• Title/Summary/Keyword: risk rating process

Search Result 33, Processing Time 0.025 seconds

A Development of Representative Condition Evaluation Standard for LNG Storage Tank Structures (LNG 저장탱크 구조물의 종합적 상태평가기준 개발)

  • Kim, Jung-Hoon;Jo, Young-Do
    • Journal of the Korean Institute of Gas
    • /
    • v.22 no.6
    • /
    • pp.44-51
    • /
    • 2018
  • As the LNG storage tank is aged, if there is a crack in the outer wall concrete or corrosion of the reinforcing steel, there is a risk of a major accident such as collapse of the structure depending on the type and degree of damage. Since 2014, LNG storage tanks have undergone precise safety diagnosis and safety inspection has been carried out. The condition evaluation criteria for each component have been revised and applied in January 2016. The condition evaluation standard is to evaluate the status of storage tanks based on the appearance survey and material test results of LNG storage tanks and it is important for maintenance. In addition, the representative condition evaluation standard that shows the comprehensive state of each LNG storage tank is important in maintenance, but the related standard for LNG storage tank outer concrete is not available in Korea and abroad, and development of the condition evaluation standard is necessary. In this paper, we examined the structural characteristics of LNG storage tanks, analyzed the status of the condition evaluation criteria for each member, and developed a comprehensive status rating system by weighting the members. We used the AHP(Analytic Hierarchy Process) technique and developed a representative conditon evaluation criteria through surveys of professional organizations.

The Effect of Stellate Ganglion Block on Breast Cancer-Related Infectious Lymphedema (유방암 감염성 림프부종 환자에서 성상신경절 블록이 미치는 영향)

  • Lee, Youn Young;Park, Hahck Soo;Lee, Yeon Sil;Yoo, Seung Hee;Lee, Heeseung;Kim, Won Joong
    • Journal of Hospice and Palliative Care
    • /
    • v.21 no.4
    • /
    • pp.158-162
    • /
    • 2018
  • Breast cancer related lymphedema (BCRL) is one of the most intractable complications after surgery. Patients suffer from physical impairment, as well as psychological depression. Moreover, a recent study revealed that cellulitis significantly increased the risk of BCRL, and cellulitis has been suggested as a risk factor of BCRL development. We describe a patient treated with stellate ganglion blocks (SGBs) without steroid for relief of symptoms and reduction of the arm circumference of breast cancer-related infectious lymphedema in a month. We measured the arm circumference at four locations; 10 cm and 5 cm above and below the elbow crease, numeric rating scale (NRS) score, lymphedema and breast cancer questionnaire (LBCQ) score on every visit to the pain clinic. A serial decrease of the arm circumference and pain score were observed after second injection. In the middle of the process, cellulitis recurred, we performed successive SGBs to treat infectious lymphedema. The patient was satisfied with the relieved pain and swelling, especially with improved shoulder range of motion as it contributes to better quality of life. This case describes the effects of SGB for infectious BCRL patients. SGB could be an alternative or ancillary treatment for infectious BCRL patients.

The Application of Fuzzy Logic to Assess the Performance of Participants and Components of Building Information Modeling

  • Wang, Bohan;Yang, Jin;Tan, Adrian;Tan, Fabian Hadipriono;Parke, Michael
    • Journal of Construction Engineering and Project Management
    • /
    • v.8 no.4
    • /
    • pp.1-24
    • /
    • 2018
  • In the last decade, the use of Building Information Modeling (BIM) as a new technology has been applied with traditional Computer-aided design implementations in an increasing number of architecture, engineering, and construction projects and applications. Its employment alongside construction management, can be a valuable tool in helping move these activities and projects forward in a more efficient and time-effective manner. The traditional stakeholders, i.e., Owner, A/E and the Contractor are involved in this BIM system that is used in almost every activity of construction projects, such as design, cost estimate and scheduling. This article extracts major features of the application of BIM from perspective of participating BIM components, along with the different phrases, and applies to them a logistic analysis using a fuzzy performance tree, quantifying these phrases to judge the effectiveness of the BIM techniques employed. That is to say, these fuzzy performance trees with fuzzy logic concepts can properly translate the linguistic rating into numeric expressions, and are thus employed in evaluating the influence of BIM applications as a mathematical process. The rotational fuzzy models are used to represent the membership functions of the performance values and their corresponding weights. Illustrations of the use of this fuzzy BIM performance tree are presented in the study for the uninitiated users. The results of these processes are an evaluation of BIM project performance as highly positive. The quantification of the performance ratings for the individual factors is a significant contributor to this assessment, capable of parsing vernacular language into numerical data for a more accurate and precise use in performance analysis. It is hoped that fuzzy performance trees and fuzzy set analysis can be used as a tool for the quality and risk analysis for other construction techniques in the future. Baldwin's rotational models are used to represent the membership functions of the fuzzy sets. Three scenarios are presented using fuzzy MEAN, AND and OR gates from the lowest to intermediate levels of the tree, and fuzzy SUM gate to relate the intermediate level to the top component of the tree, i.e., BIM application final performance. The use of fuzzy MEAN for lower levels and fuzzy SUM gates to reach the top level suggests the most realistic and accurate results. The methodology (fuzzy performance tree) described in this paper is appropriate to implement in today's construction industry when limited objective data is presented and it is heavily relied on experts' subjective judgment.