• Title/Summary/Keyword: risk process

Search Result 2,891, Processing Time 0.031 seconds

Improving Development Process for Product Safety

  • Jung, Won
    • Proceedings of the Korean Reliability Society Conference
    • /
    • 2004.07a
    • /
    • pp.262-267
    • /
    • 2004
  • In designing and evaluating a new product, the company needs to give thought to the entire spectrum of produceability, usability, and ultimate reliability, as well as safety of users. For each design review(DR) stage, a formal, systematic, documented review and evaluation of a product design is conducted to assure that the product is safe and reliable, that costs and materials have been optimized, and that the design complies with its specifications and requirements. This paper presents how to improve development process for product's safety and reliability. The process requires gathering the appropriate information, determining the limits of the product, estimating risk associated with the task-hazard combinations, and reducing risk according to a prioritized procedure.

  • PDF

Risk Allocation of Private Port Development with Hierarchical Fuzzy Process

  • Seong, Yu-Chang;Youn, Myung-Ou
    • Journal of Navigation and Port Research
    • /
    • v.31 no.4
    • /
    • pp.317-323
    • /
    • 2007
  • As economic trade between Korea and China has been encouraged with the rapid growth of Chinese economy and port competition in Northeast Asia, Korean government is trying to promote development and consolidation of ports to cope with the lack of facilities. Thus, many projects for port development have been propelled including the enactment the 'Private investment promotion law for social overhead capital 1994.' However, there are still some unsettled issues since considerable part of risk is still allocated to the Government when it has to support the private businesses in these port investments whenever unexpected problems arise. Allocation of risk among the participants - in this case especially - is a very subtle issue, however, it was revealed that not many precedent researches were done on the subject. In my previous research, I classified and analyzed 4 principle risks i.e, construction, management, financial and social risk. This research investigates the reasonable allocation of the risks among the participants using the Hierarchial Fuzzy Process. In the result of analysis, responsibility of private party is the most important and it must put the responsibility before Government' roll concerned. Also, this research displayed and proposed the direction of management method on port development in a view of minimizing risk and maximizing initiative of a private party.

Perceived Risk and Purchase Obstruction Factors When Purchasing Clothing Online (인터넷 쇼핑몰에서 구매 경험과 소비자 특성이 의류 제품 구매 시 지각하는 위험과 구매 저해에 미치는 영향)

  • Kim, Ji-Yeon;Moon, Ji-Young;Park, Jung-Kwon;Choi, Eun-Chung;Lee, Ji-Yeon
    • The Research Journal of the Costume Culture
    • /
    • v.18 no.1
    • /
    • pp.118-132
    • /
    • 2010
  • The purpose of this study is to understand factors of risk perception and purchase obstruction by consumer characteristics and purchase experience of clothing in online. The collection of the research materials was progressed by online and offline. Out of 374 usable questionnaires used for examining this study, 278 questionnaires were collected from offline and 107 questionnaires were collected from online. Frequency analysis, factor analysis, reliability analysis, t-test, One-way ANOVA and multiple regression analysis using SPSS WIN 12.0 were conducted. Three factors of perceived risk were extracted: harmonic/image, quality/shopping process, payments. Based on these dimensions, ANOVA was conducted. The results indicated that the more purchasing experience people had, the less the extent of perceived risk they got, and quality/shopping process risk mostly among them. As the factors which obstruct purchasing decision, a security obstruction, a reliability obstruction, a convenient obstruction and an information insufficient obstruction are extracted. Also, the factors have got the result of same aspects as the perceived risk recognized by the Internet shopping experience. Meaningful differences between groups appear at security obstruction, reliability obstruction, and convenient obstruction. Perceived risk almost influenced on purchase obstruction when purchasing clothes in Internet shopping mall. When consumers perceiving harmony/image risk highly make decisions, they usually hesitate or abandon due to reliability obstruction, convenient obstruction. All the factors: including security obstruction, reliability obstruction, convenient obstruction and information insufficient obstruction made consumers perceiving quality/shopping process risk highly obstruct purchase decision.

A Study on the Importance of Risk Factors for Effective Risk Management in the Pre-Project Planning Phase of the Development Projects (국내개발사업 사전기획단계에서의 효율적 리스크 관리를 위한 리스크 인자 중요도에 관한 연구)

  • Shin Kyu-Ho;Kim Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.2 s.10
    • /
    • pp.75-86
    • /
    • 2002
  • The construction market is diversely changing because social environmental factors are rapidly transforming. Therefore, Construction projects are becoming complex and diverse. Furthermore, the risk being inherent in construction projects are increasing, and now people are considering about the risk management of construction projects in successfully handling the risk factor. The purpose of this study is first to comprehend the preparation of basic references for objective and systematic identification, categorization, and analysis of risk. Secondly it is to find the principle elements within the risk factors identified and categorized around planning process. Finally it is to manage objectively on the planning process, which forms a lot of uncertainty, in order to accentuate the importance about the risk of pre-planning process stage

A Study on Perception of Risk Factor in Supply Chain - Focus on Distribution Center - (공급사슬에서 존재하는 위험(Risk)요소의 인지에 관한 연구 - 물류센터를 중심으로 -)

  • Shin, Chang-Hoon;Jeoung, Dong-Hun;Choi, Min-Seung
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2005.10a
    • /
    • pp.269-274
    • /
    • 2005
  • This study gathered the factor of supply chain risk through literature review, and measured the importance of risk factors which have been recognized by domestic companies. This study has purposes and necessities as follows. First, supply risk factors were classified and explored through positive studies about supply chain risk. Most of previous studies helps grasping the meaning of supply chain risk but limited in conceptual side. Second, this study used AHP(Analytic Hierarchy Process) method which makes decision-making problem classified, simplicated and systematized to evaluate the importance of supply-chain risk recognized by the companies. Finally, this study suggests registration-point in companies's efficient supply activity would be great by measuring the importance of supply-chain through AHP(Analytic Hierarchy Process).

  • PDF

Relationship between Regulatory Default Values and Conservatism (규제기준치와 Conservatism의 관계)

  • 장승철;김길유
    • Journal of the Korean Society of Safety
    • /
    • v.15 no.1
    • /
    • pp.161-166
    • /
    • 2000
  • Regulators often specify default values that are considered acceptable for use in risk analyses as input to regulatory decisions. Because both performing and validating a detailed risk analysis of a complex system are costly and time-consuming undertakings, the use of default values can greatly facilitate the process of performing a risk analysis in the first place as well as the process of reviewing and verifying the risk analysis. It may also ensure more uniform in quality of risk analyses. However, different regulatory agencies differ in their approaches to the use of default values, and the implications of these differences are not yet widely understood. Moreover, large heterogeneity among licensees makes it difficult to set suitable defaults. This paper focuses on the effect of default values on estimates of risk. Some insights on the effects of different levels of conservatism in setting defaults will be provided. The results can help decision makers evaluate the levels of safety likely to result from their regulatory policies.

  • PDF

Trend Analysis for Risk Management of Construction Project using P.M.I. Techniques (P.M.I. 기법을 이용한 국내 건설업체 리스크관리 실태 분석)

  • 정병화;정영식
    • Journal of the Korean Society of Safety
    • /
    • v.16 no.4
    • /
    • pp.115-122
    • /
    • 2001
  • Recently construction enterprises involves more occurred with increase of size and complxity of construction works. Risk management is one of the key project management process. Numerous tools are available to support the various phases of the risk management process. We present the results of a study designed to identify the tools that are most widely used and those that are associated with successful project management in general, and in effective project risk management in particular. The study is based on a questionnaire administered to a sample of project managers from construction enterprises. The response data was analyzed in order to find which tools are mon likely to be used in the those organizations that report better project management performance and in those that value the contribution of risk management processes.

  • PDF

A rolling analysis on the prediction of value at risk with multivariate GARCH and copula

  • Bai, Yang;Dang, Yibo;Park, Cheolwoo;Lee, Taewook
    • Communications for Statistical Applications and Methods
    • /
    • v.25 no.6
    • /
    • pp.605-618
    • /
    • 2018
  • Risk management has been a crucial part of the daily operations of the financial industry over the past two decades. Value at Risk (VaR), a quantitative measure introduced by JP Morgan in 1995, is the most popular and simplest quantitative measure of risk. VaR has been widely applied to the risk evaluation over all types of financial activities, including portfolio management and asset allocation. This paper uses the implementations of multivariate GARCH models and copula methods to illustrate the performance of a one-day-ahead VaR prediction modeling process for high-dimensional portfolios. Many factors, such as the interaction among included assets, are included in the modeling process. Additionally, empirical data analyses and backtesting results are demonstrated through a rolling analysis, which help capture the instability of parameter estimates. We find that our way of modeling is relatively robust and flexible.

PROGRAMMATIC AND PROJECT-LEVEL RISKS: ESTABLISHING A RISK MANAGEMENT PROCESS FOR MIDDLE EAST PLANT PROJECTS

  • G. Edward Gibson Jr.;John Walewski;SangBum Kim;Clayton Ingam;Hamid Hajian
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1000-1014
    • /
    • 2009
  • Research sponsored by the Korean Government investigated the establishment of a risk management process by Korean contractors involved with plant projects in the Middle East. This research effort builds upon the work completed by the Construction Industry Institute (CII), called the International Project Risk Assessment (IPRA) tool and method, and also explored how CII's Project Definition Rating Index (PDRI) could be incorporated to improve project planning by addressing risks and scope development issues. Specific findings and recommendations were developed including the creation of the Contractor Critical Areas of Concern (CCAC) risk screening tool for Korean contractors pursuing Middle East oil and gas projects.

  • PDF

Development of Risk Breakdown Structure of Nuclear Power Plant Decommissioning Project: Focusing on Structural Damage / Work Process Risks (원전 차폐 콘크리트 구조물 제염해체공사 리스크 분류체계 구축: 구조적 / 작업 리스크를 중심으로)

  • Kim, Byeol;Lee, Joo-Sung;Ahn, Yong-Han
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.22 no.3
    • /
    • pp.38-45
    • /
    • 2018
  • The purpose of this study is to deduct the structural damage / work process risks factors which can be occurred during the decommissioning in the NPP containment concrete structure. To achieve these purpose, risk profile specified in the construction industry is analyzed, and the work process of NPP decommissioning and the construction project were matched based on the similarity of each works. Accordingly, human and physical risk factors are classified. Finally, the risk associated with the building structure and work process was classified as per their process activities, and risk typology explaining the disaster which put the structure, equipments, machine and workers in serious danger was developed.