• Title/Summary/Keyword: road alignment design

Search Result 65, Processing Time 0.022 seconds

Construction of Management System of Road Position Information Using GPS Surveying Data

  • Kim, Jin-Soo;Roh, Tae-Ho;Lee, Jong-Chool
    • Korean Journal of Geomatics
    • /
    • v.3 no.1
    • /
    • pp.15-22
    • /
    • 2003
  • This study aims to construct a management system of road position information as part of the build-up to a maintenance and management system of highways. First, information on the positions of the roads were obtained by a real-time kinematic satellite surveying, and then the degree of accuracy was analyzed in comparison with the data of the existing design drawings. The linear coordinates of road center line obtained by using RTK GPS showed about 7.6-13.2cm errors in X and Y directions in the case of the national road No.2 section, and about 8.4-9.2cm errors in the case of local road No.1045 section. These errors were within the tolerance scope regulated by the TS survey, and could be practically used. In the case of vertical alignment, there were about 6.2cm errors in the Z direction in local road No.1045 section. Aerial photographs are normally used in producing numerical maps, and it can be practically used because the tolerance scope of the elevation control point is l0cm when the scale of aerial photographs is 1/1000. The management system of road position information, utilizing Object-Oriented Programming(OOP), was built having the data acquired in this way as the attribute data. The system developed in this way can enable us to spot the positions of road facilities, the target of management with ease, to easily update the data in case of changes in the positions of roads and road facilities, and to manage the positions of roads and road facilities more effectively.

  • PDF

Generation of 3D Design Data using Laser Scanning Data

  • Park, Joon Kyu;Lee, Keun Wang
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.39 no.5
    • /
    • pp.343-349
    • /
    • 2021
  • In The process from design to construction in the existing construction work was less efficient due to the contradictory approach of identifying the 3D state in the plan view and the repeated generation of surveys, floor plans, drawings. Accurate 3D design data is essential for smart construction. However, most of the existing related studies have focused on explaining the development method and main functions of equipment or improving the productivity of smart construction. Therefore, in this study, the utility of 3D design model generation for smart construction and construction survey using 3D laser scanner was evaluated. Plane and vertical road alignment were created using the specifications of the road. The generated road alignment was created as a three-dimensional corridor design using cross-sections at intervals of 20m. In addition, it was possible to create a DTM (Digital Terrain Model) using a digital map and effectively create a 3D design model for the study area through overlapping. Construction survey using a 3D laser scanner showed accuracy within 10cm as a result of the accuracy evaluation. These results proved that construction surveying using a 3D laser scanner is possible because it satisfies the acceptable accuracy of the relevant regulations modeling of target areas using 3D design and construction survey using 3D laser scanner can be a way to address shortcomings of existing GNSS (Global Navigation Satellite System) methods. And accurate 3D data will be used as essential data as basic data for smart construction.

Development of Highway Safety Evaluation Considering Design Consistency using Acceleration (가속도를 고려한 도로의 설계일관성 평가기법에 관한 연구)

  • 하태준;박제진;김유철
    • Journal of Korean Society of Transportation
    • /
    • v.21 no.1
    • /
    • pp.127-136
    • /
    • 2003
  • Road safety is defined under the minimum design standard and design examination process is consisted of the standard according to current road design. However, road safety in practical way is correlative to not only all element of roads but also road shape, such as, between straight line and curved line and between curved lines. Also. it is related to alignments such as horizontal alignment and vertical alignment, and cross section. That is, the practical road design should be examined in both sides of 3 dimension and consecutiveness (consistency) as the actual road is a 3 - dimensional successive object. The paper presents a concept for acceleration to evaluate consistency of road considering actual road shape on 3-dimension. Acceleration of vehicle is influential to road consistency based on running state of vehicles and state of drivers. The magnitude of acceleration. especially, is a quite influential element to drivers. Based on above, the acceleration on each point on 3-D road can be calculated and then displacement can be done. Computation of acceleration means total calculation on each axis. Speed profile refers to “Development of a safety evaluation model for highway horizontal alignment based on running speed(Jeong, Jun-Hwa, 2001)” and then acceleration can be calculated by using the speed pronto. According to literature review, definition of acceleration on 3-D and g-g-g diagram are established. For example, as a result of the evaluation, if the acceleration is out of range, the road is out of consistency. The paper shows calculation for change of acceleration on imaginary road under minimum design standard and the change tried to be applied to consistency. However accurate acceleration is not shown because the speed forecasting model is limited and the paper did not consider state of vehicles (suspension, tires and model of vehicles). If speed pronto is defined exactly, acceleration is calculated on all road shapes, such as. compound curve and clothoid curve. and then it is appled to consistency evaluation. Unfortunately, speed forecasting model on 3 -D road and on compound curves have rarely presented. Speed forecasting model and speed profile model need to be established and standard of consistency evaluation need to developed and verified by experimental vehicles.

Introduction on the by-pass road construction for Siem Reap, Cambodia (캄보디아 시엠립 우회도로건설 사업 소개)

  • Roh, Han-Sung;Kim, Hyo-Bae
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.614-625
    • /
    • 2008
  • The project of Construction of Siem Reap bypass road in Cambodia consists of alignment improvement of existing route, extension of width of road and laterite paving. This project is carried out by fast-track method on the design and construction for bypass road of 15.2 km length and 8m width for five months. Though some difficulties for the construction works such as the location of borrow pit and rock source, rainy seasons etc, the construction could be completed successfully owing to the cooperation of related authorities, company and residents. This 2 way Angkor detouring road will function as industrial roads in Siemreap region. These new two roads will not only bring better logistics requirements and safety, but also impact to poverty alleviation and preservation the beauty of the ecological environment of Angkor region. The basic information related to geotechnical engineering of this project is introduced.

  • PDF

An Estimation Model of Historical Cost Using BIM Library for Road Project (도로분야 BIM 라이브러리를 활용한 실적공사비 산정모델 구축)

  • Moon, HyounSeok;Ju, KiBeom
    • Korean Journal of Computational Design and Engineering
    • /
    • v.20 no.4
    • /
    • pp.431-442
    • /
    • 2015
  • Currently, a BIM-based quantity takeoff (QTO) system is mainly focused on architectural projects. To perform this, diverse quantity takeoff methods such as an object-based automatic quantity takeoff, manual quantity and base functions of calculation have widely been utilizing. However, since BIM library for road projects includes structural elements associated with alignment, it is necessary to establish cost estimation system interlocked with historical cost using 3D library by each unit length. Accordingly, the aim of this study is to develop cost estimation model with using a historical cost approach so that it can be utilized in construction planning based on the BIM library for road projects. For this, based on the BIM library for road, the standardized quantity is estimated, and a process for calculating historical cost and a verification model with a 5D simulation was developed by mapping a WBS code with each BIM library object. This can be applied during the approximate cost estimation process in a project planning and an initial design phase for road projects. Besides, it is expected that these results will be utilized in constructing an optimal historical cost estimation process for project libraries.

Route Planning Considering Risk Factors Based on GIS (GIS 기반의 리스크 요인을 고려한 노선 계획)

  • Roh Tae-Ho;Jang Ho-Sik
    • International Journal of Highway Engineering
    • /
    • v.8 no.3 s.29
    • /
    • pp.1-19
    • /
    • 2006
  • Researches on method for quantitative analysis applied with decision-making in consideration of variation in risk factors based on GIS(Geographic Information System) concluded as follows. Firstly, by way of decision-making in consideration of variation in risk factors, quantitative analysis performed for the existing route was applied to the new route, which would bring about reliable criteria in route planning and basic design stage. Secondly, horizontal and vertical alignment were easily available out of GIS for relatively speedy design and analysis with three dimensional alignment by decision-making in route planning. Thirdly, automation of route alignment is possible by utilizing quantitative evaluation system established in this research so that a risk analysis can be carried out in a relatively short time. Therefore it will eventually contribute to further development of road design technology.

  • PDF

A Study of driving simulator applications for road safety in geometric design (도로선형과 기하구조 연구를 위한 드라이빙 시뮬레이터의 교통안전시설 요소분석)

  • Chung, Sung-Hak
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2008.11a
    • /
    • pp.561-567
    • /
    • 2008
  • The objectives of this study is to: (1) develop how applications for driving simulator of national highway safety designs when those are appeared; (2) examine the degree to which those geometric designs of the horizontal and vertical profile; and (3) search positive safety and passive highway safety design of the point at which highway alignment factors initiate driving safety to facility or highway design.

  • PDF

Development of VR Simulation Functions for Supporting Optimal Design Information in Road Project (도로공사의 최적 설계정보 지원을 위한 VR시뮬레이션 기능 구축)

  • Kang, Leen-Seok;Moon, Hyoun-Seok;Park, Seo-Young;Bae, Cheol-Won;Kim, Min-Ji
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.662-665
    • /
    • 2008
  • This research attempts to develop 4D CAD function to support optimal road design by expanding the existing 4D CAD utilization system, which focused on construction phase, to the design phase. The functions such as earthwork simulation for selecting of road alignment, alternative route simulation and structure type simulation were suggested as functions to support road design. Through those virtual reality (VR) functions, visual confirmation of the condition of route and earthwork Is possible by the developed system, and an optimal alternative route can be selected by carrying out layout simulation of the alternative route. The functions presented in this research provide the decision making tools based virtual model for efficient support to road design.

  • PDF

Vehicle Behavior Characteristics According to the Change of Vehicle Speed and Road Vertical Grades (차량속도와 도로의 종단경사 변화에 따른 차량거동 특성)

  • Park, Hyeong-Seon;Yoon, Jun-Kyu;Lim, Jong-Han
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.14 no.4
    • /
    • pp.165-172
    • /
    • 2014
  • When a vehicle is running on the road, the surface conditions and environment of road by reason of insufficient road design standards is so greatly that have an effect on drivers. In particular, the road design of the past is conducted empirical and ideal judgment, but recently, the new technical development is attempted that three and four dimensional parameters is reconsidering and adjusting at the same time. In this study, we analyzed the vehicle behavior characteristics according to the change of driving speed and vertical grades on braking at the peak point of the frozen road by using a PC-crash program for traffic accident reconstruction. As a result, we were conformed the fact that the friction coefficient of road surface and the vehicle speed is affected by vehicle behavior characteristics for intersection vertical grades and were showed the feasibility of verification through a simulation in order to solve the problem of road design in advance.

Characteristic analysis of inductive contactless power transformer laid under the road/railway for performance improvement (도로/궤도 매립형 무접촉 집전장치의 전력전달 성능개선을 위한 특성해석)

  • Han Kyung-Hee;Lee Byung-Song;Baek Soo-Hyun
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.1425-1430
    • /
    • 2004
  • In this paper, the inductive power transformer using electromagnetic induction for the road/railway applied to contactless power transfer system is suggested and some ideas for power collector design to improve the power transfer performance are presented. The proposed the inductive power transformer is used for the light railway/road transportation system. which has a large air-gap and demands a large electrical power capability. But. low output power is generated due to a loosely coupled characteristic of the large air-gap. Therefore, double layer construction of secondary winding, which was divided in half to increase both output current and output voltage was suggested. In addition, the performance of inductive power transformer to alignment condition between the primary power line and the inductive power transformer was verified by computer simulation of 2kW model.

  • PDF