• Title/Summary/Keyword: riverbed degradation

Search Result 12, Processing Time 0.022 seconds

An Analysis of Streambed Changes Downstream of Daecheong Dam

  • Seo, Hyeong-Deok;Jeong, Sang-Man;Kim, Lee-Hyung;Choi, Kyu-Ho
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.8 no.1
    • /
    • pp.103-108
    • /
    • 2008
  • Riverbed change is greatly influenced by artificial factors such as dam construction, gravel collection, and river improvement. This study simulated a long-term bed change based on the GSTARS3 model using actual data from the area downstream of the Geum River Daecheong Dam and compared the estimation with a section of the actual measurement. As a result, it was found that the section of the actual measurement was far lower than the result of the simulation in terms of long-term bed change. While the area downstream of Daecheong Dam displayed approximately an average of 2.29 m of streambed degradation on average while the upper stream area showed approximately 0.63 m of bed degradation over 24 years. In the simulation of the area downstream of Daecheong Dam based on the GSTARS3 model, similar bed degradation was observed. However, a great difference was detected between the result and the actual measurement. According to the cause analysis, the riverbed in the area downstream of Daecheong Dam has continuously degraded due to the dam construction and mass collection of gravel. The mass collection of gravel was the main cause of riverbed change. It was found that about 76% of all riverbed degradation was caused by the mass collection of gravel.

Analysis of Long-Term Riverbed-Level and Flood Stage Variation due to Water Gate Operation of Multi-functional Weirs at Geum River (다기능보의 수문운영에 따른 금강의 장기하상변동 및 홍수위변화 분석)

  • Jeong, Anchul;Jung, Kwansue
    • Journal of Korea Water Resources Association
    • /
    • v.48 no.5
    • /
    • pp.379-391
    • /
    • 2015
  • Multi-functional weirs has been installed in four rivers are hydraulic structures across the river. The structures were divided into movable and fixed weirs. Hence, riverbed-level variation and sediment transport can be varied due to water gate operation. In this study, the long-term riverbed-level variation of Geum river basin due to water gate operation of multi-functional weirs was studied. Result of this study shows that the variation of thalweg elevation was greater than the variation of annual average riverbed elevation due to multi-functional weirs construction and water gate operation. Maximum riverbed degradation of thalweg elevation that occurred was 2.79m and riverbed aggradation was 1.90m. Maximum riverbed degradation of the annual average riverbed elevation that occurred was 2.16m and riverbed aggradation was 1.24m. Analysis result of flood stage by the variation of riverbed-level shows that flood stages were increased in majorities area. The maximum increase in the value of flood stage was 2.23m. For this reason, flood stages can be greater than the freeboard of the levees. Therefore, we should consider the water gate operation of multi-functional weirs when planning and managing sediment in the river. We are expecting to use the result of this study in river planning for river management and selecting the river regime.

A Study on the Applicability of GSTAR-1D to the Riverbed-Level Variation in the Geum River (GSTAR-1D 모형의 금강 하상변동예측 적용성에 관한 연구)

  • Chung, Sung-Young;Park, Bong-Jin;Jung, Kwan-Sue
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2006.05a
    • /
    • pp.1611-1615
    • /
    • 2006
  • The purpose of this study is to simulate the riverbed profile changes downstream of Daecheong re-regulation dam from 1988 to 2001, to evaluate the model's applicability and to predict a long-term riverbed-level variation between 2002 and 2017. As a result of simulation 14 sediment transport equations provided by GSTAR-1D, it was found that Acker's & White formula was the most stable relatively. The interval used to calculate its stability was 7 days for bankful discharge$(1,000m^2/s)$, 3 days for daily maximum flow$(4,273m^2/s)$, 1 day for hourly maximum flow$(7,605m^2/s)$ and minimum flow$(8.5m^2/s)$. The simulation results of river bed changes were evaluated and compared to its measure data from 1988 to 2001. It was showed that there was the degradation for a section between Daecheong re-regulation dam and Maepo water stage gage station due to bed-material, and the degradation for a reach between Maepo and Gongju water stage gage station due to massive aggregate collection. Also, as a result of simulating the river profile change for 2002 to 2017, it was predicted that the section between Daecheong re-regulation dam and Geumnam Bridge would remain as the present profile and the reach between Maepo and Gongju water stage gage station would have some degradations in several parts, which would be stable as a whole unless it was due to artificial river profile change.

  • PDF

Analysis of Piled Piers Considering Riverbed Scouring (교각세굴을 고려한 말뚝기초의 해석)

  • Jeong, Sang-Seom;Suh, Jung-Ju;Won, Jin-Oh
    • Journal of the Korean Geotechnical Society
    • /
    • v.18 no.3
    • /
    • pp.43-50
    • /
    • 2002
  • This paper describes a simplified numerical procedure for analyzing the response of bridge pier foundations due to riverbed scouring. A computationally efficient algorithm to analyze the behavior of a pile group is proposed by considering soil-pile, pile-cap, and pile-fluid interactions. The complex phenomenon of the pile-soil interaction is modeled by discrete nonlinear soil springs (p-y, t-z and q-z curves). The pile-cap interaction is considered by geometric configuration of the piles in a group and connectivity conditions between piles and the cap. The pile-fluid interaction is incorporated into the procedure by reducing the stiffness of the soil-pile reactions as a result of nonlinearity and degradation of the soil stiffness with river bridge scouring. Through the numerical study, it is shown that the maximum bending moment increases with increasing scour depth. Thus it is desirable to check the stability elf pile groups based on soil-pile and pile-cap interactions by considering scouring depth in the riverbed.

Preliminary Experiment of Gravel Contact Oxidation Process in the Tropics

  • Abdullah Keizrul bin;Omachi Toshikatsu
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2006.05a
    • /
    • pp.12-17
    • /
    • 2006
  • Natural rivers have water purification functions called Gravel Contact Oxidation Process, which decontaminate river water by biological absorption, oxidation and degradation on riverbed gravels. This function has been developed and applied to many small/medium-sized urban rivers in Japan as one of the direct river water purification methods. However the method hasn't been verified in the tropics, which have different climate conditions and river characteristics. A preliminary experiment carried out at a polluted urban tributary in the outskirts of Kuala Lumpur, Malaysia where an increasing attention has been paid to river environment, showed a good applicability to the tropical conditions as a technically practical water purification measure with some maintenance cares for sludge management.

  • PDF

Recruitment and Succession of Riparian Vegetation in Alluvial River Regulated by Upstream Dams - Focused on the Nakdong River Downstream Andong and Imha Dams - (댐 하류 충적하천에서 식생이입 및 천이 - 낙동강 안동/임하 댐 하류하천을 중심으로 -)

  • Woo, Hyo-Seop;Park, Moon-Hyung;Cho, Kang-Hyun;Cho, Hyung-Jin;Chung, Sang-Joon
    • Journal of Korea Water Resources Association
    • /
    • v.43 no.5
    • /
    • pp.455-469
    • /
    • 2010
  • Changes of geomorphology in alluvial river and vegetation recruitment on its floodplain downstream from dams are investigated both qualitatively and quantitatively focusing on the downstream of Andong dam and Imha dam on the Nakdong River. Results of the analyses of river morphology and bed material in the study site show a general trend of riverbed degradation with a max scour of 3 m and bed material coarsening from pre-dam value of 1.5 mm in D50 to post-dam value of 2.5 mm. Decrease in bed shear stress due to the decrease in flood discharge have caused vegetation recruitment on the once-naked sandbars. As result, the ratio of area of vegetated bars over total area of bars has drastically changed from only 7% in 1971 before the Andong dam (constructed in 1976) to 25% after it, and increased to 43% only three year after the Imha dam (constructed in 1992) and eventually to 74% by 2005. Analysis of the vegetation succession at Wicjeol subreach, one of the three subreaches selected in this study for detailed investigation, has clearly shown a succession of vegetation on once-naked sand bars to a pioneering stage, reed and grass stage, willow shrub and eventually to willow tree stages. At the second subreach selected, two large point bars in front of Hahoe Village seem to have maintained their sand surfaces without a signifiant vegetation recruitment until 2005. The sand bars, however, seem to have been invaded by vegetation recently, which warns river managers to have a countermeasure to protect the sand bars from vegetation invasion in order to conserve them for the historical village of Hahoe. On the other hand, recruitment and establishment of vegetation on the sand bars by artificial disturbance of the river, such as damming, can create an unique habitat of backmarsh in the sandy river, as shown in the case of Gudam Wetland, and may increase the biodiversity as compared with relatively monotonous sand bars. Last, the premise in this study that decrease in flood discharge due to upstream dams and decrease in bed shear stress can induce vegetation recruitment on the naked sand bars in the river has been verified with the analyses of the distribution of dimensionless bed shear stress along the selected cross section in each subreach.

Dataset of Long-term Investigation on Change in Hydrology, Channel Morphology, Landscape and Vegetation Along the Naeseong Stream (II) (내성천의 수문, 하도 형태, 경관 및 식생 특성에 관한 장기모니터링 자료 (II))

  • Lee, Chanjoo;Kim, Dong Gu;Hwang, Seung-Yong;Kim, Yongjeon;Jeong, Sangjun;Kim, Sinae;Cho, Hyeongjin
    • Ecology and Resilient Infrastructure
    • /
    • v.6 no.1
    • /
    • pp.34-48
    • /
    • 2019
  • Naeseong Stream is a natural sand-bed river that flows through mountainous and cultivated area in northern part of Gyeongbuk province. It had maintained its inherent landscape characterized by white sandbars before 2010s. However, since then changes occurred, which include construction of Yeongju Dam and the extensive vegetation development around 2015. In this study, long-term monitoring was carried out on Naeseong Stream to analyze these changes objectively. This paper aims to provide a dataset of the investigation on channel morphology and vegetation for the period 2012-2018. Methods of investigation include drone/terrestrial photography, LiDAR aerial survey and on-site fieldwork. The main findings are as follows. Vegetation development in the channel of Naeseong Stream began around 1987. Before 2013 it occurred along the downstream reach and since then in the entire reach. Some of the sites where riverbed is covered with vegetation during 2014~2015 were rejuvenated to bare bars due to the floods afterwards, but woody vegetation was established in many sites. Bed changes occurred due to deposition of sediment on the vegetated surfaces. Though Naeseong Stream has maintained its substantial sand-bed characteristics, there has been a slight tendency in bed material coarsening. Riverbed degradation at the thalweg was observed in the surveyed cross sections. Considering all the results together with the hydrological characteristics mentioned in the precedent paper (I), it is thought that the change in vegetation and landscape along Naeseong Stream was mainly due to decrease of flow. The effect of Yeongju Dam on the change of the riverbed degradation was briefly discussed as well.

Two - Dimensional analysis in Dam Downstream due Spill Condition (방류조건에 따른 댐 하류부의 2차원 수치해석)

  • Lee, Jong-Hyeong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.2
    • /
    • pp.911-918
    • /
    • 2013
  • Two - dimensional numerical analysis model(RMA2), is mainly applied to analyze the flood water levels, velocities and change of river bed at the downstream of Dam. The analysis result be able to influence to Gwangchon bridge from Juam dam, freeboard be insufficient 0.7m to left bank 300m section of dam downstream. Bank overflow is appear to all section of Bosung river to PMF spill condition. Inundated district is appear to river confluence to 200year frequency and is expand to bank overflow to PMF spill condition. Velocity in the channel was simulated high velocity to the bridge and narrow reach and appear to riverbed degradation.

Performance Evaluation of Recycled Aggregate Concrete Block Reinforced with GFRP (GFRP로 보강된 순환골재콘크리트 블록의 성능평가)

  • Kim, Yongjae;Lee, Hyeongi;Park, Cheolwoo;Sim, Jongsung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.12
    • /
    • pp.6565-6574
    • /
    • 2013
  • Precast concrete blocks are used mainly for score protection, slope protection and riverbed structure protection, etc. Because these concrete blocks are exposed to water or wetting environments, the steel rebar used as reinforcements in concrete blocks can corrode easily. Corrosion of the steel rebar tends to reduce the performance and service life of the concrete blocks. In this study, Glass Fiber Reinforced Polymer(GFRP) rebar, which does not corrode, was applied instead of a steel rebar to prevent performance degradation of the blocks. Recycled concrete aggregate and high early strength cement(HESC) were used in the concrete mix for field applicability. The experiment results showed that the workability and form removal strength of the recycled aggregate concrete using HESC showed comparable results to normal concrete and the compressive strength at 28 days increased by about 18% compared to normal concrete. The load resistance capacity of the recycled aggregate concrete blocks reinforced with a GFRP rebar increased by approximately 10~30% compared to common concrete block.

Effects of Reduced Sediment Dynamics on Fluvial Channel Geomorphology in the Jiseok River (유사계의 역동성 감소가 지석천 충적하도의 지형변화에 미치는 영향)

  • Ock, Gi-Young;Lee, Sam-Hee
    • Journal of Korea Water Resources Association
    • /
    • v.45 no.5
    • /
    • pp.445-454
    • /
    • 2012
  • The present study aims to investigate the long-term channel morphological changes derived from channelization, embankment and levee construction works in unregulated fluvial channel of the Jiseock River. Analyses of aerial photographs taken past (Year 1966) and recent (Year 2002) showed the temporally remarkable changes in channel planform such as channel shape, bar migration, vegetation encroachment in bar. During the period, the natural single threading changed into braided types together with decreasing sinuosity by 9.2%, increasing vegetation occupied bar ranged 97% of total bars area. Because such channel morphological changes are closely similar to those in dam downstream channels, we assume that both/either flow regime alteration and/or sediment transport discontinuity may be critical for the fixed channel and spread of vegetated bars even in unregulated river without dam reservoir upstream. We found more reduced frequency and magnitude of flooding water level comparing with past, but no significant alteration of inter annual water level variation. Bed material has been coarsened by 4~5 times and the riverbed has been degraded in overall channel but aggraded locally in conjunction reach of tributaries. The results indicates that reduced sediment dynamics in fluvial channel which derived by bed material coarsening, river bed degradation and unbalanced sediment transport capacity between tributary and mainstem can be a causal factor to trigger channel morphological changes even in unregulated rivers.