Objective : Today, a study about the meridian is at a standstill because there is no any fundamental study to verify an essence of meridian or to take advantage of meridain. It searched the direction of new meridain study by making out road-map about meridain study to overcome the standstill. Method : It has had a through grasp of the problem of meridian study through analysis of papers for degrees and academy journals of study in connection with meridian published till now. It has made out road-map of Meridian study under a principle establishing road-map because of these problems. Results : The major problems of former studies about meridain are as follows. One is not to have any cooperation with other medical fields. The other is not to have any practical study. It searched the direction of new meridian study by road-map detailed as well as overall to overcome the difficulties. Conclusions : The new direction of meridian study is to build ideal methodical frame and modern meridian model through studying of among school systems. It will interpret newly and modernize traditional meridian theory with being connected with science technology.
International conference on construction engineering and project management
/
2009.05a
/
pp.1283-1287
/
2009
The Korean government implemented 259 road projects from 2004 to 2007, valued at $18.4 billion. Change orders of these road projects occurred 8,973 times and, subsequently, caused significant increases in the cost of the projects, approximately up to $4.2 billion (22.8% of the initial budget). These significant problems of huge change orders require a more workable control system for budget management whereas the effectiveness of the government's control is still not satisfied. However, previous approaches and studies mostly limited their analyses to simply classifying the causes of the change orders. This paper investigates the real frequency and cost impacts incurred by each cause of a change order, primarily based on 218 road projects in Korea. The paper then identifies the attributes of change orders through a survey of 204 project participants in that those sources were inevitable or avoided if properly managed. The causes of the change orders are further analyzed with analysis of variance (ANOVA) in connection with contract volume, bid award rate, the contractor's capacity to perform, and the design company's capacity. This study found that if the contract volume is smaller, then the possibility of change orders is higher. Interestingly, if the bid award rate is less than 67.5%, it signifies the highest rate of change orders. In addition, the contractors whose construction ability is assessed as the top-ranked group showed the lowest change order rates. With these results, this paper provides the preventive guidelines for reducing the likelihood of change orders.
This study was conducted to evaluate the feasibility of expedite repairing of concrete pavements using precast concrete pavement method and to investigate the effectiveness of slab connection methods. In the demonstration construction, four slabs of jointed concrete pavements were replaced with the precast slabs. First, precast concrete slabs were designed and fabricated, then existing slabs were cut and removed, and finally precast slabs were installed. The slabs were leveled and pockets, holes, and space between the slab bottom and the underlying layer were grouted. From the demonstration construction, details about the design and construction of the precast pavements for repairing of pavements were evaluated. In addition, the slab connection methods such as pocket and hole connection methods were applied in the construction and the slab curling behaviors at the joints that include those connection methods were compared. The results showed that both slab connection methods were applicable, and the hole connection method was superior.
KSCE Journal of Civil and Environmental Engineering Research
/
v.43
no.2
/
pp.219-230
/
2023
Cities are continued to be highly advanced and metropolitanized. Lands adjacent to road make entry/exit connection increase along with construction of facilities for various purposes. However, in the absence of specific installation standards of entry and exit connection, inappropriate access location, types of access, and operation methods are deteriorating the level of traffic services at existing roads and intersections. Therefore, in order to minimize the traffic impact from entrances connected to minor arterial roads and colletor roads, first, this study re-established the waiting length in the intersection of upstream and downstream and length required for changing lanes and between entrance/exit and connection, considering the road and traffic environment in contact with the entrance. Second, it is suggested that the operation method depending on the connection type and whether to install left turn lane and acceleration and deceleration lane can be determined quantitatively by relation with the service level of nearby intersection after calculating the threshold amount of business site through negative social cost, which is the difference between the installation cost of the left turn lane and the acceleration and deceleration lane according to the type of access to the entrance and exit.
In this study, landscape changes were examined by periods through the analysis of visual quantity on the landscape components of national road including the mountains, the sky, road pavements, street trees, paddy fields and dry fields, billboard, telegraph pole, building, structure, slope, guard fence, soundproof wall, and median strip etc. For this, subject national road in suburb arreas was selected to grasp its landscape characteristics, and divisional criteria of landscape type of the national road were suggested to look into the trend of landscape changes by periods. Findings of this study are as follows:1.Divisional criteria of landscape type of the national road include location and geometry, structure, land use, perspective, and surrounding buildings of the national road. 2.The highest visual quantity was found in road pavements by periods among landscape components of the national road. It was found that this result has a thread of connection with previous study emphasizing the importance of road geometry as one of landscape components, and road geometry shall be regarded as a visually significant component in analyzing and evaluating landscape of the national road. 3.Most distinguished factors of landscape changes of the national road by periods were median strip(F=33.296) and street tree(F=32.881), and then the sky(F=24.735) and mountain(F=23.477) showed similar level of statistically significant difference. However, statistically significance difference was not found in buildings and structures. 4.It was shown that natural elements decreased gradually but structural landscape made of artificial elements became the main in construction of the national road. This result implies that although the scenic and ecological soundness is recognized in construction of the national road, it is not out of the limitation of functionalities that is, access and mobility.
The joints between precast PSC slabs of the intermediate road slab in double deck tunnel are inevitably generated in the road traffic vehicle traveling direction. Therefore, it is important to make the behavior of parts on the joint in one piece. The imtermediate road slab system of double deck tunnel in great depth proposed in this study will be constructed with precast PSC slab in order to minimize the construction period. And the joint connection between the precast slab has been developed in two methods: the 'Transverse tendon reinforcement method' and 'High strength bolts connection method'. Also, the experiments were performed for the full scale model in order to evaluate the performance of the intermediate road deck slab with two type joints systems, the structural stability was verified through the F.E.M analsysis. The results of static loading test and F.E.M analysis investigated a very stable behavior of intermediate road deck slab in double deck tunnel applying the joint methods developed in this study, in the cracks and deflections to satisfy the design standards of Highway Roads Bridges (2011), it was determined that there is no problem even servicebility.
Journal of the Korea Academia-Industrial cooperation Society
/
v.19
no.12
/
pp.725-733
/
2018
With urbanization projects involving trunk roads progressing, many simple interchanges, which separate passing traffic into the main traffic and access subtraffic, are being constructed to maximize the traffic capacity. Under the current Road Connection Rule, the access-prohibited section in an interchange is determined based on the access lane and limit distance in the complete interchange road, but separate criteria for the simple interchange are not defined. This may cause confusion in the Road Management Office's determination of the access-prohibited section in the simple interchange, or lead to the application of the criteria for the access-prohibited section in the complete interchange without considering the features of such interchange. This study conducted a comparative analysis of the domestic and overseas systems related to the installation of access section in trunk roads, such as general national roads. This paper presents a survey of the methods for applying the access-prohibited section in the interchange along with the actual cases and proposes improvement measures for a rational calculation of the access prohibited installation section in the simple interchange to minimize the downsides associated with the application of the extremely strict criteria. The proposed road connection rule improvement measures based on the consideration of the purpose of installing the simple interchange and on the consideration the features of the simple interchange are expected to prevent administration confusion by the field road management offices as well as the waste of unnecessary efforts and costs by petitioners so they can boost the service satisfaction for people and the administrative reliability.
Natural disasters such as hurricanes, floods frequently occurs in the world. The cause of the natural disasters that occurs due to global warming because of increasing of global greenhouse gas emissions. To prevent the global warming, lots of researchers are studying renewable energy area. In order to protect grobal warming, government is trying to reduce green gas emissions under "Low Carbon Green Growth Policy" and investing climiate-friendly industries such as renewable energy harvesting. Research team is developing a renewable energy system that harvests mechanical energy imparted to road from driving vehicles and generates it into renewable electricity. This paper presents the research results of size effect of the piezoelectric ceramic and connection of piezoelectric ceramics. Power characteristics of piezoelectric ceramic as function of experimental variables were measured and analyzed.
Journal of Korean Society for Geospatial Information Science
/
v.20
no.3
/
pp.101-108
/
2012
The construction of data connection is required due to the digital map do not have the new address data which is implemented by the Korea government and it cannot use between government and other agency. The manually matching of digital map and new address data is time and money consuming process due to the huge amount of data. In this research, new system is developed for data generation of attribute data by the data connection method of digital map and new address data using spatial matching and matching rate of data connection is analyses. The results of data matching rate in the research area are 84% in building case and 67% in road case in 1:1000 digital map at Suwon and 18% in building case and 21% in road at Seogwipo.
The Journal of Korean Institute of Electromagnetic Engineering and Science
/
v.25
no.2
/
pp.223-234
/
2014
This paper describes the analysis results of channel characteristics in the operating area of satellite OTM(On-The-Move) terminal. The communication channel between the Koreasat-5 and OTM terminal on a test car is measured and recorded from Daejeon to Daecheon, using the downlink frequency of around 20 GHz. And the measurement data are divided into two classes ; highway environment and national road environment, and then are statistically analyzed. The statistical evaluation of satellite channel is conducted by using probability density function and Markov model and then presents average connection duration(ACD), average fade duration( AFD), and level crossing rate(LCR) of highway environment and national road environment. Finally the statistics data of the two environments are compared with each other.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.