• Title/Summary/Keyword: road surface drainage facility

Search Result 4, Processing Time 0.021 seconds

Road Drainage Facility Design Methods apply on the Hydraulic and Hydrologic Analysis (수리·수문기술을 적용한 도로 배수시설 설계 기법)

  • Lee, Man-Seok
    • Journal of Korea Water Resources Association
    • /
    • v.45 no.4
    • /
    • pp.419-430
    • /
    • 2012
  • Due to the calculation difficulty on the hydraulic and hydrologic analysis for road drainage facilities design, these analysis techniques are not applicable. This study's result are development of minutely rainfall-intensity equation suitable for road drainage area, verification of rainfall-runoff model joining kinematic wave theory for road drainage area, computational model based GUI for road surface drainage facilities spacing and culvert's size decision and various road drainage channel design. Applicable test on the developed model is proceed, result that in case of road surface dranage facilities spacing is narrower 6~65% than present spacing calculation method, in other case of road cross dranage facilities size is bigger 6~140% than present size decision method.

A study of Improvement on the Road Drainage Poor Site (도로배수 취약구간의 개선방안에 대한 연구)

  • Lee, Man-Seok;Kim, Heung-Rae;Lee, Kyung-Ha;Kang, Min-Soo;Song, Min-Tae
    • International Journal of Highway Engineering
    • /
    • v.13 no.2
    • /
    • pp.125-131
    • /
    • 2011
  • This research aims to investigate the cause of the occurrence of a weak road drainage section scientifically and specifically through a site survey for a poorly drained section occurring due to rainfalls during road operation. This paper deeply reviewed the existing research results and current situation data on the poorly drained sections accumulated in Korea Expressway Corporation in order to investigate the cause of the occurrence of a weak road drainage section, and deeply verified and analyzed the weak sections for the road surface drainage facilities and the other road drainage facilities by visiting the expressway controlled by the 6 local headquarters and 33 branches of Korea Expressway Corporation. As a result of site surveys for the weak road drainage sections, i) in a road surface section, occurrence of ponding in the road shoulder pavement due to slope changes, bad collection of water in the collecting well at a median strip, shortage of road shoulder dike height, and inferior construction, etc. was analyzed to be the main cause of the occurrence of poorly drained sections, and ii) in a road neighborhood section, the occurrence of pavement height difference in a main road and shoulder section due to inferior ditches on a slope and the bad drain age at the inlet and outlet of a culvert due to soil deposits, debris, etc. were analyzed to be the main cause of the occurrence of weak sections. Proposed as a plan to improve the poorly drainage section of road were i)calculation of capacity through material changes at the ditch, enhancement of vertical sections and hydraulic analysis in terms of construction and other aspects, ii)derivation of a combined slope considering a slope and a vertical linearity and maintenance of proper distance between drainage structures in a vertical concave section in terms of geometrical structure, and iii)calculation of the drainage facility installation interval using a minutely rainfall intensity formula and a non-uniform flow analysis technique in terms of hydraulics and hydrologics and prompt removal of rainfalls from the road surface according to a linear drainage method.

Effect of forest road establishment based on forest management on occurrence of suspended sediment (산림경영기반의 임도개설이 부유사 발생에 미치는 영향)

  • 이성기
    • Journal of Environmental Science International
    • /
    • v.12 no.3
    • /
    • pp.247-255
    • /
    • 2003
  • Forest management starts from forest road facility, which is designated as generation source of muddy water in mountain stream during initial stage of establishment. Therefore, this study reviewed the effect of suspended sediment generated in forest road surface on the muddy water in mountain stream with respect to marsh area of forest. As a result, characteristics of outflow of suspended sediment was understood, and it was judged that generation of suspended sediment due to establishment of forest road is diluted by mountain stream this charged from drainage area so as to have small effect on muddy water in total mountain stream.

Intercepted flow equation at grate inlet on road (도로 빗물받이 유입구의 차집유량 산정식)

  • Kim, Jung Soo;Kwak, Sang Ho;Ryu, Taek Hee;Yoon, Sei Eui
    • Journal of Korea Water Resources Association
    • /
    • v.49 no.6
    • /
    • pp.537-549
    • /
    • 2016
  • The grate inlets generally were installed to intercept surface runoff on the roads and intercepted flow was drained to the underground sewer system. The equation of interception flow was used to determine the size and spacing of grate inlet on the roads. Therefore, it is necessary to analyze the interception capacity of grate inlet. Hydraulic experimental apparatus which can be changed with the longitudinal slopes(2, 4, 6, 8, 10%) of street, the transverse slopes(2, 4, 7, 10%), and the lengths(50, 100, 150cm) of grate inlet was installed for this study. The range of the experimental discharges were calculated with change of road lanes(2, 3, 4) and design frequencies(5, 10, 20, 30year). As the transverse slope increased, it led to the increase of interception capacity at grate inlets. The long lengths of grate inlet with direction of flow increased the interception capacity by the increase of side inflow. On the basis of the hydraulic model experiment results, the empirical equations for calculation of the interception capacity were derived with regression analysis. As a result of comparison with equations, the suggested equation of this study was estimated reasonable one for increased design frequency. Therefore, this study can suggest the basic data for design of drainage facility at road.