• Title/Summary/Keyword: risk priority

Search Result 485, Processing Time 0.03 seconds

Assessment of Chemical Risks in Moroccan Medical Biology Laboratories in Accordance with the CLP Regulation

  • Mourry, Ghita E.;Alami, Rachid;Elyadini, Adil;Hajjaji, Souad El;kabba, Saad El;Zouhdi, Mimoun
    • Safety and Health at Work
    • /
    • v.11 no.2
    • /
    • pp.193-198
    • /
    • 2020
  • Background: Medical laboratory workers are frequently exposed to a wide range of chemicals. This exposure can have adverse effects on their health. Furthermore, a knowledge lack of the chemical risk increases the likelihood of exposure. The chemical risk assessment reduces the risk of exposure to hazardous chemicals and therefore, guarantees health and safety of the workers. Method: The chemical risk assessment was conducted using a modified INRS method, according to the new CLP Regulation, of 11 unit laboratories in a Moroccan medical laboratory. Observation of each workstation and analysis of safety data sheets are key tools in this study. Results: A total of 144 substances and reagents that could affect the health of the analytical technicians were identified. Among these products, 17% are concerned by the low priority risk score, with 55% concerned by the average priority risk score and 28% concerned by the high priority risk score. This study also enabled to better identify the chemical agents that have restrictive occupational exposure limit value and controls were conducted to this effect. On the basis of the results obtained, several corrective and preventive measures have been proposed and implemented. Conclusion: Risk assessment is essential to ensure the health and safety of workers and to meet regulatory requirements. It enables to identify all the risky manipulations and to adopt appropriate preventive measures. However, it is not a one-time activity but it must be continuous in order to master the changes and thus ensure the best safety of all.

Risk Priority Number using FMEA by the Plastic Moulding Machine (사출성형기의 고장모드 영향분석(FMEA)을 활용한 위험 우선순위)

  • Shin, Woonchul;Chae, Jongmin
    • Journal of the Korean Society of Safety
    • /
    • v.30 no.5
    • /
    • pp.108-113
    • /
    • 2015
  • Plastic injection moulding machine is widely used for many industrial field. It is classified into mandatory safety certification machinery in Industrial Safety and Health Act because of its high hazard. In order to prevent industrial accidents by plastic injection moulding machine, it is necessary for designer to identify hazardous factors and assess the failure modes to mitigate them. This study tabulates the failure modes of main parts of plastic injection moulding machine and how their failure has affect on the machine being considered. Failure Mode & Effect Analysis(FMEA) method has been used to assess the hazard on plastic injection moulding machine. Risk and risk priority number(RPN) has been calculated in order to estimate the hazard of failures using severity, probability and detection. Accidents caused by plastic injection moulding machine is compared with the RPN which was estimated by main regions such as injection unit, clamping unit, hydraulic and system units to find out the most dangerous region. As the results, the order of RPN is injection unit, clamping unit, hydraulic unit and system units. Barrel is the most dangerous part in the plastic injection moulding machine.

Evaluation of Risk Factors in Water Supply Networks using PROMETHEE and ANP (PROMETHEE와 ANP 기법을 활용한 상수도관망의 위험요소 평가)

  • Hong, Sung-Jun;Lee, Yong-Dae;Kim, Sheung-Kown;Kim, Joong-Hoon
    • IE interfaces
    • /
    • v.19 no.2
    • /
    • pp.106-116
    • /
    • 2006
  • In this study, the priority of risk factors in supplying water through water supply pipeline network was evaluated by PROMETHEE and ANP multi-criteria decision analysis. We chose 'corrosion', 'burst' and 'water pollution' in pipe as major reference criteria and selected eight risk factors to evaluate the priority, and then we compared the results of PROMETHEE with those of ANP. We also analyzed the results of the sensitivity analysis by changing the weights and parameters of preference functions in PROMETHEE. We investigated the possibility of integrating two methods by using the results of ANP as the weights of preference function in PROMETHEE. The priority of risk factors for supplying municipal water which is evaluated by this study may provide basic data to establish a contingency plan for accidents, or to establish the specific emergency response procedures.

Study on Minimum Security Requirement Using Risk Priority Number(SFRPN) for Secure Smart Factory (안전한 스마트공장 구축을 위한 위험우선순위(SFRPN) 기반 최소보안요구사항에 관한 연구)

  • Yi, Byung-gueon;Kim, Dong-won;Noh, Bong-nam
    • Journal of the Korea Institute of Information Security & Cryptology
    • /
    • v.26 no.5
    • /
    • pp.1323-1333
    • /
    • 2016
  • According to spreading of smart devices and development of communication technology, the security issues come to the fore in the modern factory. Especially, the smart facpry should be considered the risk management plan how to identify and evaluate, control the risks. In this paper, we suggest the minimum security requirements applying SFRPN(Smart Factory Risk Priority Number) model to domestic smart factory on the basis of the results inspecting factories.

Risk Priority Analysis for Preventing Electrical Fires in Food Manufacturing Electrical Facilities (식료품제조업 전기설비의 전기화재방지를 위한 위험우선순위 분석)

  • Seung Ku Lee;Doo Hyun Kim;Sung Chul Kim
    • Journal of the Korean Society of Safety
    • /
    • v.39 no.1
    • /
    • pp.16-26
    • /
    • 2024
  • This study aims to introduce a method for risk assessment analysis aimed at preventing electrical fires within the manufacturing industry. Initially, we provided a functional block diagram illustrating the electrical equipment employed in various processes within a food manufacturing company in Chungcheongbuk-do. Subsequently, we categorized the components of each machine outlined in the functional block diagram and determined the priority of failure for each classified component. Upon implementing the model in the frying process of the food manufacturing company, specific components, including MC, motor, mixer heater, electric wiring, and terminal block, exhibit a risk priority number (RPN) of 40 or higher. This identified an electrical issue within the manufacturing process and environment. Consequently, we propose a methodology to identify latent failure modes that could escalate into fires or systemic issues if not promptly addressed. It is essential to note that while the FMEA presented in this study may not immediately impact food manufacturing, its applicability extends to various workplaces.

Priority Analysis of Project Stage-wise Risk Factors : Focusing on New Product Development Projects in ICT Industry (프로젝트 단계별 리스크 요인들의 우선순위 분석 : ICT(정보통신기술)산업 분야의 신제품 개발 프로젝트를 중심으로)

  • Jang, Heeseok;Choi, Sungyong;Lee, Minho
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.41 no.3
    • /
    • pp.72-82
    • /
    • 2018
  • In this paper, we identify risk factors that are likely to occur during the lifecycle of a new product development (NPD) project from the literatures, and identify the three objectives or three constraints that will ultimately be achieved for project success in the ICT industry : performance (scope/quality), schedule (time), and cost. Firstly, we interviewed the project experts to classify the risk factors according that the final project objectives are changeable based on scope/quality, time and cost budget constraints. Secondly, the survey for pairwise comparisons between the risk factors was asked to the project managers and members who had ever actually participated in the NPD projects of ICT industry to determine the priority ranks on relative importance using AHP (Analytic Hierarchy Process). The risk factors negatively affecting the goals of projects were analyzed by using the AHP respectively in four project stages during the life cycle of the project. The comparison of risk factors within each stage is a different approach unlike the literatures which have covered project's overall risk assessment. There is an advantage that risk management can be effectively performed with priorities according to each stage from the start to the end of the project. In other words, it is necessary to identify what risk factors will occur in each stage, and to have ideas at each stage with the priorities so that they can be mitigated and eliminated before actual occurrence. As a result, risks on scope & quality changes were found to be the most important considerations for initiative stage of NPD projects in the ICT industry, whereas in the final stage, risks on schedule (time) changes were the most important priorities. Among the ICT industry product categories, 'communication and broadcasting devices' and 'IT and communication based devices' generally have a high priority in terms of risks on scope & quality changes when initiating the project. At the closing stage of the project, however, considering that schedule (time) changeable risk is getting higher, these products tend to target at B2B market rather than B2C because the new products must be delivered and launched in time as customer firm required.

Study on Risk Priority for TBM Tunnel Collapse based on Bayes Theorem through Case Study (사례분석을 통한 베이즈 정리 기반 TBM 터널 붕괴 리스크 우선순위 도출 연구)

  • Kwon, Kibeom;Kang, Minkyu;Hwang, Byeonghyun;Choi, Hangseok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.6
    • /
    • pp.785-791
    • /
    • 2023
  • Risk management is essential for preventing accidents arising from uncertainties in TBM tunnel projects, especially concerning managing the risk of TBM tunnel collapse, which can cause extensive damage from the tunnel face to the ground surface. In addition, prioritizing risks is necessary to allocate resources efficiently within time and cost constraints. Therefore, this study aimed to establish a TBM risk database through case studies of TBM accidents and determine a risk priority for TBM tunnel collapse using the Bayes theorem. The database consisted of 87 cases, dealing with three accidents and five geological sources. Applying the Bayes theorem to the database, it was found that fault zones and weak ground significantly increased the probability of tunnel collapse, while the other sources showed low correlations with collapse. Therefore, the risk priority for TBM tunnel collapse, considering geological sources, is as follows: 1) Fault zone, 2) Weak ground, 3) Mixed ground, 4) High in-situ stress, and 5) Expansive ground. In practice, the derived risk priority can serve as a valuable reference for risk management, enhancing the safety and efficiency of TBM construction. It provides guidance for developing appropriate countermeasure plans and allocating resources effectively to mitigate the risk of TBM tunnel collapse.

Risk Priority and Allocation of Private Investment in Port Development

  • Seong, Yu-Chang;Youn, Myung-Ou;Keum, Jong-Soo;Kinzo, Inoue
    • Journal of Navigation and Port Research
    • /
    • v.30 no.7
    • /
    • pp.599-605
    • /
    • 2006
  • The Port Development has been achieved by the Government because it needs large scale of funds. However, since 1994, the Govenment has been implemeting private investments for constructing and operating the ports and so on. Although the Government had high expectation that it could expedite the expansion of the port facilities, there were many problems in view of construction, management, financial and social environment. This study figure out that most of the important reasons are the uncertainty of risk allocation between private investors and the Government, using with Analytic Hierarchy Process. It is expected that the results of this study will encourage more private investors to participate in port private investments in the future.

Development of Preliminary Assessment Methodology for Priority Listing of Soil and Groundwater Contamination Sources (토양.지하수오염원 관리우선순위 개략평가기법 개발)

  • Jeong, Seung-Woo;Kim, Young-Ju;Kim, Jae-Hoon;Hwang, Sang-Il
    • Journal of Soil and Groundwater Environment
    • /
    • v.16 no.6
    • /
    • pp.106-112
    • /
    • 2011
  • This study developed preliminary assessment methodology for priority listing of soil and groundwater contamination sources, considering source characteristics, local environments and risk receptors. Source characteristics were evaluated by scoring relative risk of contamination sources. Local environments were evaluated by scoring annual rainfall, hydraulic conductivity of aquifer, and annual groundwater use. Risk receptors were evaluated by scoring local population, direct distance to surface water, direct distance to drinking-water wells. Scores of each parameter were allocated by analysing distribution of parameter values obtained from government databases. Distributed scores of source characteristics local environments: risk receptors were 12 : 12 : 12. The preliminary assessment scored 0 to 36 for each soil and groundwater sources. Inventory of soil and groundwater sources consisted of 7 categories. This study applied the preliminary assessment methodology to Manan-Gu, Anyang City, Korea. The number of car repair and washing facility was the largest in the contamination source inventory. Petroleum storage facilities showed the highest assessment score. The preliminary assessment methodology also indicated that Anyang-Dong was the priority section among Anyang-Dong, Suksu-Dong, Bakdal-Dong. This study is the first trial for relative ranking soil and groundwater contamination sources by considering source and local characteristics. Therefore, further researches and revision of the preliminary assessment methodology need to be pursued for various applications.