• 제목/요약/키워드: river facility construction

검색결과 47건 처리시간 0.019초

ACCURACY IMPROVEMENT OF AN APPROXIMATE COST ESTIMATING MODEL FOR RIVER FACILITY CONSTRUCTION

  • Siwook Lee;Sungkwon Woo;Jeongyoon Lee;Inwook Choi
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1201-1208
    • /
    • 2009
  • A making a decision of construction cost has important meaning and function for both contractor and owner in construction projects. Especially, it should be premised that estimating the construction cost in efficient and rational way in public construction, which is invested by government funds, for efficient execution of the budget and investment as a side of government. The systematic methodology for estimating construction cost approximately of a river facility construction project has not yet been established because of its unique characteristics including its relatively small project size in terms of cost. On this study, It collect and analyze a river facility construction historical cost data for develop an approximate cost estimating model for river applied by typical embankment section method and rate application of the others activity type. And it verify suitability of model through a that result of application of real river facility construction statement at developed model. By this study, it is expected to reasonable and systematic estimating construction cost through application of developed model.

  • PDF

하천시설물 공사의 기획단계 개략공사비 산정체계 개발 (Development of an Approximate Cost Estimating Framework for River Facility Construction at Planning Stage)

  • 신정민;우성권;이시욱;김옥기
    • 대한토목학회논문집
    • /
    • 제28권3D호
    • /
    • pp.371-381
    • /
    • 2008
  • 국내 하천시설물 건설공사는 도로 등의 다른 토목시설공사에 비해서 사업의 금액규모가 상대적으로 작다는 등의 특성으로 인해 사업의 기획 및 계획단계에서의 개략적인 공사비용을 예측하는 기준 단가가 정립되어 있지 않으며, 시설물의 특성을 고려한 합리적이고 체계적인 견적 방법론 또한 존재하지 않는다는 문제점을 가지고 있다. 본 연구는 하천시설물 건설공사의 실적자료를 수집하고 분석하여, 4단계로 이루어진 하천 제방공사 실적정보 구성 체계를 제시하고, 공사비에 영향을 끼치는 인자들을 주요 공종별로 도출하여, 하천시설물 공사의 기획단계에서 적정한 개략공사비를 산정하는 체계적인 방법론을 제시한다.

BIM 기반의 하천 유지관리를 위한 하천분야 BIM 표준분류체계 적용방안 (A Method to Apply the BIM Standard Classification System in the River Field for BIM-based River Maintenance)

  • 남정용;주재하;홍정일
    • 한국전산구조공학회논문집
    • /
    • 제36권3호
    • /
    • pp.147-154
    • /
    • 2023
  • 하천시설물은 정보의 관리주체가 국가하천과 지방하천 등에 따라 달라서 통합되어 관리되지 못하고 있는 점, 설계 및 시공 단계의 정보화 축적이 미흡하여 시설물 정보의 망실이 우려되는 점 등 하천분야로 BIM 도입을 하기 위해서는 해결해야 할 과제들이 산재해 있다. 또한, 이로 인해 유지운영단계에서의 시설물 정보 활용 수준 역시 상당히 미흡한 편이다. 따라서, 하천시설물의 효과적인 유지운영을 위해서는 표준분류체계에 따라 시설물 정보를 정리함으로 데이터의 일관성을 확보하고 효율성을 증대시킬 필요가 있다. 본 연구에서는 이러한 하천분야의 시설물 특성을 고려하여 하천분야의 BIM 정보모델 도입과 3차원 기반의 하천시설의 효율적인 유지운영 전환을 위한 BIM 표준분류체계를 적용하는 방안을 제시한다.

하천제방의 합리적인 설계 방안 (A Study of alternative to rational design of Levee)

  • 김진만;최봉혁
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2010년도 추계 학술발표회
    • /
    • pp.119-123
    • /
    • 2010
  • Causes of the levee collapse are directly or indirectly associated with geotechnical engineering as well as hydraulics. In this paper, literature survey and analysis were conducted to present the alternatives in geotechnical engineering issues for rational levee design. The alternatives include the reasonable river-bed soil utilization and precautions of numerical analysis and slope stability analysis, disruption type and improvement method of drainage facility.

  • PDF

전과정 평가에 의한 하천 호안 공법의 환경성 평가에 관한 연구 (Study on the Environmental Quality Assessment of River Revetment Technique by Life-Cycle-Assessment)

  • 김국일;안원식
    • 한국수자원학회논문집
    • /
    • 제40권6호
    • /
    • pp.485-494
    • /
    • 2007
  • 본 연구는 자연형 하천 설계시 하천의 친환경적 설계를 고려하고자 전과정평가(Life-Cycle-Assessment, 이하 LCA)에 의해 하천호안에 사용되는 공법과 그 공법에 사용되는 재료의 환경성을 평가하였다. 자연형 하천에 적용되는 에너지 및 기초자재의 환경성을 검토한 결과 단위중량당 가솔린, 디젤, 시멘트, 원주목 순으로 환경영향이 발생하는 것으로 나타났고, 단위면적에 적용된 호안공법의 환경성을 비교한 결과 돌망태공법, 옹벽공법, 방틀공법 순으로 환경부하가 큰 것으로 분석되었다. 또한 돌망태공법의 전기아연도금철선의 소재를 개선하였을 경우 저감되는 환경영향을 분석하였다. 본 연구에 적용된 대상유역은 섬진강의 지류인 지방하천인 경천의 하천정비구역 $0.3km^2$로 선정하였으며, 인공시설물 예상 수명 30년을 기준으로 연구를 수행하였다. 시범유역의 호안공법의 환경성을 평가한 결과 돌망태를 적용한 공법이 환경부하가 가장 크게 나타났으며, 이후 레미콘을 사용한 공법 순으로 분석되었다. 자연형 하천 설계시 적용되는 호안공법의 선정시 본 연구의 결과를 이용할 수 있을 것으로 판단되며 이에 따라 환경친화적 자연형 하천 설계에 이바지 할 것으로 기대된다.

LCA를 적용한 하천환경영향평가 방법 (A Method of River Environmental Impact Assessment using LCA)

  • 김성준;김명희;전용태;신선미;최용승;원찬희
    • 환경영향평가
    • /
    • 제21권1호
    • /
    • pp.93-104
    • /
    • 2012
  • In this research LCA methodology was adapted and analyzed in quantifying estimation of estuarine environment. The analysed objects of estuarine environment were construction methods, facility, and input material into water, and estuarine ecosystem. In this research the function of LCA of estuarine environment was river with the view of controling water, utilizing water, and hydrophilic function. According to the result of research, environmental damage indicator of facility was decreased 346 Pt from 453 Pt at pre-maintenance to 107 pt at post-maintenance. Among raw and subsidiary materials, remicon, stone-netting bag, and pebbles were showing heavy environmental load in the order. Evironmental impact of input material into water system was analyzed from 1,827 Pt environmental load before construction to 1,080 Pt of post-maintenance, and damage indicator was improved at 747 Pt. Water quality was improved from 1,827 Pt (before construction) to 1,080 Pt(after construction), and ecosystem was improved after maintenance. Environmental indicator in ecosystem was analyzed 427 Pt(before construction) to 348 Pt(after construction), and damage indicator of Sumnjingang riverine system was improved as much as 79 Pt. In the conclusion, estuarine environmental monitoring through LCA in the area of facility, input material into water and ecosystem showed that close-to-nature stream was 1,172 Pt better than artificial stream in environmental aspects.

친환경 소하천의 수리적 안정성 분석에 관한 연구 (A Study on Hydraulic Stable Analysis of The Natural Small River)

  • 김태경;이경훈;선병진;최천호
    • 환경영향평가
    • /
    • 제16권3호
    • /
    • pp.187-194
    • /
    • 2007
  • It started road constructions around river in 1990s. These maintenances concentrate on city river. Because river lives no living things and men don't come near there. But in spite of these river environment go to rack, river maintenances still keep on using preexistence method since 1990s. Only a part of city river environment maintenances consider environmental ability of passive river, river maintenance of a purpose of flood control still don't consider in the concrete. Because propulsion device that consider environment ability of passive river and possible application techniques don't complete. In accordance, A natural river maintenance needs absolutly a series of river projects. Because a natural river maintenance prevents a damage of environment ability. This study is to assume the flood really happened and to carry out the flood damage simulation needed in overflow simulation about the inundated zone. Also, This study examine unstable part about the hydraulic characteristic as velocities, stream power, shear, hydraulic depth, flow area in basin. And this study applied the HEC-RAS(river analysis system) model to predict flood overflow in youngsan river basin. Project flood is used the return period 100 year and inputed data that was calculated in intensity figures of illumination.

건설기술진흥법 안전관리계획서의 실행방안에 관한 연구 (A Study on the Implementation of the Safety Management Plan in the Construction Technology Promotion Act)

  • 신성수
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 추계 학술논문 발표대회
    • /
    • pp.104-105
    • /
    • 2018
  • The purpose of the safety management plan under the Construction Technology Promotion Act is to improve the quality and safety of construction engineers during construction work. To prevent a collapse accident of a facility after completion by preventing a collapse accident of gravel, an earthwork, a river structure or the like. In order to prevent collapses, the purpose of the project is to study measures to improve the ability of construction technology promotion law to ensure the quality of construction materials at the time of construction work.

  • PDF

하천시설 통합 유지운영을 위한 정보 현행화 및 프레임워크 구축방향 연구 (A Study of Information Update and Framework for Intergrated Maintenance and Operation of River Facilities)

  • 남정용;김민정;조찬원
    • 한국산학기술학회논문지
    • /
    • 제18권12호
    • /
    • pp.140-149
    • /
    • 2017
  • 최근 기후변화에 따른 다목적 하천기능관리가 요구되고 있지만, 국내 하천분야는 국가하천과 지방하천의 관리주체가 분리되어 하천정보를 통합적으로 운영하지 못하고 있다. 특히 설계 및 건설 준공도서를 재활용한 하천정보의 작성과 갱신이 미흡하다. 또한 하천기본정보는 GIS기반의 RIMGIS 시스템의 의존도가 큰 반면, 하천기본계획 성과물에 의한 공간정보 구축으로 하천정보의 신뢰성이 저하되고 있는 현실이다. 본 연구에서는 하천분야에서 다루는 정보의 활용범위가 다양하나 하천시설물의 유지와 운영을 위한 정보체계를 대상으로 하며 현행 하천시설물 유지운영 관련 정보체계의 현황을 조사 및 분석하여 현안 문제점을 도출하고, 시범적용 사례 검증을 통해 실무정보적인 관점에서 최적의 해결방안을 제시하였다. 그 결과로 상시적으로 신뢰할 수 있는 하천 시설물 유지관리 정보체계를 구축하고 정보통합운영 방안을 검토하였다. 본 연구는 앞으로 하천시설 통합 유지운영을 위한 정보 현행화와 기술적, 제도적인 절차를 개선하는데 활용될 수 있다. 또한 하천분야의 정보구축 개선을 위한 정보프레임워크 구축 방향제시를 통하여 앞으로 타 분야와 정보격차를 해소 할 뿐만 아니라 BIM정보체계를 도입하는데 도움이 될 것이다.

경상도 남부지역 연해 군현과 수군영진의 선소(船所)에 관한 연구 (A Study on the Shipyard of the Costal Counties and the Naval Castle in the Southern Gyeongsang-do)

  • 권순강;이호열
    • 건축역사연구
    • /
    • 제28권2호
    • /
    • pp.7-18
    • /
    • 2019
  • The Chosun Dynasty established and implemented measures to prevent Japanese invasion into the southern coast. To this end, the number of naval vessels and the number of ships were increased, and a shipyard(船所) was constructed to protect the safety of the vessels. The shipyard is a port facility where military vessels are anchored and repaired, as well as public facilities that are needed for military training on public and land, as well as facilities for storing supplies and equipment needed for ships on land and defense at the port entrance. Despite being such an important facility for national defense, Shipyard has not been noticed. Studies have shown that the position of shipyard is divided into the riverside type and the riverbank type, which is due to the topographical features of Korea. The repair cycle of naval vessels, the carrying out of Yeonhun(prevent the water from decaying the part of the ship, a raw tree was burned to smoke) and the place of sea training also affected the construction of the Gul River(掘江). The space structure of shipyard is divided into port entry facilities for monitoring and controlling at the entrance to the harbor, border facilities for folding and repairing military vessels, and land facilities for holding land exercises and administrative work of military vessels and military equipment.