• Title/Summary/Keyword: road section

Search Result 638, Processing Time 0.026 seconds

A Study on the Traffic Effect Zone and Application of Road Occupying Construction (도로 공사중의 교통영향권역 설정 및 적용성에 관한 연구)

  • Lee, Ju-Ho;Lee, Young-Woo;Lim, Chae-Moon
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.6 no.2
    • /
    • pp.131-139
    • /
    • 2003
  • The links operating interrupted flow are intend to yield the traffic between the out flow and inflow part effect zone of street section, we build the delay model using the time gap between under construction and not. We review the applicability of interrupted flow, and thus we can put this data to practical use as the basis data to compute the inducement charge for traffic delay. Also building about traffic effect zone of interrupted flow wouldn't produce at the section beside occupying roads and construction cross section, thus we must review the plan to minimize traffic delay by the construction occupying road. In future there must be advanced the incomplete in this study, and groping for the various alternatives to minimize the traffic delay by the road occupying construction, with developing the various sets of detailed analyzing models, that is analysis on the street strength, crossroads geometrical forms of crossroads, public traffics, pedestrians, occupying types.

  • PDF

Stability evaluation of a double-deck tunnel with diverging section

  • La, You-Sung;Kim, Bumjoo
    • Geomechanics and Engineering
    • /
    • v.21 no.2
    • /
    • pp.123-132
    • /
    • 2020
  • Due to the various restrictions and problems related to the construction of new roads in urban areas, underground road construction has been receiving a great deal of attention in the field of tunnel engineering. In this study, a double-deck road tunnel with a diverging section was analyzed for the evaluation of its stability. Both numerical analysis and scale model tests were performed, the results were used to develop a stability evaluation method for double-deck tunnels with diverging sections constructed in rocks by NATM. From regression analyses conducted on the results of the numerical analysis, an equation and a chart were derived, these tools allow us to obtain the strength/stress ratio (SSR) for double-deck road tunnels with a diverging tunnel in various diverging conditions quickly and accurately. These tools have great potential to help engineers evaluate the stability of double-deck tunnels in the preliminary design stage.

Three-dimensional analysis of flexible pavement in Nepal under moving vehicular load

  • Ban, Bijay;Shrestha, Jagat K.;Pradhananga, Rojee;Shrestha, Kshitij C.
    • Advances in Computational Design
    • /
    • v.7 no.4
    • /
    • pp.371-393
    • /
    • 2022
  • This paper presents a three-dimensional flexible pavement simulated in ANSYS subjected to moving vehicular load on the surface of the pavement typical for the road section in Nepal. The adopted finite element (FE) model of pavement is validated with the classical theoretical formulations for half-space pavement. The validated model is further utilized to understand the damping and dynamic response of the pavement. Transient analysis of the developed FE model is done to understand the time varying response of the pavement under a moving vehicle. The material properties of pavement considered in the analysis is taken from typical road section used in Nepal. The response quantities of pavement with nonlinear viscoelastic asphalt layer are found significantly higher compared to the elastic pavement counterpart. The structural responses of the pavement decrease with increase in the vehicle speed due to less contact time between the tires of the vehicle and the road pavement.

A Study on the Extraction of Horizontal Alignment and Cross-Section of Roads using Mobile Laser Scanning Data (모바일 레이저 스캐닝 데이터를 이용한 도로선형 및 횡단면 추출에 관한 연구)

  • Kim, Se-Geun;Lee, Hyun-Yong;Joo, Young-Eun
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.9 no.3
    • /
    • pp.207-218
    • /
    • 2006
  • The extraction of horizontal alignment and cross-section of roads is very important task in road safety diagnosis. Existing road safety diagnosis methods by investigators need much time and expense but don't provide various data. Therefor, we need road shape classification automatically and extraction method of horizontal alignment and cross-section of roads through digital photogrammetry system using GPS-VAN with laser scanner. In this paper, we propose a method of mobile laser scanning data acquisition, processing and developing extraction methods of horizontal alignment and cross-section of roads using mobile laser scanning data by GPS-VAN.

  • PDF

Comparing the Effectiveness of Road Safety Features by Spatial Scope of Safety Improvement Project (도로안전개선사업의 공간적 범위에 따른 도로안전시설물의 효과도 비교)

  • Park, Gyu-Yeong;Kim, Tae-Hui;Kim, Seong-Uk;Lee, Su-Beom
    • Journal of Korean Society of Transportation
    • /
    • v.24 no.4 s.90
    • /
    • pp.31-42
    • /
    • 2006
  • The purpose of this study is to compare the effectiveness of road safety features by spatial scope Spot & Section-based safety Improvement project. Empirical data was collected from black-spot study of Jeonbuk and "Traffic Safety Improvement Project on National Highway 17". Evaluation model of effectiveness was developed by using Empirical Bayes (EB) method. And Relative Effectiveness was measured by Odds Ratio. The result indicates that Section-based safety improvement was $7.09{\sim}77.27%$ more effective than the spot-based. It means that section-based improvement projects should be expanded while considering the characteristics of the section in spot based improvement.

The Analysis of User Cost according to Timing of National Highway Pavement Maintenance-Focusing on the Maesang Bidge Section in Korea

  • Kim, Yunsik;Lee, Minjae
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.606-607
    • /
    • 2015
  • The traffic volume on the road shows various trends reflecting regional characteristics for monthly and hourly, and economic loss affecting users varies according to the selected period for the maintenance of road pavements. Therefore, in this study, the user cost (or delay cost) for monthly and hourly on the work zone near the Maesang Bridge Section on Poseung-Gu, Pyeongtaek-si, Gyeonggi-do was calculated using the time series models and VISSIM, and based on the result, the effect of user cost reduction according to the selection of best maintenance period was examined. The analysis result showed that the month of the lowest user cost occurred due to the maintenance of target section was January (10,293,258 KRW/Day×1km) and the month of the greatest user cost occurred was November (13,337,495 KRW/Day×1km).

  • PDF

A Study for Comparing Road Noise by Surface Types using NCPX (NCPX를 이용한 도로 표층 유형별 노면 소음 비교 연구)

  • Kang, Won Pyoung;Moon, Hak Ryong
    • International Journal of Highway Engineering
    • /
    • v.15 no.6
    • /
    • pp.61-68
    • /
    • 2013
  • PURPOSES : The purpose of this study is to study the noise reducing effect of Micro Surfacing by comparing general asphalt, longitudinal tining and Slurry Seal. METHODS : This study measures vehicles' noise of each section by the NCPX method that can measure noise between the road surface and the tire at the field. Total sound pressure and sound pressure level by the 1/3 octave band frequency are calculated through the field data of each section. Total sound pressure level is compared by ANOVA test statistically. After ANOVA test, post-hoc test is conducted to know mean difference of surface type by Tukey. RESULTS : As the result of CPB analysis to confirm sound pressure levels by frequency, it was shown that sound pressure levels by frequency are totally similar except for those of frequency bands between 100Hz and 500Hz. The result of ANOVA test and post-hoc test, it was shown that sections of surface type have a difference. The result of Micro Surfacing was lower 2~5dB(A) than other surface type. CONCLUSIONS : It is found that the noise reduction performance of Micro Surfacing was better than other surface type.

Accuracy Analysis of Road Surveying and Construction Inspection of Underpass Section using Mobile Mapping System

  • Park, Joon Kyu;Um, Dae Yong
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.39 no.2
    • /
    • pp.103-111
    • /
    • 2021
  • MMS (Mobile Mapping System) is being used for HD (High Definition) map construction because it enables fast and accurate data construction, and it is receiving a lot of attention. However, research on the use of MMS in the construction field is insufficient. In this study, road surveying and inspection of construction structures were performed using MMS. Through data acquisition and processing using MMS, point cloud data for the study site was created, and the accuracy was evaluated by comparing with traditional surveying methods. The accuracy analysis results showed a maximum of 0.096m, 0.091m, and 0.093m in the X, Y, and H directions, respectively. Each RMSE was 0.012m, 0.015m, and 0.006m. These result satisfy the accuracy of topographic surveying in the general survey work regulation, indicating that construction surveying using MMS is possible. In addition, a 3D model was created using the design data for the underpass road, and the inspection was performed by comparing it with the MMS data. Through inspection results, deviations in construction can be visually confirmed for the entire underground roadway. The traditional method takes 6 hours for the 4.5km section of the target area, but MMS can significantly shorten the data acquisition time to 0.5 hours. Accurate 3D data is essential data as basic data for future smart construction. With MMS, you can increase the efficiency of construction sites with fast data collection and accuracy.

Analysis of Installation Effect of Section Speed Enforcement System Using ITS Collection and Operation Data (ITS 수집 및 운영 자료를 활용한 구간과속단속시스템 설치효과 분석)

  • Yoon, Young-Min
    • The Journal of the Korea Contents Association
    • /
    • v.21 no.12
    • /
    • pp.302-309
    • /
    • 2021
  • The section speed enforcement system measures the starting instantaneous speed, the The section speed enforcement system measures the starting instantaneous speed, the ending instantaneous speed, and the section average speed, and imposes fines only for the portion that has been speeding the most. However, according to the Road Traffic Act, most of the systems are installed on highways, so existing research has been conducted on highway sections. In this study, it is expected that the installation of section speed enforcement systems on general national roads will be expanded according to the revision of related laws. ITS collection and operation data targeting the section speed enforcement system installed on National Road 3 Seongnam Icheon-ro was used to analyze traffic speed, standard deviation of traffic speed, and reduction in traffic accidents by dividing it into before installation, trial operation period, and after crackdown. As a result of the analysis, the traffic speed, standard deviation, and traffic accidents decreased by 13%, 25%, and 70%, respectively, after installation, confirming that the installation of the section speed enforcement system greatly contributed to the reduction of accidents.