In this paper we deal with the APARP theory which has been applied for UK railway system and risk assessment method which has been using in the domestic railway system for the safety demonstration. Both techniques are applied to the ATP wayside equipment for interface. Also, fur the applications of each techniques a analysis of the safety activity and a possibility of the application of ALARP theory are evaluated. Finally, we generate requirements of the safety demonstration for the future domestic railway system by way of the analysis of some assumptions and requirement data which can be applied to the risk assessment of ALARP.
Journal of the Korean Society for Precision Engineering
/
v.21
no.6
/
pp.179-187
/
2004
In this study, for a safety assessment of wheelchair occupant in frontal and side impact of wheelchair loaded vehicle, a sled impact test was perfumed. Each test was carried out total 6 times, by using Hybrid III 50th-percentile male dummy in light weight and electric wheelchair. We estimate MC(Motion Criteria), CIC(Combined Injury Criteria), HIC(Head Injury Criteria), HNIC(Head and Neck Injury Criteria) based on measured data. Through this study, we make an assessment of risk analysis of wheelchair occupant and wheelchair. Through this study, safety standard of wheelchair is to be evaluated.
Journal of the Korean Society of Hazard Mitigation
/
v.11
no.3
/
pp.151-156
/
2011
Previously most of flood prevention efforts have been made for relatively large watersheds near to channel flow. However, as economical development and the expansion of leisure areas to mountainous region, human casualty by flash flood occurs frequently, requiring additional prevention activity. Therefore, to reduce the damage of human lives and property by flash flood, we develop an assessment method for flash flood occurrence for mountainous areas considering various factors involving it. PROMETHEE(Preference Ranking Organization METHod for Enrichment Evaluations) which is one of the MCDM(Multi-Criteria Decision Making) was adopted to assess the contribution of each factor to the risk of the flash flood in the mountainous area. The main evaluation criteria are classified into three categories, namely, the regional and rainfall characteristics, and geographical features. Also, the Entropy method is used to determine the weight of each evaluation criteria without survey. The suggested method based on PROMETHEE with Entropy method is applied to BongHwa region to verify its applicability. After applied, the method successfully assesses the relative risk of flash flood occurrence of each sub region in the BongHwa region. Out of the seventeen sub-regions, five, seven and five of them are evaluated as high-risk, medium-risk, and low-risk, respectively. To verify the results, we searched the historical data of flash flood and the flash flood had occurred in one of high-risk sub-regions at 2008.
Journal of the Korean Society of Hazard Mitigation
/
v.5
no.4
s.19
/
pp.9-15
/
2005
This research developed the RMIS(Risk Management Information System) which focus on works of risk management fields required of apply of a space information, and focus on the DB to establish and apply the space information efficiently with research scope on the LPG refueling station in city. On the basis of the RMIS, this research provides the baseline to lead on an efficiency of safety inspection of LPG refueling station, advance risk assessment, and efficient making decision of an accident correspondence assessment with interlocking the GIS representing risk through the automation of a quantitative risk assessment standardize requirement to control at real-time. The RMIS development process is as follows. firstly, Relational Database(RDB) was developed by using fundamental data both On-site and Off-site relating data as peforming risk assessment on the LPG refueling station in city. Second, the risk management integral database system was developed to monitor and control the risk efficiently for user with using the Visual Basic Program. Third, through interlocking the risk management integral database system and the GIS(Falcon-map) was suggested the decision making method. Represented results through out the RMIS program development are as follows. Firstly, the RMIS was established the mutual information to advance management the risk efficiently for user and inspector with using the risk management data. Second, as this study managed risk for on-site and off-site separately and considered effect for inside and outside of facility, constructed the basis on safety management which can respond to major accident. Third, it was composed the baseline to making decision that on the basis of user interface.
Journal of the Computational Structural Engineering Institute of Korea
/
v.27
no.5
/
pp.437-450
/
2014
In this study, we developed a methodology to determine the reference parameter for an aircraft impact induced risk assessment of nuclear power plant (NPP) using finite element impact analysis of containment building. The target structure used to develop the method of reference parameter selection is one of the typical Korean PWR type containment buildings. We composed a three-dimensional finite element model of the containment building. The concrete damaged plasticity model was used for the concrete material model. The steels in the tendon, rebar, and liner were modeled using the piecewise-linear stress-strain curves. To evaluate the correlations between structural response and each candidate parameter, we developed Riera's aircraft impact force-time history function with respect to the variation of the loading parameters, i.e., impact velocity and mass of the remaining fuel. For each force-time history, the type of aircraft is assumed to be a Boeing 767 model. The variation ranges of the impact velocity and remaining fuel percentage are 50 to 200m/s, and 30 to 90%, respectively. Four parameters, i.e., kinetic energy, total impulse, maximum impulse, and maximum force are proposed for candidates of the reference parameter. The wellness of the correlation between the reference parameter and structural responses was formulated using the coefficient of determination ($R^2$). From the results, we found that the maximum force showed the highest $R^2$ value in most responses in the materials. The simplicity and intuitiveness of the maximum force parameter are also remarkable compared to the other candidate parameters. Therefore, it can be concluded that the maximum force is the most proper candidate for the reference parameter to assess the aircraft impact induced risk of NPPs.
Objectives: The purpose of this study is to investigate human health risk assessment of indoor air pollutants at small-sized public-use facilities (e.g., daycare centers, hospital and elderly care facilities) that the susceptible population is mainly used. Methods: To assess indoor air quality (IAQ), the concentrations of indoor air contaminants such as HCHO, benzene, toluene, ethylbenzene, xylene, styrene, PM-10, CO, $NO_2$ and $O_3$ in air samples were measured according to the Indoor Air Quality Standard Method. By conducting the questionnaire survey, the major factors influencing IAQ were identified. Human health risk assessment was carried out in the consideration of type of use (user and worker) at 75 daycare centers, 34 hospitals and 40 elderly care facilities. Results: As a result of measurement of indoor air contaminants, the average concentration of HCHO and TVOCs in hospitals was higher than daycare centers and elderly care facilities, about 8.8 and 23.5% of hospitals were exceeded by IAQ standard. In human health risk assessment, for the user of daycare centers and elderly care facilities, the mean carcinogenic risk of HCHO inhalation was higher than acceptable value. Except for HCHO, other values were determined under acceptable risk. Similarly, for the worker of hospitals, the mean carcinogenic risk of HCHO inhalation was higher than acceptable value and other values were evaluated under acceptable risk. In contrast, the risk levels of other contaminants measured in elderly care facilities were acceptable. In the determination of factors influencing IAQ, the construction year, building type, ventilation time, and the use of air cleaner were identified. Conclusions: This study provides the information for establishing the plans of public health management of IAQ at small-sized public-use facilities that have not yet been placed under the regulation. The findings suggest the consideration of human health risk assessment results for the IAQ standards.
To provide a development strategy on the method which assesses a potential risk of nationwide emerging IT infrastructure in planning and design phase, and to classify the assessment result into 5 levels is the goal of this research. The development strategy provided in this paper could improve a benefit-cost-ratio of investments on emerging IT infrastructure. With a premature assessment of the potential risks of a nationwide emerging IT infrastructure which needs astronomical amount of public funds, it could show a way of systematic investments on security systems and improve a benefit-cost-ratio of investments on emerging IT infrastructure. Also, this approach might improve the safety of nationwide IT infrastructure. It could identify and provide an optimized solution for the potential risks of nationwide IT infrastructure.
Purpose: Screening of delirium using delirium assessment tools could promote delirium detection, however, there is lack of report about regular delirium assessment in Korea. This study was intended to describe the prevalence and related risk factors of delirium in intensive care unit (ICU). Methods: The Confusion Assessment Method for the ICU (CAM-ICU) data which were evaluated by nurses in ICUs was obtained through retrospective chart review. Data were analyzed using descriptive statistics, Chi-square test, t-test, Mann-Whitney U test, and stepwise logistic regression. Results: Delirium was evaluated in 125 patients. The incidence rate of delirium was 27.2% with a high prevalence of hypoactive delirium compared to hyperactive delirium (61.8 vs. 38.2%). Those with delirium were older, had hypertension, stayed longer in hospital, receiving ventilator support, had more number of catheters, had low serum protein and albumin level. Delirium incidence also varied according to diagnosis. Age, diagnosis of gastrointestinal disease, and application of ventilator were the significant risk factors for the incidence of delirium. Conclusion: Routine delirium screening is important for early detection of delirium. Identification of high-risk group and running delirium prevention programs could improve early recognition of delirium in ICU.
Corrosion assessment has a number of uses but the use considered here is as a precursor to Risk-Based Inspection (RBI) planning. Systematic methods consisting of technical modules of RBI program were used to assess the effect of specific corrosion mechanism on the probability of failure in equipments of petrochemical plants. Especially in part of the damage and corrosion assessment, screening step involved evaluating the combinations of process conditions and construction materials for each equipment item in order to determine which damage mechanisms are potentially active. For general internal corrosion, either API 510 or API 570 was applied as the damage rate in the calculation to determine the remaining life and inspection frequency. In some cases, a measured rate of corrosion may not be available. The technical modules of RBI program employ default values for corrosion, typically derived from published data or from experience with similar processes, for use until inspection results are available. This paper describes the case study of corrosion and damage assessment by using RBI methodology in petrochemical plant. Specifically, this paper reports the methodology and the results of its application to the petrochemical units using the $KGS-RBI^{TM}$ program, developed by the Korea Gas Safety Corporation to suit Korean situation in conformity with API 581 Codes.
In this paper, we present a method for mitigating the effect of voltage sag in radial power distribution systems using load transfer switching (LTS). The term of LTS is defined that the weakness load points for voltage sag transfer to the alternative source during the fault clearing practices. The sequences of proposed LTS method is divided into the search of weakness points for voltage sag using the risk assessment model and transfer behavior of weakness points. Through the case studies, we verify the effectiveness of proposed LTS method and present the searching method of effective application points of LTS method using the risk assessment model.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.