprolepis(Pinaceae), Pinus pumila(Pinaceae), Thuja koraiensis(Cupressaceae), Allium senescens(Liliaceae), Lilium distichum(Liliaceae), Saxifraga punctata(Saxfragaceae), Rosa marretii(Rosaceae), Bupleurum euphorbioides(Umbelliferae), Androsace cortusaefolia (Primulaceae), Peducularis mandshurica(Scrophulariaceae) and Leontopodium coreanum (Compositae) were distrivuted to this region. The colonizing weedy species such as Ixris repens (Compositae) were distributed to this region. The colonizing weedy species losa(Labiatae) and Rosa rugosa(Rosaceae) were naturalized into ca. 900m at sea level mainly due to the sand soil from the seashore. Mountain roadbed is susceptible than other areas to the slippery road problems, due largely to snow and rain, particularly during winter. Sand soils from seashore are utilized to minimize this slip in traffic operation.

  • PDF

Effects of parallel undercrossing shield tunnels on river embankment: Field monitoring and numerical analysis

  • Li'ang Chen;Lingwei Lu;Zhiyang Tang;Shixuan Yi;Qingkai Wang;Zhibo Chen
    • Geomechanics and Engineering
    • /
    • v.35 no.1
    • /
    • pp.29-39
    • /
    • 2023
  • As the intensity of urban underground space development increases, more and more tunnels are planned and constructed, and sometimes it is inevitable to encounter situations where tunnels have to underpass the river embankments. Most previous studies involved tunnels passing river embankments perpendicularly or with large intersection angle. In this study, a project case where two EPB shield tunnels with 8.82 m diameter run parallelly underneath a river embankment was reported. The parallel length is 380 m and tunnel were mainly buried in the moderate / slightly weathered clastic rock layer. The field monitoring result was presented and discussed. Three-dimensional back-analysis were then carried out to gain a better understanding the interaction mechanisms between shield tunnel and embankment and further to predict the ultimate settlement of embankment due to twin-tunnel excavation. Parametrical studies considering effect of tunnel face pressure, tail grouting pressure and volume loss were also conducted. The measured embankment settlement after the single tunnel excavation was 4.53 mm ~ 7.43 mm. Neither new crack on the pavement or cavity under the roadbed was observed. It is found that the more degree of weathering of the rock around the tunnel, the greater the embankment settlement and wider the settlement trough. Besides, the latter tunnel excavation might cause larger deformation than the former tunnel excavation if the mobilized plastic zone overlapped. With given geometry and stratigraphic condition in this study, the safety or serviceability of the river embankment would hardly be affected since the ultimate settlement of the embankment after the twin-tunnel excavation is within the allowable limit. Reasonable tunnel face pressure and tail grouting pressure can to some extent suppress the settlement of the embankment. The recommended tunnel face pressure and tail grouting pressure are 300 kPa and 550 kPa in this study, respectively. However, the volume loss plays the crucial role in the tunnel-embankment interaction. Controlling and compensating the tunneling induced volume loss is the most effective measure for river embankment protection. Additionally, reinforcing the embankment with cement mixing pile in advance is an alternative option in case the predicted settlement exceeds allowable limit.