• Title/Summary/Keyword: road maintenance

Search Result 577, Processing Time 0.022 seconds

Estimation of spatial parameters to be included in 3D mapping for long-term forest road management

  • Choi, Sung-Min;Kweon, Hyeongkeun;Lee, Joon-Woo
    • Korean Journal of Agricultural Science
    • /
    • v.47 no.4
    • /
    • pp.727-742
    • /
    • 2020
  • Point cloud-based 3D maps can obtain many kinds of information for maintenance work on forest road networks. This study was conducted to compare the importance of each factor to select the factors required for the mapping of 3D forest road maps. This can be used as basic data for attribute information required to maintain forest road networks. The results of this study found that out of a total of 30 indexes extracted for mapping 3D forest roads, a total of 21 indexes related to stakeholder groups were significantly different. The importance of the index required by the civil service group was significantly higher than that of the other groups overall. In the case of the academic group, the index importance for cut slope, fill slope, and drainage facility was significantly higher. On the other hand, the index importance for the forestry cooperative and forest professional engineer group was mostly distributed between the civil servants' group and the academic group. In particular, the type of drainage system showed the highest value among the detailed indexes. Overall, drainage related factors in this survey had high coefficient values. The impact of water on forest roads was the most important part in road maintenance. In addition, the soil texture had a high value in relation to slope stability. This is thought to be because the texture of the soil affects the stability of the slope.

Evaluation on De-Icing Salts Laden Environment of Road in Seoul (제설제에 노출된 서울시내 도로 시설물의 열화 환경 분석)

  • Yoon, In-Seok
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.26 no.1
    • /
    • pp.1-9
    • /
    • 2022
  • De -icing salts have been used commonly in areas where snow or ice is a seasonal safety hazard for roadway, however, the salts is one of main causes on serious deterioration of road infrastructures in crowded urban city like Seoul. In order to establish maintenance strategy of road infrastructures under de-icing salts laden environment, it is necessary to examine environmental characteristics and its response to the existing facilities. The purpose of this study is to evaluate the deterioration environment of road infrastructures. Additional purpose is to develop a design model and details for durability design of infrastructures under de-icing salts laden environment, considering mainly a build-up rate of surface chlorides. Concentration of external chloride solution and surface chloride content were calculated at the level of average de-icing salts for 5 years, ratio of auxiliary road of 17.5 to 30%, and effective exposure area to snow 50 to 80%. The chloride build-up rate was 0.073 ~ 0.077% / year and the maximum surface chloride content was calculated to be 2.2 ~ 2.31% by concrete wt. This study is expected to be used for establishing integrated strategy of road infrastructures, such as predicting chloride profiles or degree of chemical corrosion to exposure concrete.

Construction of Management System of Road Position Information Using GPS Surveying Data

  • Kim, Jin-Soo;Roh, Tae-Ho;Lee, Jong-Chool
    • Korean Journal of Geomatics
    • /
    • v.3 no.1
    • /
    • pp.15-22
    • /
    • 2003
  • This study aims to construct a management system of road position information as part of the build-up to a maintenance and management system of highways. First, information on the positions of the roads were obtained by a real-time kinematic satellite surveying, and then the degree of accuracy was analyzed in comparison with the data of the existing design drawings. The linear coordinates of road center line obtained by using RTK GPS showed about 7.6-13.2cm errors in X and Y directions in the case of the national road No.2 section, and about 8.4-9.2cm errors in the case of local road No.1045 section. These errors were within the tolerance scope regulated by the TS survey, and could be practically used. In the case of vertical alignment, there were about 6.2cm errors in the Z direction in local road No.1045 section. Aerial photographs are normally used in producing numerical maps, and it can be practically used because the tolerance scope of the elevation control point is l0cm when the scale of aerial photographs is 1/1000. The management system of road position information, utilizing Object-Oriented Programming(OOP), was built having the data acquired in this way as the attribute data. The system developed in this way can enable us to spot the positions of road facilities, the target of management with ease, to easily update the data in case of changes in the positions of roads and road facilities, and to manage the positions of roads and road facilities more effectively.

  • PDF

Basic Study of the Improvement of Maintenance Process for Efficient Highway Pavement Management (효율적인 고속도로 포장유지관리를 위한 유지관리프로세스 개선방안 기초연구)

  • Park, Jong-Beom;Lee, Yong-Jun;Lee, Min-Jae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.11
    • /
    • pp.6932-6942
    • /
    • 2014
  • The expressway is a key area of road networks for national industry, economics and social development. In addition, the number of lines are increasing continuously. Recently, road management policy have shown a paradigm shift to safe road, low-carbon and green etc. Nevertheless, the road condition has deteriorated dramatically by fatigue cracking, thermal cracking and weather impact. On the other hand, the budgets for highway maintenance have shrunk dramatically. In this study, an effective pavement management and maintenance process was developed to extend the pavement serviceability and pavement life to overcome the rack of budgets.

Impact effect analysis for hangers of half-through arch bridge by vehicle-bridge coupling

  • Shao, Yuan;Sun, Zong-Guang;Chen, Yi-Fei;Li, Huan-Lan
    • Structural Monitoring and Maintenance
    • /
    • v.2 no.1
    • /
    • pp.65-75
    • /
    • 2015
  • Among the destruction instances of half-through arch bridges, the shorter hangers are more likely to be ruined. For a thorough investigation of the hanger system durability, we have studied vehicle impact effect on hangers with vehicle-bridge coupling method for a half-through concrete-filled-steel-tube arch bridge. A numerical method has been applied to simulate the variation of dynamic internal force (stress) in hangers under different vehicle speeds and road surface roughness. The characteristics and differences in impact effect among hangers with different length (position) are compared. The impact effect is further analyzed comprehensively based on the vehicle speed distribution model. Our results show that the dynamic internal force induced by moving vehicles inside the shorter hangers is significantly greater than that inside the longer ones. The largest difference of dynamic internal force among the hangers could be as high as 28%. Our results well explained a common phenomenon in several hanger damage accidents occurred in China. This work forms a basis for hanger system's fatigue analysis and service life evaluation. It also provides a reference to the design, management, maintenance, monitoring, and evaluation for this kind of bridge.

A Study on the Construction of Non-National Forest Road in Japan (일본의 민유림 임도사업에 관한 고찰)

  • Cha, Du-Song;Kobayashi, Hiroshi;Ji, Byoung-Yun
    • Journal of Forest and Environmental Science
    • /
    • v.13 no.1
    • /
    • pp.104-113
    • /
    • 1997
  • Japan is considered to have accumulated much experience of the maintenance. financial support. construction. and related law system of non-national forest road. These data were collected and reviewed to provide the basis of the legal and institutional framework for the forest road construction of Korea. The results show that the non-national forest road plays a key role in the development and enhancement of rural areas' surroundings as its legal and institutional systems are brought to effect and meet the period' s requires.

  • PDF

Lifetime Prediction of a P.S.C Rail Road Bridge (P.S.C 철도교량의 잔존수명 예측)

  • Yang Seung-Le
    • Journal of the Korean Society for Railway
    • /
    • v.8 no.5
    • /
    • pp.439-443
    • /
    • 2005
  • The biggest challenge bridge agencies face is the maintenance of bridges, keeping them safe and serviceable, with limited funds. To maintain the bridges effectively, there is and urgent need to predict their remaining life from a system reliability viewpoint. In this paper, a model using lifetime functions to evaluate the overall system probability of survival of a rail road bridge is proposed. In this model, the rail load bridge is modeled as a system. Using the model, the lifetime of the rail road bridge is predicted.

Estimation of Life Expectancy and Budget Demands based on Maintenance Strategy (도로포장 유지보수 전략에 따른 기대수명과 보수비용산정)

  • Han, Dae-Seok;Do, Myung-Sik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.4D
    • /
    • pp.345-356
    • /
    • 2012
  • Road pavement requires repetitive maintenance works to maintain satisfactory service level to the public. However, the repetitive maintenance works upon deteriorated pavement structure make negative effects to deterioration speed. It often leads to inefficient use of limited budget. For that reason, the pavements require reconstruction work to recover their original performance. Recently, construction demands in the Korean national highway have already been reached to maximum level, and the aged pavements start to demand much more reconstruction works. However, in the real world, road agencies have often been confused when they determine maintenance design for such aged road sections due to budget constraint. It is because there is no reliable long-term maintenance strategy that supports their decision making. To support their decision making, this paper aimed to suggest the best maintenance strategy considering changing process of pavement performance by repetitive maintenance works. As an analysis method, probability distribution and hazard function to estimate the life expectancy were adopted, and then the results were used for long-term life cycle cost analysis with deterministic or Monte-Carlo method under various scenarios. As an empirical study, the Korean national highway data that has long-maintenance history data since 1986 has been applied. Last, this paper considered quality assurance of maintenance work to improve maintenance quality. These could be important information as a part of long-term maintenance strategy of pavement.

Estimation of a Level of Service and Cost of Service Function for Road Pavements for Performance Management in the Public Sector (공공부문 성과관리를 위한 도로포장의 서비스수준과 서비스비용 함수 추정)

  • HAN, Daeseok;LEE, Suhyung;LEE, Sang Hyuk;YOO, In-kyoon
    • International Journal of Highway Engineering
    • /
    • v.18 no.4
    • /
    • pp.9-18
    • /
    • 2016
  • PURPOSES : This study aimed to evaluate the performance of pavement management works and to develop a function for estimating the level of service (LOS) and cost of service (COS) for the systematic and quantitative management of pavement performance in the public sector. METHODS : The International Roughness Index (IRI) was used as the performance index for pavement management. Long-term pavement performance data for a period of 7 years (2007-2014) collected by the National Highway Pavement Management System and historical maintenance budget data published by the South Korean government were used to develop the LOS-COS function. Based on the function, a model for estimating the appropriate budget as well as the network conditions was suggested. RESULTS : There was high degree of correlation between pavement performance and the investment level (R = - 0.74). The developed LOS-COS function suggested that the unit cost to improve the network IRI to 1 m/km was 32.6 billion KRW. Further, the maintenance costs normalized with respect to the LOS levels were LOS-A = 88.2 billion KRW, LOS-B = 55.6 billion KRW, and LOS-C = 23.0 billion KRW. CONCLUSIONS : This study proposes a simple way of developing a LOS-COS function. It also shows how to develop a network budget demand and condition estimation model using the LOS-COS function. In addition, it is the first attempt to evaluate the road maintenance budget in South Korea. It is expected that these results will help in the negotiations between the road managers and budget makers.

An Experimental Study on the Safety Performance of the Rear Safety Guard with Air Bag for Truck (화물차량용 에어백 후부안전판 안전성능에 대한 실험적 연구)

  • Park, In-Song;Yun, Kyung-Won;Park, Kwang-Jong;Kim, Hyo-Jun
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.22 no.4
    • /
    • pp.10-19
    • /
    • 2014
  • Despite the movement of safe traffic by the Korean government to reduce deaths in traffic accidents, the casualties increase year by year. In particular, more and more accidents and casualties are reported from car collisions from the back of the vehicles parked for managing traffic accidents on the road, cleaning main roads and medial strips, repairing roads. In order to response to these accidents, the government should take protective measures for road users. In the last decade, seventy-one cases have been reported to occur during highway repair and maintenance. As a result, eight persons were killed and seventy-six were injured, showing the high death rate of 11.3 percent. Therefore, it seems urgent to take some actions against it. The United States and European countries legislate that vehicles of road repair and maintenance should be mandatorily equipped with shock absorber at the back. Korea, however, does not have such legislative measures, which are needed at this time to protect workers on the road. This study compares the performance of the traditional shock absorber for road maintenance vehicles with that of the rear safety guard using air bag, manufactured in accordance with related laws in Korea. Based on the results of the 60km/h rear collision test, this paper proposes improvements in related laws and regulations in an attempt to reduce casualties.