• 제목/요약/키워드: risk priority

검색결과 485건 처리시간 0.029초

산업안전보건법 상 관리수준 검토를 위한 화학물질 유해성.위험성 평가대상 후보물질 선정에 관한 연구 (A Study on the Priority for the Hazard and Risk Evaluation of Chemicals (HREC) According to the Industrial Safety and Health Act (ISHA))

  • 양정선;임철홍;박상용
    • 한국산업보건학회지
    • /
    • 제22권1호
    • /
    • pp.73-81
    • /
    • 2012
  • Object: The aim of this study is to suggest a list of priority chemicals for the Hazard & Risk Evaluation of Chemicals (HREC) controlled by the Industrial Safety and Health Act (ISHA). Method: Screening assessment was done for 642 chemicals whose exposure threshold limit values were set by the Ministry of Employment and Labor (MOEL). Hazard data were collected from Korea Occupational Safety & Health Agency (KOSHA) and/or other toxicity database. Exposure data were obtained from KOSHA internal database. The hazard and exposure scores of chemicals were listed by order of priority in accordance with GHS classification and exposure index data. Result: From the result of screening risk assessment for 642 chemicals, we extracted a list of 13 priority chemicals for HREC performed by the ISHA. A priority list of 27 chemicals which have carcinogen, mutagen and/or reproductive toxicity but not controlled by the ISHA was suggested for additional evaluation as "chemicals for special management".

서울 대기 중 미세 먼지 노출로 인한 위해도에 근거한 우선 관리 지역 선정 -이론적 사망 위해도 및 손실비용을 근거로- (Selection of Priority Areas Based on Human and Economic Risk from Exposure to Fine Particles in Seoul)

  • 김예신;이용진;신동천
    • Environmental Analysis Health and Toxicology
    • /
    • 제19권1호
    • /
    • pp.49-58
    • /
    • 2004
  • It is important to select a risk based priority area for environmental policy formation and decision-making. We estimated the health risks and associated damage costs from exposure to fine particles and assigned priority areas for twenty -five districts in Seoul. In order to estimate the theoretical mortality incidence of the health risk, baseline risks were estimated from mortality rates in two low level areas of fine particles, Seocho Gu and Cheju city To estimate the damage cost from the risk estimates, we investigated and estimated the willingness to pay (WTP) for specific risk reduction. We assumed two different locations as the reference area, Cheju city as Scenario I and Seocho gu as Scenario II. From the results, the five districts, Kwangjin, Chungnang, Kangbuk, Nowon, and Kangnam, ranked high in the categories of both health risk and economic risk. Damage costs were over twenty billion won in each of these districts. As there are uncertainties in these results, the parameter values such as PM$_{2.5}$ level, dose -response slope factor, baseline risk, exposure population and WTP should be continuously validated and refined.d.

공급사슬 리스크 관리에 관한 우선순위 분석 (Priority Analysis of Supply Chain Risk Management for Business Using AHP)

  • 고지영
    • 무역학회지
    • /
    • 제47권3호
    • /
    • pp.17-35
    • /
    • 2022
  • The Pandemic crisis caused by COVID-19 has raised awareness of the importance of supply chain risk management, such as the control of movement between countries and the simultaneous manufacturing paralysis in the world. Effective risk management within the supply chain of the company is a core competency in the global environment. Therefore, this study quantitatively analyzed the perspective of domestic large corporations and small and medium enterprises (SMEs) by using the hierarchical analysis method (AHP) to identify the factors that should be considered as the priority when establishing supply chain risk management plans for large and small business employees. In order to conduct the study, a survey was conducted on large corporations and small and medium enterprises in Gyeongnam and Busan, and AHP analysis was conducted using Microsoft 365 excel program. In addition, Mann-Whitney U test (independent sample-nonparametric test) was conducted using SPSS/18 version of statistical package program for comparative analysis between groups. As a result, the priority was highly evaluated in the order of financial ability, competitiveness, disaster in the overall priority evaluation. There were statistically significant differences in internal risk and strategic decision making of supply chain between groups. This suggests that fandemics such as COVID-19 can not be predicted, but strategic responses are needed to utilize opportunities expressed in the crisis through supply chain risk management and to increase the competitive advantage of domestic companies even in the crisis.

대기중 유해 화학 물질의 인체 위해도 우선순위 선정 연구 (Human Health Risk based Priority Ranking for Hazardous Air Pollutants)

  • 박화성;김예신;이동수;신동천
    • Environmental Analysis Health and Toxicology
    • /
    • 제19권1호
    • /
    • pp.81-91
    • /
    • 2004
  • Although it is suggested that risk -based management plan is needed to manage air pollution effectively, we have no resources enough to evaluate all aspects of substances and set priorities. So we need to develop a logical and easy risk-based priority setting method. However, it if impossible that only one generic system that is consistent with all the use is developed. In this study, we proposed a human health risk based priority-setting method for hazardous air pollutants, and ranked priorities for this method. First of all, after investigating previous chemical ranking and scoring systems, we chose appropriate indicators and logics to goal of this study and made a chemical priority ranking method using these. As results, final scores in priority ranking method were derived for 25 substances, and ethylene oxide, acrylonitrile and vinyl chloride were included in high ranks. In addition, same substances were highly ranked when using default values like when using no default, but the scores of hydrofluoric acid and ryan and compounds were sensitive to default values. This study could be important that priorities were set including toxicity type and quality and local inherent exposure conditions and we can set area-specific management guidelines and survey plans as a screening tool.

D대학 수변전설비의 고장모드 영향 분석 (Failure Modes and Effects Analysis for Electric Power Installations of D University)

  • 박영호;김두현
    • 한국안전학회지
    • /
    • 제31권5호
    • /
    • pp.7-15
    • /
    • 2016
  • The purpose of this paper is to carry out Failure Modes and Effects Analysis (FMEA) and use criticality in order to determine risk priority number of the components of electric power installations in Engineering college building of D university. In risk priority number, GROUP A had 7 failure modes; more specifically, Transfomer had 4 modes, Filter(C)(1 mode), LA(1 mode), and CB(MCCB)(1 mode), and thus 4 components had failure modes. In terms of criticality, high-grade group a total of 16 failure modes, and 7 components-LA(1 mode), CB(MCCB)(1 mode), MOF(2 modes), PT(1 mode), Transformer(7 modes), Cable(3 modes), and Filter(C)(1 mode)-had failure modes. Comparison of risk priority number and criticality was made. The components which had high risk priority number and high criticality were Transformer, Filter(C), LA, and CB(MCCB). The components which had high criticality were MOF and cable. In particular, Transformer(RPN: 4 modes, Criticality: 7 modes) was chosen as an intensive management component.

도로절개면 투자우선순위 결정기법 개발 (Development of Rock Slope Risk Rating System for the Determination of the Priority of Investment)

  • 구호본;박혁진;민기복;정의진;김춘식;박성욱
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2000년도 봄 학술발표회 논문집
    • /
    • pp.411-418
    • /
    • 2000
  • With the limited amount of budget and time, it is required to determine the priority of investment when there are a large number of hazardous slopes. In this paper, the Rock Slope Risk Rating System is developed based on the combination of the hazard of failure and the damage potential. By applying the proposed rating system to 253 rock slopes in Korean National Highway, it was possible to determine the priority of investment on road cut slopes.

  • PDF

재해분석을 통한 화학공장의 위험성 평가에 따른 화학설비의 위험도 우선순위 (Risk Priority Number of Chemical Facilities by the Risk Assessment of Injury Analysis in the Chemical Plant)

  • 신운철
    • 한국가스학회지
    • /
    • 제17권4호
    • /
    • pp.39-44
    • /
    • 2013
  • 최근 화학공장에서는 대형 폭발사고 등이 주로 유지 보수의 정비 시에 많이 발생되고 있다. 정비 시에 효과적인 재해예방을 하기 위해서는 핵심대상을 찾는 것이 매우 필요하다. 이 논문에서는 재해예방의 핵심요인을 찾기 위해 핵심대상으로 화학설비를 선정하였고, 화학설비별로 위험순위도를 정하여 재해예방의 대책을 세우는 우선순위를 밝히고자 하였다. 연구방법으로 화학설비의 종류는 재해분석을 통하여 찾고, 화학설비별 위험도는 재해분석을 통해 가능성인 재해빈도와 중대성인 재해강도의 근로손실일 수를 기준하여 산정하였다. 또한 화학설비별로 전문가들의 지식과 경험을 바탕으로 한 지식기반 기법에 의한 가능성과 중대성 자료를 활용하여 위험도를 산정하였다. 연구결과, 화학공장의 정비 시에 재해예방을 위해 화학설비별 위험순위는 반응기, 건조기, 탱크로리 등의 순위로 나타났다. 이 결과로부터 화학공장의 정비 시에 재해예방을 위해 위험순위에 따른 각별한 대책과 주의를 기울여야 할 것으로 사료된다.

퍼지이론을 이용한 철도 전력 설비의 Risk Priority Number 산정 (Evaluation for Risk Priority Number of Railway Power System Facility using Fuzzy Theory)

  • 이윤성;변융태;김진오;김형철;이준경
    • 한국철도학회논문집
    • /
    • 제12권6호
    • /
    • pp.921-926
    • /
    • 2009
  • 신뢰도 기반 유지보수의 연구가 진행됨에 따라 설비의 신뢰도를 바탕으로 한 효율적인 유지보수 업무가 가능하게 되었다. Risk Priority Number(RPN)는 시스템을 구성하고 있는 설비에 대한 Severity(S), Occurrence(O), Detection(D)을 각각 평가하고 이를 하나의 통합된 수치로 표현함으로써 설비간의 유지보수 우선순위에 관한 정보를 제공한다. 하지만 철도 전력 설비와 같이 통계적인 고장 데이터가 부족하거나 신뢰성이 떨어지는 경우에는 이들의 평가가 객관적으로 이루어지기 어렵다. 따라서 본 논문에서는 설비의 Occurrence를 평가하기 위해 퍼지 이론을 이용한 고장률 가공 방법을 제시하고, 객관적인 Severity와 Detection 평가를 이용하여 Risk Priority Number를 계산하는 새로운 방법을 제시하였으며, 이를 철도 변전소 모의 시스템에 적용시켜 보았다.

우리나라의 환경문제 우선순위 도출 - 환경전문가를 중심으로 - (The Priority of Environmental Problems in Korea)

  • 신동천;임영욱;박종연;장은아;김진용;박성은;조성준
    • Environmental Analysis Health and Toxicology
    • /
    • 제14권4호
    • /
    • pp.165-174
    • /
    • 1999
  • This study was conducted to analyze the priority of environmental problems in Korea by investigating the environmental professionals' perception. The delphi technique was applied to identify their risk perception towards some specific items related with pollution. A standardized questionnaire on environmental problems and their priorities was used to 74 subjects. In the questionnaire, the environmental problems were divided into the general ones,9 items, and the specific ones,30 items. Also, the perception was associated with two points of view which were the risk on general human health or ecosystem, and on the present situation in Korea. The priority of risk from general environmental problems on human health or ecosystem was analyzed in the order of 'water pollution', 'air pollution', 'soil contamination', 'waste', 'toxic chemical pollutants', 'food contamination', 'ocean contamination', 'odor pollution', and 'noise pollution'. The priority of risk on the present situation in Korea was analyzed in the order of 'water pollution','air pollution','waste','toxic chemical pollutants','food contamination','soil contamination','ocean contamination','odor pollution', and 'noise pollution'. And these priorities were significantly related with the characteristics of respondents such as sex, age, and major concerned area. However, for the first five priorities of risk from the specific environmental problems on human health or ecosystem, the environmental professionals agreed with 'automotive vehicle exhaust', 'domestic and industrial source pollutants to surface water', '$CO_2$nd g1oba1 warming effect','toxic air pollutant' and 'industrial source air pollution'. The priorities of risk on the present situation in Korea were similar to these results.

  • PDF

계통연계형 에너지저장시스템의 위험우선순위 분석 (Analysis of Risk Priority Number for Grid-connected Energy Storage System)

  • 김두현;김성철;박전수;김은진;김의식
    • 한국안전학회지
    • /
    • 제31권2호
    • /
    • pp.10-17
    • /
    • 2016
  • The purpose of this paper is to deduct components that are in the group of highest risk(top 10%). the group is conducted for classification into groups by values according to risk priority through risk priority number(RPN) of FMEA(Failure modes and effects analysis) sheet. Top 10% of failure mode among total potential failure modes(72 failure modes) of ESS included 5 BMS(battery included) failure modes, 1 invert failure mode, and 1 cable connectors failure mode in which BMS was highest. This is because ESS is connected to module, try, and lack in the battery part as an assembly of electronic information communication and is managed. BMS is mainly composed of the battery module and communication module. There is a junction box and numerous connectors that connect these two in which failure occurs most in the connector part and module itself. Finally, this paper proposes RPN by each step from the starting step of ESS design to installation and operation. Blackouts and electrical disasters can be prevented beforehand by managing and removing the deducted risk factors in prior.