Korean Journal of Construction Engineering and Management
/
v.8
no.1
s.35
/
pp.124-131
/
2007
Project management means usually managing the rate of construction progress. But it also contains preparing scheme of execution and establishing plan for equipment, material, labor force to finish project within expected duration. In this paper to establish effective project planning a road pavement operation is selected as a case and simulation method is used for analyzing it. Next probability distributions are created after analyzing collected data and these are reflected in simulation model. Simulated result is compared with real project planning using models of lean concrete pavement process and concrete slab pavement process to verify efficiency of this model. In the event we know that project planning using simulation is more effective than one of the field in the aspects of duration and cost. Meanwhile simulated result in this paper has a limitation in accuracy because various constraints of filed are not reflected in it. However if we reflect this constraints in model through examining field in future this limitation is expected to be improved.
A pavement construction process consists of series of lay-down operation for pavement materials to form a designated thickness and compaction operation for the lay-down layer to form a designated strength. A technological breakthrough in pavement compaction equipment was made in last 15 years in western countries: intelligent compaction roller, that is equipped with GPS along with other pavement response sensors is becoming a game-changer in pavement construction. This paper introduces AR system that may be used in asphalt pavement compaction operation using intelligent compactor. Since AR technology is very new concept in road construction society, a suggestion for accompanying education program was also made for specific task group in pavement compaction operation. Since AR technology has not been introduced in asphalt pavement compaction operation, the AR compaction management would lead the construction quality of asphalt pavement to the beyond level.
Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
/
2004.04a
/
pp.71-76
/
2004
Development of industry is increased Traffic Volume and have brought increase of road. As a result, Maintenance-management expense of the whole road is rapidly increase. Operation of PMS (Pavement Management System) need that it is efficiently for maintenance-management the whole road network Into budget limited. PMS is effective management through Investigation of roughness, crack, plastic deformation, etc of road. Advanced nation recognizes necessity of maintenance-management of road, progress to investigation and research. Our country is lacking that systematic pms's application and research. Therefore, this research estimated using of surveying method of DGPS that roughness of road for investigation-step of PMS. At the future, this paper may contribute in research of automatic surveying system for road surface.
Jung Hee Lee ;bragimov Eldor ;Heungbae Gil ;Jong-Jae Lee
Smart Structures and Systems
/
v.32
no.5
/
pp.309-318
/
2023
The appropriate maintenance of highway roads is critical for the safe operation of road networks and conserves maintenance costs. Multiple methods have been developed to investigate the surface of roads for various types of cracks and potholes, among other damage. Like road surface damage, the condition of expansion joints in concrete pavement is important to avoid unexpected hazardous situations. Thus, in this study, a new system is proposed for autonomous expansion joint monitoring using a vision-based system. The system consists of the following three key parts: (1) a camera-mounted vehicle, (2) indication marks on the expansion joints, and (3) a deep learning-based automatic evaluation algorithm. With paired marks indicating the expansion joints in a concrete pavement, they can be automatically detected. An inspection vehicle is equipped with an action camera that acquires images of the expansion joints in the road. You Only Look Once (YOLO) automatically detects the expansion joints with indication marks, which has a performance accuracy of 95%. The width of the detected expansion joint is calculated using an image processing algorithm. Based on the calculated width, the expansion joint is classified into the following two types: normal and dangerous. The obtained results demonstrate that the proposed system is very efficient in terms of speed and accuracy.
Pavement distresses are one of the most important data for pavement management systems. Inspection machines and its related programs have been used for operating tools in PMS developed in advanced countries. In Korea imported machines and programs for the length price ale utilized to get information of pavement condition from the field This study is launched for developing the program which can detect cracks on asphalt pavement due to many drawbacks in current PMS operation such as improper maintenance work and long resting period when it was broken. The focus of this study is to define principles to analyze pavement surface with digital image processing techniques, to test property of pavement images and to suggest an algorithm that reduces noises at test. To test images, the camera attached on the Automatic Road Analyser(ARAN) was used. Through the FFT images, histogram and statistical values of pavement images, it was found that the images had many noises with high-frequency components against general images, and it was difficult to subdivide pavement images into background or crack. Through several testing with various filters for noise reduction a 3X3 median filter was suggested to reduce noises effectively.
Transactions of the Korean Society for Noise and Vibration Engineering
/
v.14
no.11
/
pp.1153-1160
/
2004
In contemporary society, vibration and noise in the road nearby buildings have become social problems as vehicles operation has increased. Especially. in the case of the building used to art performance, available suitability of the building is tested by the indoor noise class. Therefore, the Purpose of this paper is the measurement of the structure-borne noise of Seoul Art Center nearby Umyeonsan tunnel and analyzing the effects of countermeasure to it. To measure the effects of countermeasure, not only structure-borne noise is measured, but also the vibration is measured, before and after the construction of Pavement using pad and porous asphalt. Consequently, the sound pressure level in art center 1st floor is reduced after mat pavement method, structure-borne noise that was high In 25Hz wide-band before pavement decreased regardless of experimental vehicle's velocity Using porous asphalt pavement the noise was reduced about 3 dB(A).
Korean Journal of Construction Engineering and Management
/
v.21
no.6
/
pp.16-26
/
2020
Road Pavement Maintenance Work is generated in a variety of different field conditions, and it is difficult to calculate the construction cost because there are no detailed criteria when preparing the estimated construction cost. Unlike new pavements, Road Pavement Maintenance has to be constructed with operating vehicles, and there are many differences in productivity depending on urban areas, limited work hours, night-time, construction area, etc. To compensate for this, the standard for calculation of construction cost provides additional charges for the number of lanes, residential areas, working hours, and night work, but it applied differently depending on construction officials. In this study, construction cost estimation standards that can properly reflect the conditions of the site was investigated for major types of Road Pavement Maintenance work. The site was investigated and analyzed mainly for many construction sites with 'overlay of asphalt after cutting', 'restore surface', 'repair of pavement', and 'recovery of roadway'. The criteria for the application of construction volume separately according to working hours, public places, and land area including extra charges for basic downtown and residential area. The hours of operation were divided into three types(7 hours, 5 hours, 3 hours) excluding movement and preparation time, and each type provided a coefficient for dividing the area of the construction site into five types. The construction cost calculation method based on the construction purpose is site conditions is proposed accordingly, and it is deemed that a plan for the designer to calculate the construction cost has been prepared in consideration of the site conditions.
Among the forest road pavement methods, the majority of current constructions utilize concrete pavements but it has disadvantages as follows: many cracked concrete pavements generated by the erosion of underlying soil layers, could not be used as forest roads in steep slope during winter, and cement contains hazardous chemicals (hexavalent chromium, etc.). In order to supplement the limitations of the use of concrete pavement, this study was conducted to investigate the operation process and cost, the strength and compaction of the experimental forest road pavement(85 m) utilizing eco-friendly solidification material at Goryeong-gun, Gyeongsangbuk-do. The work elements of experimental forest road paving were classified into: preparation, Roadbed excavation, Roadbed grading, subgrade compaction, form work, collection and selection of site soil, mixing site soil and eco-friendly solidification material, paving by eco-friendly solidification material, compaction by vibrating roller and curing. The result of economic analysis using construction cost shows that for concrete costs total to $38,681won/m^3$ while for the eco-friendly paving material it is $38,245won/m^3$. Thus the construction costs for concrete and the eco-friendly paving material are similar. And the results of the Schmidt Hammer test for strength analysis by curing period are 10.5-13.5 MPa for 7 days, 18.1-22.7 MPa for 14 days, and 20.8-23.0 MPa for 28 days.
Currently existing Accelerated Pavement Testing (APT) systems developed in several countries have been employed mainly to test the performance of asphalt pavement. Meanwhile, the length of concrete pavement is similar to that of asphalt pavement in expressways of Korea. and is expected to increase due to its durability and compatibility to our weather condition. To meet the society's demand of having our own APT system which can examine the long-term performance of concrete pavement, a contract study to develop Korea Accelerated Loading and Environment Simulator (KALES) for concrete pavement has been performed for 3 years from 1997 through 1999. Through the project, a detailed design was Peformed for the KALES system in which the entire structure of KALES, loading mechanism, wandering mechanism, suspension system, driving system were proposed. Also in advance to design a full-scale KALES system, a sample scale model was manufactured and tested for operating motion and force distribution. It is evident that the proposed prototype KALES system will provide higher degree of traffic simulation and durable operation, based on the satisfactory fatigue analysis.
Kim, Nakseok;Jeong, Jin-Hoon;Lee, Jae-Hoon;Park, Changwoo
KSCE Journal of Civil and Environmental Engineering Research
/
v.26
no.1D
/
pp.89-94
/
2006
Premature failures in pavements are frequently reported due to rapid increasement in traffic volume, heavy vehicles, and high temperature in the summer. Based on this concept in mind, Korea Highway Corporation established the Test Road Operation Center to estimate the pavement performance. To evaluate the pavement performance effectively using the field data, wandering is an important topic in pavement analysis. In this study, portable wandering system was developed and analyzed to investigate the pavement responses due to the dynamic truck passes, and analyzed the wandering to dynamic load test. The test results revealed that the advantages of laser devices were noticeable compare to the other measuring ones. To understand the behavioral characteristics of pavements using the wandering measurement devices, dynamic truck tests were conducted in the field. Test results showed that the effects of wandering on asphalt pavement were significant. The data analysis using this wandering effect is considered as an important tool in performance analysis of asphalt concrete pavement.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.